Latest and live tenders published in all country. Click on any tender to view further details.
design and construct 1 house at hmas watson, watson bay nsw that meets the requirements to tender
afp, invites interested parties respondents to submit expressions of interest eois which will be used by the afp to shortlist for a request for tender rft to establish a services agreement for the sourcing of publically available and open source information
expressions of interest eoi, we are seeking submissions from potential facilitator to join the australia council leadership program facilitation multi-use list mul to be prequalified for a range of leadership facilitation services
supply of scope includes demolition of existing timber walers on the east wharf of the small ships moresby harbour and replace them with new steel walers, painting of steel piles at and above the waler beams, installation of hdpe fender rubbing strips, replacement of aging sway chains, connection of walers to existing rubber cone fenders and grating removal at hmas stirling
project involves external and internal refurbishment works to building 89 on the wirlinga defence base. the works include the demolition of interior building lining, fit out, plant and equipment and making good the building fabric, lighting, minor building and electrical work
project involves installation of a new generator for mess hall and upgrade to detention centre security system which include lighting, lighting control system, security camera, cell door release and other security system at simpson barracks
refurbishment and installation of tank monitoring system, including tank transfer controls and overfill protections. the construction of diesel jerry can fill station. the replacement of the current fuel transfer/loading pumps to resolve pressure and flow issues, to provide tanker filling loading arms and to repurpose unleaded petrol ulp tanks and bowsers for diesel
project involves car park and parade ground resurfacing to kapooka which is broken down into redefine the borders and reseal the 1st recruit training battalion rtb drill practice parade grounds, define and resurface range visitor carpark, all-weather sealed carpark at head quarters army recruit training centre hq artc and sealing the old enhanced land force elf compound car park
provide a new dedicated running track and workout stations adjacent to the existing sporting ground. the project also includes the installation of signpost for existing running trails throughout the island
project involves remediation of items identified in the latest fire safety survey as well other minor remediation works and kitchenette upgrade