Latest and live tenders published in south africa. Click on any tender to view further details.
procurement of an urgent relocation of the department of health from civitas building to alternative accommodation comprising of 28 397.09 square meters and 474 parking bays for period of 5 years
hire of office accommodation : a lettable area sufficient to accommodate 1834 m2 assignable plus to a maximum of 25% of non-assignable office space, plus 30 undercover bays with 2 bays must be for the disabled, 20 public parking bays and 20 open bays are required
hire of office accommodation : a lettable area sufficient to accommodate 242 m2 of assignable space plus to a maximum of 25% of non-assignable office space, plus 03 secure undercover bays with 04 lock up, 04 open parking bays which 02 bays must be for the disabled
hire of office accommodation : a lettable area sufficient to accommodate 784 m2 assignable plus to a maximum of 25% of non-assignable office space, plus 15 secure undercover bays, which 2 bays must be for disabled parking and 04 lock up and 20 open bays are required
hire of office accommodation : a lettable area sufficient to accommodate 4312 m2 assignable plus to a maximum of 25% of non-assignable office space, plus 140 secure undercover bays, which 2 bays must be for disabled parking and 40 open bays are required.
hire of office accommodation : a lettable area sufficient to accommodate 3042 m2 assignable plus to a maximum of 25% of non-assignable office space, plus 35 undercover bays with 2 bays must be disable, 43 lock-up and 8 open bays are required.
hire of office accommodation : a lettable area sufficient to accommodate 2004 m2 assignable plus to a maximum of 25% of non-assignable office space, plus 94 secure parking bays of which 2 bays must be for the disabled are required.
term contract for servicing, repairs & maintenance of kitchen equipment
term contract for servicing, repairs & maintenance of kitchen equipment
contracting of a service provider for the supply and delivery of production inputs fertilizer and chemicals to 3 outgrowers for cathedral peak outgrowers over an 8 months period