Latest and live tenders published in bangladesh. Click on any tender to view further details.
supplying installation testing and commissioning of computerized toll collection system for toll plaza of shah amanat bridge 3rd karnaphuli bridge at newly constructed additional 2two nos. toll booth under road division during the year 2020-2021.
eviction and landscaping of different rivers/khals in gazipur in c/w re-excavation of small rivers khals & water bodies in 64 project phase-1 1st revised under o&m division during the year 2020-2021.
procurement of different spare parts of steam bypass system under the e&ic division of 225mwccpp of apscl.
procurement of 250mm dia gate valves and other related spares for water transmission network
procurement of izonil cement mesh & other necessary items for the leakproof work
removal of garbage hyacinth slushy earth jungles and other obstacles for drainage from i mdc up km. 0.00 to km.7.00 7.00 km ii mdc down km. 0.00 to km.5.000 5.00 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
removal of garbage hyacinth slushy earth jungles and other obstacles for drainage from i sdc-1 km. 0.00 to km.1.60 1.600 km ii sdc-2 km. 0.00 to km.1.50 1.50 km iii sdc-3 km. 0.00 to km. 5.00 5.00 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
removal of garbage hyacinth slushy earth jungles and other obstacles for drainage from i sdc-4 km. 0.00 to km. 3.60 3.60 km ii sdc-5 km. 0.00 to km.7.50 7.50 km iii sdc-6 km. 0.00 to km. 5.50 5.50 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
removal of garbage hyacinth slushy earth jungles and other obstacles for drainage from i sdc-7 km. 0.00 to km. 2.00 2.00 km ii sdc-8 km. 0.00 to km.3.80 3.80 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
removal of garbage hyacinth slushy earth junglesand other obstacles for drainage from i sdc-8a km. 0.00 to km. 3.00 3.00 km ii sdc-8b km. 0.00 to km.4.50 4.50 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.