Latest and live tenders published in bangladesh. Click on any tender to view further details.
supplying, installation and operation & maintenance of protable axle load control system at 3rd km. of comilla moinamoti)-brahmanbaria sarail) road under road division, comilla during the year 2013-2014
widening of road embankment by earthwork, strengthening and widening of existing pavement, surfacing by dbs and protective work at 7th and 8th p) ch. 6+000 to 7+600), 21st p) and 22nd km. ch.20+400 to 22+000) of baburhat-matlab-pennai road under road division, chandpur during the year 2013-2014
mwbr/04/trd/2013-14/ 01)/w1 sub-soil investigation for proposed postkumari bridge at 1st km of mirzapur-warshi-balia road z-5061) under tangail road division, during the year 2013-2014.
supplying of local sand f.m. 0.50), stone chips & pea-gravels for maintenance of different road of sylhet road sub-division, sylhet under sylhet road division, sylhet during the year 2013-2014
leasing for toll collection of shewla bridge at 8th km. of charkhai-shewla-beanibazar-baraigram road under sylhet road division, sylhet during the year 2013-2014.
quotation notice for toll collection of one year of sayed sultan mokrampur) bridge under rhd, road division, nawabgonj during the year 2013-2014.
quotation notice for toll collection of one year of shahid captain mohiuddin zahangir birshasta mahananda) bridge under rhd, road division, nawabgonj during the year 2013-2014
8 eight) lanning of at 7th km, 8th km & 9th km p) of jatrabari-katchpur road polder road) for widening pavement at new 4 four) lane under narayanganj road division during the year 2013-2014. ch. 6+000m to 8+200m=2200.00m).
toll collection for 1 one) year from the vehicles plying over the tailardip bridge at 23rd k.m. of patiy-anowara-banshkhali-toitong road under dohazari road division during the year 2012-2013 and 2013-2014 14th call).
contract package no.pmp b&c)/dz/04/2013-2014/br-01 : reconstruction construction of 48.80 meter 1 x 48.80 meter) long p. c. girder bridge tulkai bridge) in replacement of existing damaged bailey bridge at 24th km of fatullah-munshigonj-louhajonj-mawa road under munshigonj road division during the year 2013-2014