Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of plate, skin plate in ss 316l material for travelling water and screen, size : 3 mm thick x 140 mm wide x 550 mm long. aqseptence gr oup gmh make
supply of sd-card; 2g; part no: 36-00810255; for sma fuel save controller; type: fsc-11-daq, serial no: 1900500059; for h.h.ruler#s palace pv solar powerplant at al yassat island., power analyzer; janitza umg 604 part no: 39-0520; for sma fuel save controller; type: fsc-11-daq, serial no: 1900500059; for h.h.rul er#s palace pv solar powerplant at al yass, inline-controller; ilc 191 eth 2tx; part no: 39-012988806; for sma fuel save controller; type: fsc-11-daq, serial no: 1900500059; fo r h.h.ruler#s palace pv solar powerplant, routing switch; redfox rfi-10-sma; part no: 36-070101; for sma fuel save controller; type: fsc-11-daq, serial no: 1900500059; for h. h.ruler#s palace pv solar powerplant at al, power supply; part no: 31-9212; phoenix contact; i/p: 100-240vac, o/p: 24vdc, 3.5a; for sma fuel save controller; type: fsc-11-daq, serial no: 1900500059; for h.h.ruler#s pal, sma cluster controller service device; part no: clcon-10-at; for sma fuel save controller; type: fsc-11-daq, serial no: 1900500059; for h.h.ruler#s palace pv solar powerplant
supply of software for testing e1, v11, 24 and g 703. signalfor more details you may contact:oaid- 0503656373
supply of capacitor, 4.7mfd + 10%, 4000v dc /2700vactype:e62.m17-472c2w, mkp 4.7 mfd, -25 deg. c to +85 deg. c, make :westcode, germany
supply of flow switch, model: cvm15-jl-mo-m4-wp, make: officine oroiche, max flow : 1 mc/hr., set point: 0.36 mc/hr., max pr: 10 ar, temp: 100 c, process: sea water, flange: 1/2 ansi 150 rf, wet part: monal, attraction sleev: nickel, tue: monal, internal parts: monal, supp ly: 125vdc 0.5a, details: as per f 78375/ 2.1 along with monel float.flow switch, model:k-746, make: tokyo keiso, range: 0-120 l/min, adjustale set point:40 l/min and 80 l/min, flow direction: from lef t to right, flange size: 5 flange with 4 screws connection and screw size 12 mm, magnet coupling indication with alarm contact 25 0vac 5 a, distance etween flange to flange 160 mm
supply of avl451304 - 2wd std roof van full panel 1+2 seater
supply of ridgid secktech sr24-1wtc omnidirectional antennas with 8 antennas capture the complete signal field, making it easy to acquire th e signal and trace its path. the receiver should displays the utilitys position and direction to provide an intuitive locating expe rience. an audio and visual warnings notify the operator if the a8shape of the signal field is eing distorted. in-uilt luetooth gps system. with free onsite demo and traning from manufacturer.
1#scope of work and technical specifications: services for replacement of complete transformer oil & leak rectification of three re ctifier transformers at g station. the detailed scope of work is as follows: 1.#introduction & general requirement: a#the work sha ll e at the contractor workshop, shifting the transformer to /from the contractor#s workshop/g station, loading, unloading shall e under contractor scope. the required rigging tools such as slings, lifting hooks etc under contractor#s scope. dewa shall arrange f orklift & portale crane for the unloading & loading of transformers with a prior request. the offer for this shall e given as option -1. alternatively, the work can e carried out at site in the transformer ay itself. this shall e offered as option-2. #drain theoi l & store in the empty container for disposal. empty container /storage tank required for the jo shall e in contractor#s scope. c#i nject and maintain the nitrogen pressure so that winding is not exposed to atmospheric air. d#keep the tank & core coil assemly und er vacuum for 3 to 4 hours to remove any moisture. e#replacing all gaskets, o-rings etc. to arrest the leakages of transformers men tioned in the annexure-1. f#after the leak rectification, flush the transformer tank to remove the sludge#s & refill the transforme r tank with new oil. new oil will e supplied y dewa. g#after replacing the gasket & oil. the oil filtration shall e carried out til l dv reached greater than 60kv and moisture content is less than 5 ppm. h#attend any minor leakage along withreplacing oil rings. any other parts such as hv/lv ushings, ucholz relays etc found damaged during work shall e arranged and replaced with in the schedul e y the contractor on urgent asis after dewa approval. spares will e supplied y dewa. i#take oil sample to confirm the acceptale re sults. oil will e tested at dewa la. j#discuss the final report with dewa representative. k#after the successful completion of the jo, transformer shall e painted with non-corrosive paint. paint shall e provided y the contractor. l#the contractor shall provide systematic procedure for carrying out the aove jo along with the offer. m#the contractor shall provide their past references of car rying out similar jos. 3.#general conditions a#the prospective supplier may visit thesite to check the site conditions and the jo requirements. plant/site visit and correspondence shall e communicated y email to mr. jithesh assistant engineer em g jithesh.tho mas@dewa.gov.ae with copy to mr. mahmoud, sr. engineer-em, mahmoud.adella@dewa.gov.ae and mr. ramasuramanian t s, m-em g, ramasura manian@dewa.gov.ae. the contractor may contact with mr. mahmoud tele: 04-8044694, mo: 055-8906121, mr. jithesh tele: 04-8044783, mo 055-9871857. #all the tools, manpower, and materials required for the work shall e arranged y the contractor. the instruments, whi ch are required for this work, shall have valid caliration certificate. c#forklift & crane facility will e provide only for loadin g & unloading of materials with at least one day prior notice. d#contractor shallprovide the time schedule/ar chart indicating eac h activity on receipt of order. e#contractor shall aide y the safety and security rules/ regulations in- force at the power station s. f#disposal of used oils & any other y products of this jo shall e under contractor scope. g#work shall e carried out in a neat, orderly and safe manner. h#the permit to work shall e arranged y dewa. i#any other parts i.e. hv/lv ushings, found damaged during the work shall e arranged and replaced within the schedule y the contractor on urgent asis after dewa approval and same shall e rei mursed as an additional scope. j#unless specified, the contractor scope shall cover all the items required for completing the jo i n time with safe manner. k#any other parts i.e. hv/lv ushings, found damaged during the work shall e arranged and replaced within t he schedule y the contractor on urgent asis after dewa approval and same shall e reimursed as an additional scope. 4.#safety precau tions. a#the contractor at dewa work premises shall follow dewa safety and environment policy, rules and regulations during the con tract period. #the contractor shall carry out risk assessment for all works. this risk assessment shall e from safety as well as oc cupational health considerations. c#toolox talks shall e given to work men y their supervisor, copy of which shall e given to dewa. d#no welding, flame heating or cutting, grinding, pneumatic chipping etc shall e carried out without specific clearance from dewathrough #hot work permits#. the hot work permit if required shall e otained on daily asis. e#the contractor shall at no time keep i nflammale sustances in the plant /work areas. f#all hazardous wastages shall e moved under direction from and written approval to d ewa special storage area. g#the contractors work will fall within the preview of safety surveys conducted regularly y the dewa safe ty section. h#all the workers should wear necessary ppe required for the jo wherever as applicale. 5.#terms of payment: as per dewa terms and conditions 6.#warranty : a#one year guarantee shall e given for the material supplied & jo carried out y the contractor . #the guarantee will take effect from the date of takeover of the entire system. c#when a defect is noticed on the jocarried out during the period of warranty, the contractor must rectify the fault within a reasonale amount of time fixed y dewa with no claims or compensation. after replacement of the faulty part or rectification of the fault, warranty of the concerned part shall e restarte d for two years. 7.#penalty : as per dewa terms and conditions. annexure-1 slno.#kks#description & location#manufacture# 1#00lt11# 850kva, rectifier transformer electro chlorination plant# frem, italy# 2#00lt12#850kva, rectifier transformer electro chlorination pl ant# frem, italy# 3#00lt13#850kva, rectifier transformer electro chlorination plant# frem, italy# contact mr. jithesh assistant engin eer em g jithesh.thomas@dewa.gov.ae with copy to mr. mahmoud, sr. engineer-em, mahmoud.adella@dewa.gov.ae and mr. ramasuramanian t s, m-em g, ramasuramanian@dewa.gov.ae. the contractor may contact with mr. mahmoud tele: 04-8044694, mo: 055-8906121, mr. jithe sh tele: 04-8044783, mo 055-9871857.
supply of refilling of sf 6 gas in 8 kgs cylinder, 8l, 250 ar
to repair & refurish the defective dc/dc converter unit with specifications; make: gutor, type: c 5774 - 14, sno. 0901-192802/140589 01/490113.1, in: 180-280vdc, out: 24 vdc/333a used in k2 desalination units with one year warranty minimum