Latest and live tenders published in australia. Click on any tender to view further details.
supply of department of the environment and energy’s, supervising scientist branch ssb is tasked with protecting the alligator rivers region arr of northern australia from the effects of uranium mining. at present, ranger uranium mine is the only operational mine in the arr and must cease operations in 2021. the mine must finish decommissioning and revegetation of the site by 2026.
supply of geoscience australia is seeking expressions of interest from landowners to host new global navigation satellite system gnss ground station sites on their land.
supply of accc is seeking to establish a contract with a supplier for the provision of international crude oil and petroleum benchmark price data
supply of customised materials are required to support the facilitiation of hte voting process, and include products used: a during the voting process; including banners, hazard/barrier tape, and bollot boxes; b by polling officials; including bibs and vests, badge holders, lanyards and certified list rulers; c in transporting, counting and storing ballot material; including tamper evident tape, security seals and hi-viz vests.
service includes promoting the exhibition and signing on venues; contract negotiations with venues and lenders; stakeholder management; the management of freight transfers between venues; full exhibition installation and demount services; exhibition storage between venues if required and exhibition maintenance.
clean energy regulator cer is seeking submissions from suitably qualified and experienced organisations for the provision of greenhouse and energy audit services. the cer will establish a panel of suitably qualified and experienced organisations at the conclusion of this procurement process.
design, migration and support services for airservices australia’s odas database in a postgresql/postgis instance, moving the odas database to a geo-enabled rational database management system rdbms in a platform as a service paas solution.
works are identified and specified by reference to the ghd design documents in the request documents. the major elements of the fit out include: a architecture i. construction of data processing equipment rooms ii. construction of console rooms with flooded floor plenum iii. construct training rooms iv. construct a video conference room v. construct meeting rooms vi. construct open plan office workspace vii. construct testing workstations area viii. demolition works as shows on the drawings ix. construct partitioning to suit zone 2 and zone 3 security areas, including supply and installation of new hardware and access controls, including the addition of structural silicon to the internal face of existing glazing b electrical i. supply and installation of exposed services and cable trays ii. decommission, demolition, disposal off site of the redundant electrical and communications services as identified iii. the supply, installation, testing, commissioning, maintenance and warranty of the electrical and communications services as identified c mechanical i. decommission, demolition, disposal off site of the redundant mechanical services as identified ii. the supply, installation, testing, commissioning, maintenance and warranty of the mechanical services as identified d fire i. carry out hydraulic calculation to determine the maximum flow and pressure requirement of the sprinkler system within the project refurbishment area. ii. allow to upgrade fire sprinkler pumps and reconnect the existing pipes to the upgraded fire sprinkler pumps. the pump duty shall be based on the above hydraulic calculation. iii. reroute the existing supply main to the roof and reconnect to the existing sprinkler main. iv. replace the ex air-compressor with a new one for the pre-action sprinkler system. v. alter existing sprinkler system as shown on the drawings. vi. provide metal guard to ceiling space and underfloor space sprinklers in jssf racks, jssf & sps consoles and asts room. vii. new sprinklers and pipes in gas bottle storage room. viii. supply and install new monitored isolating valves to enable zone isolation. ix. supply and install drain valve to underfloor sprinkler pipes. the fit out works exclude: a provision and installation of new data processing equipment b provision and installation of the consoles, workstations and furniture items c communications cabling between the equipment rooms and the consoles and the testing workstations.
airservices is seeking to establish a panel of recruitment service providers to deliver recruitment of permanent staff and temporary staff and the supply and payrolling of contractors.
supply of commonwealth and raytheon australia will be running a joint industry event to advise of future opportunities for the provision of key aircrew personnel to provide tactical and operational support for live and synthetic training activities. the key personnel shall support the following australian defence force exercise control functions: concept development, mission design, mission management, exercise design review and lessons and exercise support as required by the commonwealth. the requirement is for 3 of each of the following key personnel positions 15 total: mission director, battle management co-ordinator, scenario co-ordinator, operations co-ordinator and air-to-surface coordinator.