Latest and live tenders published in australia. Click on any tender to view further details.
australia-singapore military training initiative asmti will see the delivery of enhanced military training areas in central and north queensland. under the asmti, singapore will invest approximately aud 2.25 billion for the commonwealth to acquire, design, develop and construct military training areas through expanding the existing shoalwater bay training area swbta and establishing a new training area near greenvale, in north queensland. the construction work at the new training area near greenvale is expected to be delivered in two phases, early and main works.
ervices include: embedded industry partner services, which will require the successful applicant to leverage its expertise, experience and resources to develop and deliver the directorates program of infrastructureprojects in collaboration with and on behalf of the directorate industry partner services; and subject to the contract and where this represents value for money for defence, project management and contract administration services pmca services, and, where required, to provide certain other services such as design services to support the development anddelivery of individual infrastructure projects together the services.
services include design and related services in respect of the following works: · new facilities to provide exhibition space, storage, maintenance, training and administrative functions; and · new services and in-ground infrastructure; to meet requirements for the display, maintenance and educational use of the combined heritage collections of the royal australian armoured corps and royal regiment of australian artillery.
services include design and related services in respect of the following works: est02014 anglesea barracks mid term refresh, upgrade and refurbishment of existing working accommodation and training facilities;, upgrade of existing services and in-ground infrastructure, including road, electrical, fire, potable water, sewer, gas and stormwater services; and, new working accommodation.
facilities included in the works, which the consultant will be required to construct include: one maintenance hangar for one aircraft; and a secondary p-8a squadron facilities collocated with the maintenance hangar to host up to four 4 deployed 92wg / p-8a sqn crews, based on crew rest cycles, and a permanent staff of seven; an operational zones including a sensitive compartmented information facility. pavement and airfield lighting works are excluded from this package of works
project involves the internal refurbishment and refreshment of building 32 headquarters building including joinery, carpets, paint, blinds and a wall demolition. the works also include the external bird proofing of buildings 32, 54 and 64.
project involves the repairs to communication pit at the defence science and technology group area at edinburgh parks south australia. works require new security lid replacement, new concreted shells and conduit pipes.
project includes the construction of a land based test site development and sustainment at 303-355 st kilda road, st kilda sa to support the introduction into service and sustainment of the hunter class frigate for the royal australian navy. the works include the following: i.the construction of a facility with two levels with approximately 14, 000 m2 in total area, comprising: a.reception, security office and administration open work areas, .auditorium and meeting rooms, receipt or dispatch area, mechanical, electrical and communication workshops; d.rooms with high security classification; e.open space work areas; f.communication and patch rooms; g.collaboration areas, breakout space and amenities; and h.ups, battery room, hv and lv switch rooms and plant areas. ii.the construction of new engineering services infrastructure including: a.site preparation and civil earthworks; b.roadworks including new access and intersection works on coleman road c.pavement treatments for new roads and carpark as well as heavy duty concrete and gravel hardstands; d.piped stormwater drainage network; including water treatment structures and detention basins; e.potable water supply and metering including connection to on-site fire water tanks and pumpset; f.trunk feed into fire tie-in pipes for building internal sprinklers and fire hydrants; g.gravity sewer drainage, on-site submersible sewage pump station, and sewer rising main; h.piped gas supply and metering including connection; fencing, gating and security of traffic access control measures; low voltage electrical cabling complete with associated pits and conduits to external facilities and area lighting .the access road off symes road and earthworks pad and gravel hardstand for a sapn hv substation switchyard, fencing and connection of high voltage electrical works from the facility to the sapn switchyard; fibre optic cabling complete with associated pits and conduits; and sa water off-site infrastructure works, including sa water submersible sewage pump station, rising main and network connection, to be performed by a hydraulics subcontractor that is accredited by sa water. the potential design by the contractor of limited aspects of the works such as post-tensioned concrete slabs, and selection of transformers, ups devices, pumps and valves.
services include design and construction of the following works at hmas stirling: civil, concrete and security works to support the communications site. services to the site including lighting, power, water and communications. the services include design and construction of the following works at hmas harman: civil, concrete and security works to support the communications site. services to the site including lighting, power and communications. minor office refurbishments.
design services consultant dsc to provide services on the basis described in the attached brief. the dsc will be required to support the delivery of project n2269 nulka the project. the project includes the design and construction of maintenance and assembly facilities supporting sea1397 phase 5d and will provide the facilities required to support the production and maintenance of current and enhanced nulka decoys. the project supports the acquisition of an enhanced nulka decoy variant, for which additional production and maintenance capacity is required. the dsc is expected to design a group of facilities for the production and maintenance of the nulka decoy system at defence establishment orchard hills deoh to replace the current aging facility at defence’s mulwala establishment.