Latest and live tenders published in all country. Click on any tender to view further details.
supply of digital multimeter part number: fluke-101 manufacturer: fluke name: ethernet tester part number: tc-nt3 manufacturer: trendnet name: visual fault locator laser part number: fls-140 manufacturer: exfo name: optical attenuator -5 dbm 10pcs/pack part number: at-lcu-10p5 manufacturer: flypro name: optical attenuator -10 dbm 10pcs/pack part number: at-lcu-10p10 manufacturer: flypro
complete overhauling & testing of compressor of mushrif reservoir. make#fini# type#e.c. pulsar concept se 119-500-# code#683tm5a7220 1# sl. no#1060291491# capacity#695 l/min# volum flow#24.56 cfm# pressure#10 bar# power#5.5 kw / 7.375 hp# voltage#400# phase#3# freq uency#50 hz# current#12.7 amps# please contact mr. raj 04-3229440 for further clarifications. scope of work for fini air compres sor overhauling & testing the contractor shall perform the work as per details specified herein. required work detail is in fini ai r compressor overhauling & testing. the below list of technical requirements are to be completed. ##contractor to check the compress or and fully aware the scope of works to be carried out ##compressor unit to be collected from dewa premises and vice
supply of cal.of portable hydrogen meter s.n.7882
supply of hypo chlorination building inside area pipes coating warranty: 02 years
supply, installation & commissioning of ceiling suspended decorative split unit 5 ton 1qty and decorative split units 3 ton 2qty at k # stationsupply, installation and commissioning of ceiling suspended decorative split unit 5 ton 1qty and decorative split u nits 3 ton 2qty at k # station, emd new workshop and i & c workshop.a. required unit specification for 3 ton decorative split ac # 2 qtytype split a/c unit - decorativenominal capacity 3.0 tonrefrigerant ozone friendly refrigerant # r407 or r410make : any standa rd brandb. required unit specification for ton ceiling suspended decorative split ac 1 qtytype split a/c unit # ceiling suspende d decorativenominal capacity 5.0 tonrefrigerant ozone friendly refrigerant # r407 or r410make : any standard brandunits to be instal led at below location:location qtyk
outsourcing work l station phase i, jebel ali name of work: scope of work for hrsg 81/82/8 3/84 duct burner flame stabilizers replacement work. period of work: 5 days during shut down of each hrsg tentative date of shut do wn period from 01.10.2020 to 30.04.2021 replacement quantity: total 200 stabilizers 50 nos / hrsg in 4 hrsgs, material-ss-310 sc ope of work: . ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety measures etc., before he submit his bid. ·#the shutdown period will be from 01.10.2020 to 30.04.2021. party wi ll get one unit at a time. therefore, party has to come to the site four times to execute the job. ·#to get a ptw, hwp contractor ha s to submit risk assessment forms and
supply of complete set for ansaldo make motor-type ctv 1000 y12, make: ansaldo, with accessoreis having following part num ber: emr191348, emr148396, emr103580, emr181069, emr102582, emr102291, emr162804 assembly motor fan-casing, make ansaldo: part no. emr252518 for phase 1 potable water pump motor assembly motor fan-casing, make ansaldo: part no. emr263947 for phase 2 distillate extraction pump motor
supply of scope electrical specialist services for e4 generator at e-station, phase-ii. jebel ali. detail scope: 1. vendor has to perf orm borescopic inspection of gte4 generator rotor cooling chutes modification at de&nde sides by generator specialist. 2. necessary qualified skilled labor, including labor supervision and certified equipment operators, cranes, special tools, certified slings and rigging plus scaffolding that may be required in connection with the services will be supplied by dewa. 3. borescope shall be supp lied by the vendor to carry out the job. 4. detailed report with recommendation to be submitted. 5. the remaining terms and condit ions as per the ge oem proposal reference no 1533716-20-rsaa dated 6th july 2020 is attached for reference.
collection/handling/testing of transformers oil 11 nos. samples: - perform oil sample tests on 11 nos oil samples collected from power transformers in l1 station as follow: 1- inhibitor content, test method s per iec 60666. 2- dbds, test method as per iec 62697. 3-corrosive sulphur, test method as per astm d 1275b. 4- potential corrosive sulphur test covered conductor dispo sition test, test method as per iec 62535. the supplier has to provide the required syringes/metal bottles, collect the samples by their staff, and transport the samples from l1 station to their lab. - signed hard copy test reports for all samples with full t echnical details to be submitted to dewa. for sample collections / technical
supply of component sets for transformer test lab, ame, italy a n°1 css dt/1 computer aid system for the measures and results all the control desk function can be controlled and monitored through a data acquisition system connected to a computer with the following characte ristics: industrial computer processor core i5 or better n° 2 lan board 10-100-1000 4 gbytes ram memory 250 gbytes hard disk wireles keyboard with mouse operative system windows 7® professional english version n°1 monitor 21 tft 1920x1080 colour printer acquisit ion system based on opc server# for plc siemens technology computer control of the test room with report printing through a industri al computer with opc server® technology for high stability system with windows 7® professional os english version. ame test