periodic maintenance programme pmp) providing dbst of comilla-lalmai-chandpur-laxmipur-begumgonj road r-140) at ch. 31+000 to 47+250, ch. 61+300 to ch. 67+300, ch. 70+300 to ch. 79+800 & ch. 80+900 to ch. 81+900 and periodic maintenance programme pmp) providing dbst of kaliapara-kachua road z-1050) at ch. 0+000 to ch. 12+500 under road division, chandpur during the year 2013-2014. package no. ace/rhd/comilla zone/2013-2014/02.
maintenance of part - a ) protective work at bridge of approach harinakundu gc to shaduhati r&h road. ch. 10200 & part -b ) earth filling work at bridge approach harinakundu gc to shaduhati r&h road. ch. 10200 part-c) wheel guard, railing & rail post repair of rishkhali bridge at ch.10200m harinakundu)
dbst including necessary repairing by aggregate base type-i, carpeting, seal coat, construction of saucer drain, earthen shoulder and thermoplastic road marking work at lrp 02a ch. 1+230) to lrp 013a ch. 12+378)= 11.148 km and lrp 027a ch. 26+692) to lrp 028 ch. 27+171) = 0.479km & lrp 030 ch. 29+171) to lrp 031a ch. 30+429) = 1.258 km total= 12.975 km of comilla-lalmai-chandpur-laxmipur-begumgonj road road no. r-140) anddbs surfacing work including potholes repair, construction of saucer drain and construction of earthen shoulder form ch. 7+500 to ch. 11+980 & ch. 19+000 km to ch. 31+400 of laksham doulatgonj)-nangolkot-kodalia-dalua-chewera bazar road z-1048) under road division, comilla during the year 2013-2014. package no. ace/ rhd/comilla zone/2013-2014/ 04.
dbs wearing course under pmp/2013-14 including patch repairing and profiles correction at different km of eliotgonj-muradnagar-ramchandrapur-salpa-sreekail road z-1042) under road division, comilla during the year 2013-2014 andrepairing, strengthening in the damaged existing pavement, carpeting, seal coat protective work under periodic maintenance programme at lrp ch. 30+520 to 42+020 of eliotgonj-muradnagar-ramchandrapur-bancharampur road under road division, brahmanbaria during the year 2013-2014.
resectioning of submersible embankment of tangua haor from km 5.000 to 7.500 = 2.500 km under under sunaganj o&m division, bwdb, sunamganj during 2013-14.
repairing of damaged rcc slab of culvert & repairing of damaged pavement by base type-ii and providing carpeting seal coat work of both side of culvert approach at 10th km. of bharaduba-sagardhigi-ghatail road under mymensingh road division during year 2013-2014.
repair, partial widening, strengthening and overlay work of tongi-kaligonj-ghorashal-pachdona road r-301) ch. 0+000m to 09+600m, 24+200m to 31+550m kaligonj bazar road) under gazipur road division during the year 2013-2014 pmp-2013-2014
maintenance of khalada zia road golapirbaper baper kaber-jagraghona mosque road) ch. 650-1200m moheskhali)
earth work by embankment fill from borrow fit at 52nd k.m. of chittagong-coxs bazar national highway for construction of portable axle load control station shed under dohazari road division, during the year 2013-2014.
repair/maintenance and breach closing of canal dyke from km 15.000 to 15.180 and from km 16.250 to 16.500, jungle cutting and removal of water hyacinth from km 8.000 to 18.000 of main canal of manu mukh canal system in c/w manu river project under moulvibazar o&m division during the year 2013-14.