Latest and live tenders published in bangladesh. Click on any tender to view further details.
supply of sovel loader pump, master cylinder, distributor, gear piston, regulator & central auto-controller, spare parts for gear boxes, fork lift, fis-plate, joint plate, angkor bold screw & nut-bolt, gear boxes body & ms matels middle part, cupling arm, silicon rectifire, air cylinder & supply of sovel loader pump, master cylinder, distributor, gear piston, regulator & central auto-controller, spare parts for gear boxes, fork lift, fis-plate, joint plate, angkor bold screw & nut-bolt, gear boxes body & ms matels middle part, cupling arm, silicon rectifire, air cylinder & filter, auto compressor switch, lub oil, greez, hydrolic oil, lubricant, gear boxes complete set, segra-8, moving wheel, gear box with ac motor, sak heding dye, bearing, travers trolley pinion, cupling, wire pully complete set, wood, through bolt, rajan, polythene & jute goods, spare parts, jaw-plate, pinion, shaft for koun crasher, crushing plant, earthing box group 29).
supply of stationery goods.
civil repair & maintenance of control room, repair of boundary wall, barbed netting with jungle cleaning, earth filling and purchase of different sizes pipe with fittings 05 groups).
procurement of 2nd stage nozzle with fixing hardware for unit no. 8&9.
procurement of air filters fre-filter pad, demister coalescing pad & high efficiency filter cartridge).
construction and completion of erection works of hobiganj, kulaura, sararchar & bhoirob 33/11 sub-station.
construction work for water projects; works for complete or part construction and civil engineering work;
improvement of matborbari mor- gajipur govt. primary school- kirtinagar duthbazar- taltala road at ch:0.00-3890.00m by bc and construction of 2 nos. r.c.c. box culvert size:2.00*2.50*2.00m at ch:2340.00m & 2710.00m on the same road.
construction of 48m span rcc girder bridge over dangir kura khal on koila mosque to singria via south charanga road at ch: 0+450 km under jaldhaka upazila
construction and completion of erection works of bhuapur, gafargaon and trishal 33/11 sub-station.`