improvement of dewan bari-vokter bari road ch. 00-1500m. id no. 451585463. . under raipur upazila districtlaxmipur.. construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator
construction of 39.00m rcc girder bridge over wapda khal on nurullapur wapda bridge-shankihnga-deghuli bazar road nurullapur-shankibanga road at ch. 05m. id no. 451434236. under sadar upazila districtlaxmipur. construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator
renovation and repairing works at faridpur dairy farm under livestock and dairy development project dls construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator
dredging of turag river by dredger from km 117.500 to km 123.100 and km 125.100 to km 128.200 total 8.700 km in connection with buriganga river restoration new dhaleswari-pungli-bangshi-turag-buriganga river system project 2nd revised under narsingdi o&m division bwdb narsingdi during the year 2019-2020. construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator
dredging of turag river by dredger from km 110.000 to km 117.500 7.500 km in connection with buriganga river restoration new dhaleswari-pungli- bangshi-turag-buriganga river system project 2nd revised under narsingdi o&m division bwdb narsingdi during the year 2019-2020. construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator
dredging of turag river by dredger from km 102.500 to km 110.000 7.500 km in connection with buriganga river restoration new dhaleswari-pungli- bangshi-turag-buriganga river system project 2nd revised under narsingdi o&m division bwdb narsingdi during the year 2019-2020. construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator
re-excavation of 1.50 km khal and chara in khagrachori district under lot- 02. construction work for water projects; works for complete or part construction and civil engineering work
manufacturing & supplying of furniture to garpara dighi girls high school at sadar upazilla manikgonj district. school furniture; furniture
installation of 20/28 mva transformer at lalbagh old 33/11 kv substation under grid north-1 dpdc electrical installation work; building installation work
development of piller para road by bc at ch 00-1315m. id-422454025 salvage cost 2013782.00b development of dhupi para road by bc at ch 500-1850m. id-422455040 salvage cost 2527236.00c development of ali chan road by hbb at ch 00-550m. construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works;building installation work;electrical installation work;insulation work;plumbing and sanitary works;fencing, railing and safety equipment installation work;mechanical installations;building completion work;plastering work;joinery and carpentry installation work;floor and wall covering work;painting and glazing work;other building completion work;hire of construction and civil engineering machinery and equipment with operator;hire of cranes with operator;hire of earthmoving equipment with operator