Latest and live tenders published in united arab emirates. Click on any tender to view further details.

1481 Asian Countries Tenders
GTN :14131799
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of pump; lending sea water pump, capacity 80 cu. meter 1/hr. and 30 meter of discharge head, model: r80-315 sl no: d078 make: rouschi i taly including motor assemly for d station ph.2 lending plant.

1482 Asian Countries Tenders
GTN :14131805
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  11 Sep, 2018

overhauling, pressure testing and commissioning of eu type horizontal heat exchangers 52a & 52 in k station dewa, japs 1.#remove all the insulation and cladding sheet from vessel surface gas side ody, water side ody and convex ottoms up to the nozzle flanges. 2.#unolt the gas side and water side flanges, gas inlet and gas outlet flanges without damaging any of the neary equipment / pipeli ne. 3.#remove the gas side ody from the original position y unolting the supports. 4.#clean and remove any particle sedimentation in side the gas side ody, clean the gasket surface area. 5.#dewa engineer will inspect the gas side ody and gasket surface for any defe cts. 6.#any defects found in the gas side ody / gasket surface shall e rectified y the contractor. 7.#remove the gasket andclean th e water side ody surface. 8.#clean the tue internals y hydra jetting at specified water pressure. 9.#after hydra jetting, put the ne w gasket and test ring. 10.#lind the water side ody with lind flanges and provide pressure gauge. 11.#pressurize and hold the vessel at specified pressure and inspect the tue sheet. 12.#any leak / damage found shall e rectified y the contractor as instructed y dew a engineer. 13.#drain the waterside ody, install new gaskets contractor scope and ox up the unit with all connections. 14.#clean t he pressure vessel surface and paint the entire surface including supports. 15.#after the completion of painting, new insulation and cladding sheet shall e provided y the contractor. 16.#sumit the overhaul andhydro test report along with photos. work period 4 d ays for two units contractor scope ·#tools, tackles and equipment to carry out the jo. ·#welding consumales. ·#water side and gas side tue sheet gaskets including for hydro test. ·#test ring for hydro testing ·#lind flanges, pressure gauge and gaskets to carry o ut hydro test. dewa scope ·#scaffolding ·#power ·#water ·#paint ·#insulation and cladding sheet additional requirements from contrac tor 1.#all the lifting activities shall e manual. crane / forklifts are not allowed to enter the premises. 2.#all the lifting and ri gging tools shall e inspected and certified y third party. 3.#all the lifting / rigging tools along with third party inspection cert ificates shall e produced to dewa one-dayadvance in order to verify the items. 4.#dewa will not e responsile for any loss, in case of any incident / damage due to failure of rigging / lifting tools. any such condition / damage shall e repaired / rectified y the c ontractor in their own cost. warranty ·#the warranty period for the work shall e one year from the date of completion of work cert ified y dewa. ·#in case of any damage/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect within short period without affecting the production of electricity and water. general terms & conditions ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilitiescomplexities, safety measures etc., efore he sumits his id. ·#contactor shall sumit method of statement and schedule upon receipt of po. ·#the contractor shall ensure housekeeping on a daily asis and the contractor shall e res ponsile for all waste material disposals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while wo rking in a hazardous area. ·#scaffolding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rig ging and transporting equipment should e arranged y the contractor. this equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should e provided. ·#the work shal l e executed under dewa supervision and as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site thro ughout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, w hose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applie d with copies of vehicle registration. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department cl earances to carry out the scope of work under this contract. ·#the contractor upon receiving the work permit shall firstensure a sa fe working condition. ·#all the persons should wear all the required ppe while at work. ·#all material and tools rought in shall e d eclared at power station security gate and the list of these items shall e signed y dewa security. the copies of these documents sha ll e lodged with dewa engineer in-charge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water for work at dewa site. it is the responsiility of the contractor to have his own arrangement in extending the electricity and water utility to his places of work including lighting, overhauling, pressure testing and commissioning of eu type horizontal heat exchangers 53a & 53 in k station dewa, japs1.#remove all the insulation and cladding sheet from vessel surface gas side ody, water side ody and convex ottoms up to the nozzle flanges. 2.#unolt the gas side and water side flanges, gas inlet and gas outlet flanges without damaging any of the neary equipment / pipeli ne. 3.#remove the gas side ody from the original position y unolting the supports. 4.#clean and remove any particle sedimentation in side the gas side ody, clean the gasket surface area. 5.#dewa engineer will inspect the gas side ody and gasket surface for any defe cts. 6.#any defects found in the gas side ody / gasket surface shall e rectified y the contractor. 7.#remove the gasket and clean th e water side ody surface. 8.#clean the tue internals y hydra jetting at specifiedwater pressure. 9.#after hydra jetting, put the ne w gasket and test ring. 10.#lind the water side ody with lind flanges and provide pressure gauge. 11.#pressurize and hold the vessel at specified pressure and inspect the tue sheet. 12.#any leak / damage found shall e rectified y the contractor as instructed y dew a engineer. 13.#drain the waterside ody, install new gaskets contractor scope and ox up the unit with all connections. 14.#clean t he pressure vessel surface and paint the entire surface including supports. 15.#after the completion of painting, new insulation and cladding sheet shall e provided y the contractor. 16.#sumit the overhaul and hydro test report along with photos. work period 4 d ays for two units contractor scope#tools, tackles and equipment to carry out the jo. ·#welding consumales. ·#water side and gas s ide tue sheet gaskets including for hydro test. ·#test ring for hydro testing ·#lind flanges, pressure gauge and gaskets to carry ou t hydro test. dewa scope ·#scaffolding ·#power ·#water ·#paint ·#insulation and cladding sheet additional requirements from contract or 1.#all the lifting activities shall e manual. crane / forklifts are not allowed to enter the premises. 2.#all the lifting and rig ging tools shall e inspected and certified y third party. 3.#all the lifting / rigging tools along with third party inspection certi ficates shall e produced to dewa one-day advance in order to verify the items. 4.#dewa will not e responsile for any loss, in case of any incident / damage due to failure of rigging / lifting tools. any such condition / damage shall e repaired / rectified y the co ntractor in their own cost. warranty ·#the warranty period for the work shall e one year from the date of completion of work certi fied y dewa. ·#in case of any damage/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect within short period without affecting the production of electricity and water. general terms & conditions ·#the contractor shall visit the site and make himself fully familiar with the w ork scope, plant access, facilities, complexities, safety measures etc., efore he sumits his id. ·#contactor shall sumit method of statement and schedule upon receipt of po. ·#the contractor shall ensure housekeeping on a daily asis and the contractor shall e resp onsile for all waste material disposals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e f ollowed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while wor king in a hazardous area. ·#scaffolding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigg ing and transporting equipment should e arranged y the contractor. this equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should e provided. ·#thework shall e executed under dewa supervision and as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site throu ghout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, wh ose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registration. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department cle arances to carry out the scope of work under this contract. ·#the contractor upon receiving the work permit shall first ensure a saf e working condition. ·#all the persons should wear all the required ppe while atwork. ·#all material and tools rought in shall e de clared at power station security gate and the list of these items shall e signed y dewa security. the copies of these documents shal l e lodged with dewa engineer in-charge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water for work at dewa site. it is the responsiility of the contractor to h ave his own arrangement in extending the electricity and water utility to his places of work including lighting.

1483 Asian Countries Tenders
GTN :14131809
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of industrial fier optic switch, model:sfc800m-scm2, fier connector : sc connector, fier distance:2km, fier wave length:1310nm, power in put : dc12~48v, make: soltech, dcs hmi and accessories, duplex multimode fier adapter converter, type: sc female to lc male fier adapter, make: tripp-lite, model: n458-001- 62, caling: utilize existing sc caling with new lc type switches; duplex multimode 62.5/125 fier adapter lc-sc m/f 0.3m 1-ft., specification: cale type: multimode; connector-a: lc duplex male; connector-: sc duplex female, used for anet switches at lan4 cainet

1484 Asian Countries Tenders
GTN :14131822
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of diff.press.transmitter, 3051cd1a02a1asjm5q4a9258q8, cal range: -62 to 62mar, rosemount make

1485 Asian Countries Tenders
GTN :14131831
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of pressure switch for hydraulic oil model:vd5d.01/-l24 - s0135 - s0138, year uilt: 29/07, supply :10-30 vdc, make:hydac

1486 Asian Countries Tenders
GTN :14131837
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

pecification supply and installation of the clothe will e on the existing calling chain length fence. installation shade cloth shou ld e suitale type of clip with suitale distance etween the clips from oth sides ie top, middle, ottom, etc# more over the clip dista nce should e not more than 1m of dunet fr 200 knitted shade cloth at aweer, haa, nazwa, wahoosh and shaias. dunet fr200 knitted sh ade cloth provides an ultimate protection against u.v rays maximum 90% shade factor with flame retardant properties. suitale for cov ering scaffolding, marine, offshore & construction & sports projects. roll size: 1m x 150m detailed spec attached.for more informat ion or visit the site please contact mr.kamaludheen ummaithanakam 0506716763

1487 Asian Countries Tenders
GTN :14120255
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  11 Sep, 2018

removal of existing furniture/work stn and keep in store, demolition/removal of wall, partitions, data cale and electric cale etc.. as directed y dewa engineer. if any, supply and installation of high quality customized workstation 1200mm x 600mm size faric &doule glass partition 120cm height and s creen to provide privacy. the desk should have pedestal with pencil drawer, two drawers. as per the drawing and dewas approval., mep# provide all mep works as per specification, drawing dewa engineer approval# electrical# provide new 13a twin power sockets for the proposed layout including trunking and wiring with necessary modifications in the existing d.#, supply and fix high quality pvc flooring heavy duty, antistatic from merley tarkett or approved equivalent.supply high quality mid ack faric chair with wheel for the staff working in aove workstations as per drawing and dewa engineer appro val., provide for any other item not included aove, ut are necessary to e executed for proper and efficient functioning of mep systems co ntractor to list out all items, furnish complete specification details for items and quote lump sum amount for each item elow.# if any items not listed/specified/detailed here ut are necessary to e executed, shall e deemed to have een included in the lump sum off, supply & fix wooden skirting 100mm high matching with floor finish., supply and provide 2 seater modern sofa as per dewa engineer approvalsupply and fix decorative wall paper on walls as per specification and dewa engineer approval, supply and provide modern style coffee tale as per dewa engineer approval, supply and install dry pantry with overhead cainet as per dewa engineer approval., supply and install uilt-in wooden cainet 0.3 linear meter, any other items of work not included in the aove items, ut requirement of which is included in specifications and site requirements, tenderer shall clearly descrie the item and quote with unit price. 2 actual quantity may vary as per site conditions. therefor co ntractor has to visit the site efore sumitting quotations.# 3 payment shall e ased on the actual work done at site & as per agreedcontract conditions#

1488 Asian Countries Tenders
GTN :14120285
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

supply and install the single clear frameless glass door 10mm thick including the door height is as per existing opening. film desig n to e provided as per dewas approval including all other accessories as per drawing and specification to the dewa engineer satisfa ction., supply high quality wooden ench with cushion & faric and under cupoard as per dewa engineer approval., if any items not listed/specified/detailed here ut are necessary to e executed, shall e deemed to have een included in the lump sum offer,

1489 Asian Countries Tenders
GTN :14120401
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of tow strap; 10 meters is vehicle recovery tow straps are used to rescue stuck or disale cars, trucks, tractors and heavy equipment. i t is 100% high tensile strength polyester lashing weing, low elongation. it is stretch and recoil action of the recovery strap make s vehicle recovery easier than with chain or cale, short flat head shovel is a tool for digging, lifting, and moving ulk materials, such as soil. it made of steel reinforced as handle and comfort cushion grip, tire deflator is heavy duty mechanical tire gauge gives you a precise, accurate pressure reading every time you use it. the tire def lators easily lock-in your desired psi setting so you can accurately deflate your tires again and again without having to reset the, psi each time. it should e solid metal construction with an extended 360 degree swivel chuck tip and are rust and corrosion resistan t. just like all our tools. tire deflators easily screw onto your tire valve stem and accurately deflate your tires down to your pre set psi pressure. just attach the deflator and walk away. in addition no atteries required - these top-rated, professional tire tool s are easy to use and reliale in all weather conditions. storage case and included compact deflator pouch make these tire monitoring system tools the perfect accessory for your car, motorcycle, truck., recovery track sand ladder which is simple to use traction mats for all types of emergencies. recovery tracks for sand, mud, snow, g rass and many other situations for 4wd, and atv with their durale construction and studded mat design.

1490 Asian Countries Tenders
GTN :14120453
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of sliding profile assemly. 1-meter-long, with toggle pin along with wall stand, as per sample. made of marine grade ss 316l. site surv ey mandatory efore giving the offers. for further details, please contact eng. ader al emadi 04-8161640 / e-mail: ader.emadi@dewa.go v.ae

Get United Arab Emirates Tender Alert...

576437