List of latest m-r-i Tenders in Indian Tenders. Click on any m-r-i Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for m-r-i Tenders.
Tender for tender for construction of transit cared-selected">mp/field hostel at 765/400 kv dausa new substation all equipred-selected">ment (red-selected">machineries/ lifting t&ps/ wire sling/ polypropylene ropes etc.) shall be strictly operated /used and red-selected">maintained by the contractorin accordance with red-selected">manufacturer’s operation red-selected">manual /safety instructions and as per guidelines /rules of ered-selected">mployerin this regard.
Tender for tender for dadokhar pond, village- red-selected">mahera, block- red-selected">muskara - pond restoration work underrain water harvesting and ground water enrichred-selected">ment schered-selected">me - excavation in earthwork in red-selected">mar, kabar, ranker and kankarred-selected">mixed soil in digging including lead up to 30red-selected">m and lift upto 1.5red-selected">m including dressing red-selected">making profile and red-selected">manual cored-selected">mpaction but excluding red-selected">mechnical cored-selected">mpation. (ch-4, 4.04(e)) 2 excavation in earthwork (by any red-selected">means) in red-selected">mar, kabar, ranker and kankarred-selected">mixed soil in digging including lead up to 30red-selected">m and lift (beyond 3.00red-selected">m lift) including dressing red-selected">making profile and red-selected">manual cored-selected">mpaction but excluding red-selected">mechnical cored-selected">mpation. (upid si no. 4.15) 3 excavation in earthwork (by any red-selected">means) in red-selected">mar, kabar, ranker and kankarrered-selected">moval of slus (excluding cost of dewatering) including lead up to 30red-selected">m and lift upto 1.5red-selected">m including dressing red-selected">making profile and red-selected">manual cored-selected">mpaction but excluding red-selected">mechnical cored-selected">mpation. (upid si no. 4.13) 4 excavation in earthwork (by any red-selected">means) in red-selected">mar, kabar, ranker and kankar sturated soil in digging including lead up to 30red-selected">m and lift (beyond 3.00red-selected">m lift) upto 1.5red-selected">m including dressing red-selected">making profile and red-selected">manual cored-selected">mpaction but excluding red-selected">mechnical cored-selected">mpation. (upid si no. 4.17) 5 excavation in earthwork (by any red-selected">means) in red-selected">mar, kabar, ranker and kankarrered-selected">moval of slus (excluding cost of dewatering) including lead up to 30red-selected">m and lift upto 1.5red-selected">m including dressing red-selected">making profile and red-selected">manual cored-selected">mpaction but excluding red-selected">mechnical cored-selected">mpation. (upid si no. 4.12) 6 earthworkiin foundation of wall piers abutred-selected">ments etc with disposal with in 30red-selected">m lead and 1.5red-selected">m lift by hydraulic/red-selected">mechanical excavatorid s.no. (b) 7 sand filling for foundation inlet, outlet, rared-selected">mp 8 c.c. in 1:3:6 cered-selected">ment, sand and20-40red-selected">mred-selected">m gauge stone ballast including the cost of red-selected">materials labours and etc. required for proper cored-selected">mpletion of work. 9 r.c.r. stone red-selected">massonery work in 1:4 cered-selected">ment sand red-selected">mortarincluding the cost of red-selected">material, labour etc. required for proper cored-selected">mpletion of work. 10 supply of fixing of 1000red-selected">mred-selected">m dia np3 hured-selected">me pipe with coller all cost cored-selected">mplete. 11 c.c. in 1:2:4 cered-selected">ment, sand and10-20red-selected">mred-selected">m grit including the cost of red-selected">materials labours and etc. required for proper cored-selected">mpletion of work. 12 plastering in 1:2 cered-selected">ment sand red-selected">mortarincluding the cost of red-selected">material labour etc. to required for proper cored-selected">mpletion of work. 13 dry stone boulder filling in chared-selected">mber 14 dewatering during work by 8hp dp set