3241 Widening and Improvements, Improvements to Riding Quality, Rebuilding, Providing Centre median, Construction of Protective walls, Widening of culverts and including Up Keeping for a period of 60 Months on Government Roads in Madathukulam (Highways), C&M, Sub Division. Package No.63 Road A :- Improvements to Riding Quality at km 10/6 - 12/2 of Karatholuvu - Komaralingam road (MD - 149) including upkeeping for a period of 60 months Road B :- Widening the curve at km 18/4 - 18/8 of Udumalaipet - Komaralingam road includingwidening of culvert at km 18/8,Providing center median at km 18/450 - 18/750, Construction of protective wall at km 18/6 & 18/8 including extra length of 35m at km 18/8 (MD 510) Road C :- Improvements to riding quality at km 0/0 - 1/8 of Elayamuthur - Myvadi road including upkeeping for a period of 60 months Road D :- Improvements to Riding Quality at km 0/6 - 1/4, 8/0 - 9/0 & 9/6 - 11/775 of Kolumam - Kallapuram road including upkeeping for a period of 60 months Road E :- Rebuilding of Amaravathi sugar mill to Kongalakurichi road at km 5/6 - 6/0 including upkeeping for a period of 60 months Road F :- Widening from Single lane to Intermediate lane and improvements of Udumalpet - Elayamuthur road at km 1/0 - 2/2 including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 3/0 - 4/007 of The road branching at Km 16/4 of N.G.Pudur - Vayalur road (via) Mylapuram road including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at km 3/0 - 5/6 of Amaravathi sugar mill to Kongalakurichi road including upkeeping for a period of 60 months Road I :- Improvements to Riding Quality at km 0/0 -1/660 of The road branching at Km 83/2 of Dindugal - Bangalore road to Myvadi including upkeeping for a period of 60 months Road J :- Improvements to Riding Quality at 0/0 - 1/2 Perisanampatti - Kiluvankattur road including upkeeping for a period of 60 months Road K :- Improvements to Riding Quality at 0/0 - 1/6 Neelambur - Amaravathi sugarmill road including upkeeping for a period of 60 months"
TRN : 716233 |  Tirupur - Tamil Nadu
Contract Value : 6.20 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, rebuilding, providing centre median, construction of protective walls, widening of culverts and including up keeping for a period of 60 months on government roads in madathukulam (highways), c&m, sub division. package no.63 road a :- improvements to riding quality at km 10/6 - 12/2 of karatholuvu - komaralingam road (md - 149) including upkeeping for a period of 60 months road b :- widening the curve at km 18/4 - 18/8 of udumalaipet - komaralingam road includingwidening of culvert at km 18/8,providing center median at km 18/450 - 18/750, construction of protective wall at km 18/6 & 18/8 including extra length of 35m at km 18/8 (md 510) road c :- improvements to riding quality at km 0/0 - 1/8 of elayamuthur - myvadi road including upkeeping for a period of 60 months road d :- improvements to riding quality at km 0/6 - 1/4, 8/0 - 9/0 & 9/6 - 11/775 of kolumam - kallapuram road including upkeeping for a period of 60 months road e :- rebuilding of amaravathi sugar mill to kongalakurichi road at km 5/6 - 6/0 including upkeeping for a period of 60 months road f :- widening from single lane to intermediate lane and improvements of udumalpet - elayamuthur road at km 1/0 - 2/2 including upkeeping for a period of 60 months road g :- improvements to riding quality at km 3/0 - 4/007 of the road branching at km 16/4 of n.g.pudur - vayalur road (via) mylapuram road including upkeeping for a period of 60 months road h :- improvements to riding quality at km 3/0 - 5/6 of amaravathi sugar mill to kongalakurichi road including upkeeping for a period of 60 months road i :- improvements to riding quality at km 0/0 -1/660 of the road branching at km 83/2 of dindugal - bangalore road to myvadi including upkeeping for a period of 60 months road j :- improvements to riding quality at 0/0 - 1/2 perisanampatti - kiluvankattur road including upkeeping for a period of 60 months road k :- improvements to riding quality at 0/0 - 1/6 neelambur - amaravathi sugarmill road including upkeeping for a period of 60 months"
3242 Widening and Improvements, Improvements, Rebuilding, Widening of culverts, Construction of Drain, Construction of load bearing drain and including Up Keeping for a period of 60 Months on Government Roads in Madathukulam (Highways), C&M, Sub Division. Package No.62 Road A :- Widening from three lane to four lane and rebuilding of Udumalpet - Dharapuram road at km 0/0 - 0/373 & 0/414 - 0/500 (SH 97) including upkeeping for a period of 60 months Road B :- Widening from three lane to four lane and rebuilding of Udumalpet - Dharapuram road at km 0/500-1/0 (SH 97) including widening of culvert at km 0/6 including upkeeping for a period of 60 months Road C :- Widening from three lane to four lane and improvements of Udumalpet - Dharapuram road at km 1/2 - 2/0 (SH 97) including upkeeping for a period of 60 months Road D :- Construction of Drain at km 0/0 - 0/248 (LS) & 1/080 - 1/580 (RS) of Udumalpet - Dharapuram road including construction of load bearing drain at km 0/2 (LS) , Km 1/2 (RS) & 1/6 (RS) (SH 97) Road E :- Improvements to km 0/0 - 1/0 of Udumalpet - Elayamuthur road including upkeeping for a period of 60 months"
3243 Improvements to Riding Quality, and including Up Keeping for a period of 60 Months on Government Roads in Dharapuram & Mulanur (Highways), C&M, Sub Division. Package No.66 Road A :- Improvements to Riding quality at km 1/0 -3/4 & 4/4 -4/8 of Dharapuram - Poolavadi road (MD 884) including upkeeping for a period of 60 months Road B :- Improvements to Riding quality at km 1/0 -3/8 of Suriyanallur - Velappampalayam road including upkeeping for a period of 60 months. Road C :- Improvements to Riding quality at km 4/8 - 8/2 of The road from Kallipalayam to join at km 20/8 of Dharapuram - Pollachi, including upkeeping for a period of 60 months Road D :- Improvements to Riding quality at km2/4 - 4/0 & 5/0 - 6/2 of Kundadam - Ponnapuram road including upkeeping for a period of 60 months Road E :- Improvements to Riding Quality at Km 0/0-2/0 of Malamedu - Velampoondi road including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at Km 7/0-11/0 of Akkaraipalayam - Karaiyur road (MD 989) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at Km 0/0-2/6 of Karur - Dharapuram road to Salaripatty road including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at Km 0/0-5/4 of Salakkadai - Eulugamvalasu road including upkeeping for a period of 60 months Road I :- Improvements to Riding Quality at Km 9/0-12/6 of The road branching at Km 53/8 of Udumalpet - Chinnadharapuram road to District limit road (via) Chinnakkampatty, Ponnivady including upkeeping for a period of 60 months
TRN : 716235 |  Tirupur - Tamil Nadu
Contract Value : 5.53 Crore | Agency Name : Highway Department
Tender award for improvements to riding quality, and including up keeping for a period of 60 months on government roads in dharapuram & mulanur (highways), c&m, sub division. package no.66 road a :- improvements to riding quality at km 1/0 -3/4 & 4/4 -4/8 of dharapuram - poolavadi road (md 884) including upkeeping for a period of 60 months road b :- improvements to riding quality at km 1/0 -3/8 of suriyanallur - velappampalayam road including upkeeping for a period of 60 months. road c :- improvements to riding quality at km 4/8 - 8/2 of the road from kallipalayam to join at km 20/8 of dharapuram - pollachi, including upkeeping for a period of 60 months road d :- improvements to riding quality at km2/4 - 4/0 & 5/0 - 6/2 of kundadam - ponnapuram road including upkeeping for a period of 60 months road e :- improvements to riding quality at km 0/0-2/0 of malamedu - velampoondi road including upkeeping for a period of 60 months road f :- improvements to riding quality at km 7/0-11/0 of akkaraipalayam - karaiyur road (md 989) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 0/0-2/6 of karur - dharapuram road to salaripatty road including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0-5/4 of salakkadai - eulugamvalasu road including upkeeping for a period of 60 months road i :- improvements to riding quality at km 9/0-12/6 of the road branching at km 53/8 of udumalpet - chinnadharapuram road to district limit road (via) chinnakkampatty, ponnivady including upkeeping for a period of 60 months
3244 Widening and Improvements, Improvements to Riding Quality, Widening the Curve, Construction of Box Culverts, Construction of Retaining Walls, Reconstruction of culverts, Widening of RCC slab culverts, and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.61 Road A :- Widening from Intermediate lane to Two lane and Improvements of km 15/6 of Udumalpet-Chinnar road - Amaravathi nagar road km 15/6 at km 2/4 - 4/0 (MD 167) including up keeping for a period of 60 months. Road B :- Improvements of Riding Quality at km 5/0 - 5/2 and 7/8 - 12/0 of Udumalpet - Chinnar road (MD 509) including up keeping for a period of 60 months. Road C :- Widening the curve at km 10/2 of Udumalpet - Chinnar road and including Construction of Retaining wall at km 10/2 (MD 509) Road D :- Widening from Single lane to Intermediate lane and Improvements of Periyapatti - Negamam road (via) Ammapatti at km 12/0 - 13/6 and including Reconstruction of culvert at km 12/2 &12/6 including up keeping for a period of 60 months. Road E :- Widening from Single lane to Intermediate lane and Improvements of Periyapatti - Negamam road (via) Amanthakadavu at km 8/3 - 9/0 including up keeping for a period of 60 months. Road F :- Improvements to Riding Quality at km 0/0 - 3/0 of The road branching at km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam including up keeping for a period of 60 months. Road G :- Construction of box culvert at km 0/8 & 2/2 of Negamam-Erisanampatti road branching at Km 26/8 of Anaimalai - Poolankinar road (Via) Vilamarathupatti. Road H :- Widening RCC Slab Culvert across PAP canal at km 0/10 of The road branching at km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam and Construction of retaining wall at km 2/6 & 2/8"
TRN : 716236 |  Tirupur - Tamil Nadu
Contract Value : 5.92 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, widening the curve, construction of box culverts, construction of retaining walls, reconstruction of culverts, widening of rcc slab culverts, and including up keeping for a period of 60 months on government roads in udumalpet (highways), c&m, sub division. package no.61 road a :- widening from intermediate lane to two lane and improvements of km 15/6 of udumalpet-chinnar road - amaravathi nagar road km 15/6 at km 2/4 - 4/0 (md 167) including up keeping for a period of 60 months. road b :- improvements of riding quality at km 5/0 - 5/2 and 7/8 - 12/0 of udumalpet - chinnar road (md 509) including up keeping for a period of 60 months. road c :- widening the curve at km 10/2 of udumalpet - chinnar road and including construction of retaining wall at km 10/2 (md 509) road d :- widening from single lane to intermediate lane and improvements of periyapatti - negamam road (via) ammapatti at km 12/0 - 13/6 and including reconstruction of culvert at km 12/2 &12/6 including up keeping for a period of 60 months. road e :- widening from single lane to intermediate lane and improvements of periyapatti - negamam road (via) amanthakadavu at km 8/3 - 9/0 including up keeping for a period of 60 months. road f :- improvements to riding quality at km 0/0 - 3/0 of the road branching at km 5/6 of udumalpet-senjerihills road to pottayampalayam including up keeping for a period of 60 months. road g :- construction of box culvert at km 0/8 & 2/2 of negamam-erisanampatti road branching at km 26/8 of anaimalai - poolankinar road (via) vilamarathupatti. road h :- widening rcc slab culvert across pap canal at km 0/10 of the road branching at km 5/6 of udumalpet-senjerihills road to pottayampalayam and construction of retaining wall at km 2/6 & 2/8"
3245 Widening and Improvements, Improvements to Riding Quality, Widening of Box Culverts, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.60 Road A :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 7/0 - 8/2 Construction of retainingwall at km 7/6 ,7/8 & 8/2 (MD 512) including up keeping for a period of 60 months. Road B :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 8/2 - 8/8 Construction of retainingwall at km 8/4 (MD 512) including up keeping for a period of 60 months. Road C :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 14/4 - 15/8 Construction of retainingwall at km 15/8 (MD 512) including up keeping for a period of 60 months. Road D :- Improvements to Riding Quality at km 0/0 - 1/0 and 6/2 - 6/6 of Sungaramudakku - Ammapatti road including up keeping for a period of 60 months. Road E :- Improvements to Riding Quality at km 3/0 - 4/4 of The road branching at Km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam including up keeping for a period of 60 months. Road F :- Improvements to Riding Quality at km 3/4 - 4/8 of Ragalbavi Village road including up keeping for a period of 60 months. Road G :- Improvements to Riding Quality at km 1/0 - 2/0 of Ravanapuram Village road including up keeping for a period of 60 months. Road H :- Improvements to Riding Quality at km 1/0 - 1/8 of The road branching at Km 13/4 of Udumalpet-Senjerihills road to Alamarathur including up keeping for a period of 60 months. Road I :- Improvements to Riding Quality at km 0/0 - 1/0 and 2/0 - 5/6 of km 8/8 of Udumalpet-Senjeri hills road to Kottamangalam road (Using Plastic Waste) including up keeping for a period of 60 months. Road J :- Widening of Box Culvert at km 29/10 of Erisanampatti - Dhali road and Construction of Retaining wall Road K :- Construction of Retaining Wall at Km 5/0-5/5 of Modakkupatti - Thirumoorthi Nagar road (Palar River Bed)"
TRN : 716238 |  Tirupur - Tamil Nadu
Contract Value : 6.01 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, widening of box culverts, construction of retaining walls and including up keeping for a period of 60 months on government roads in udumalpet (highways), c&m, sub division. package no.60 road a :- widening from intermediate lane to two lane and improvements of udumalpet - thirumoorthy salai at km 7/0 - 8/2 construction of retainingwall at km 7/6 ,7/8 & 8/2 (md 512) including up keeping for a period of 60 months. road b :- widening from intermediate lane to two lane and improvements of udumalpet - thirumoorthy salai at km 8/2 - 8/8 construction of retainingwall at km 8/4 (md 512) including up keeping for a period of 60 months. road c :- widening from intermediate lane to two lane and improvements of udumalpet - thirumoorthy salai at km 14/4 - 15/8 construction of retainingwall at km 15/8 (md 512) including up keeping for a period of 60 months. road d :- improvements to riding quality at km 0/0 - 1/0 and 6/2 - 6/6 of sungaramudakku - ammapatti road including up keeping for a period of 60 months. road e :- improvements to riding quality at km 3/0 - 4/4 of the road branching at km 5/6 of udumalpet-senjerihills road to pottayampalayam including up keeping for a period of 60 months. road f :- improvements to riding quality at km 3/4 - 4/8 of ragalbavi village road including up keeping for a period of 60 months. road g :- improvements to riding quality at km 1/0 - 2/0 of ravanapuram village road including up keeping for a period of 60 months. road h :- improvements to riding quality at km 1/0 - 1/8 of the road branching at km 13/4 of udumalpet-senjerihills road to alamarathur including up keeping for a period of 60 months. road i :- improvements to riding quality at km 0/0 - 1/0 and 2/0 - 5/6 of km 8/8 of udumalpet-senjeri hills road to kottamangalam road (using plastic waste) including up keeping for a period of 60 months. road j :- widening of box culvert at km 29/10 of erisanampatti - dhali road and construction of retaining wall road k :- construction of retaining wall at km 5/0-5/5 of modakkupatti - thirumoorthi nagar road (palar river bed)"
3246 Widening and Improvements, Construction of Drains and Widening of culverts on Governement Roads in Tirupur North (Highways), C&M, Sub Division. (Package No - 33) Road A :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 5/8 - 6/100 and 6/550 - 7/0, Improvements at km 6/100 - 6/550 (SH 169) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 7/0 - 8/0 incuding Construction of Box Culvert at Km 7/2 (SH 169) including upkeeping for a period of 60 months Road C :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 8/0 - 8/6, Improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding Construction of Box Culvert at Km 8/2 (SH 169) including upkeeping for a period of 60 months Road D :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 4/2 - 4/700 (SH 169) including upkeeping for a period of 60 months Road E :- Widening from Single lane to Intermediate lane and Improvements of Tirupur - Vijayamangalam road at Km 4/8 of Parapalayam at km 0/0 - 1/0, Improvements at km 1/0 - 2/2 including construction of retaining wall at Km 1/6,1/8 & 1/10 and Construction of RCC Drain at Km 0/2 including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 5/2 - 6/0 of Tiruppur - Vijayamangalam road (SH 19 A) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of Tiruppur - Vijayamangalam road (SH 19 A)including upkeeping for a period of 60 months"
TRN : 704952 |  Tirupur - Tamil Nadu
Contract Value : 6.98 Crore | Agency Name : Highway Department
Tender award for widening and improvements, construction of drains and widening of culverts on governement roads in tirupur north (highways), c&m, sub division. (package no - 33) road a :- widening from two lane to three lane and improvements of tirupur - somanur road at km 5/8 - 6/100 and 6/550 - 7/0, improvements at km 6/100 - 6/550 (sh 169) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of tirupur - somanur road at km 7/0 - 8/0 incuding construction of box culvert at km 7/2 (sh 169) including upkeeping for a period of 60 months road c :- widening from two lane to three lane and improvements of tirupur - somanur road at km 8/0 - 8/6, improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding construction of box culvert at km 8/2 (sh 169) including upkeeping for a period of 60 months road d :- widening from two lane to three lane and improvements of tirupur - somanur road at km 4/2 - 4/700 (sh 169) including upkeeping for a period of 60 months road e :- widening from single lane to intermediate lane and improvements of tirupur - vijayamangalam road at km 4/8 of parapalayam at km 0/0 - 1/0, improvements at km 1/0 - 2/2 including construction of retaining wall at km 1/6,1/8 & 1/10 and construction of rcc drain at km 0/2 including upkeeping for a period of 60 months road f :- improvements to riding quality at km 5/2 - 6/0 of tiruppur - vijayamangalam road (sh 19 a) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of tiruppur - vijayamangalam road (sh 19 a)including upkeeping for a period of 60 months"
3247 TTPS – Mech.II – BM – Unit III - Fabrication and erection of structural platform suitable for the maintenance of Ash Level Indication Switches pertaining to instrumentation division inbetween I st & II nd row of Unit III ESP Hoppers
3248 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works, and providing RCC centre median and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-28) The Following works are involved in this package 1.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 31/850 - 32/4 including CD works and Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0365 2.Widening from Two lane to Four lane at 32/4-32/8 and Improvements from km 32/6 - 32/8 of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0373 3.Improvements to Riding Quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4529 4.Improvements to Riding Quality at Km 7/2-9/0, 10/6-12/2 Thiruchengode - Sankari Road (via) Kolikkalnatham Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4542 5.Improvements to Riding Quality at km 0/0 - 3/0 of Anchettipatti - Unjanoor Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4543 6. Improvements to Riding Quality at km 0/0-4/8 of Thottipalayam - Manjupalayam Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4552"
TRN : 719189 |  Salem - Tamil Nadu
Contract Value : 6.37 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works, and providing rcc centre median and up keeping for a period of 60 months in sankari (h) c&m sub division (package-28) the following works are involved in this package 1.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 31/850 - 32/4 including cd works and providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0365 2.widening from two lane to four lane at 32/4-32/8 and improvements from km 32/6 - 32/8 of salem - cochin - kanyakumari road (abandoned nh 47) sankari including providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0373 3.improvements to riding quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of magudanchavadi - komarapalayam road (via) edappady (sh 221) including upkeeping for a period of 60 months 01-cridp-19-20-i-4529 4.improvements to riding quality at km 7/2-9/0, 10/6-12/2 thiruchengode - sankari road (via) kolikkalnatham road including upkeeping for a period of 60 months 01-cridp-19-20-i-4542 5.improvements to riding quality at km 0/0 - 3/0 of anchettipatti - unjanoor road including upkeeping for a period of 60 months 01-cridp-19-20-i-4543 6. improvements to riding quality at km 0/0-4/8 of thottipalayam - manjupalayam road including upkeeping for a period of 60 months 01-cridp-19-20-i-4552"
3249 Widening and Improvements to Government Roads including Construction of CD Works, Drain, Retaining Wall, Reconstruction of Pipe Culvert and up keeping the roads for a period of 60 months in Attur C&M Sub Division (Package-8) The Following works are involved in this package 1. Widening from Single lane to Intermediate lane and Improvements of Nagiyampatty-Ulipuram Road at km 0/0-2/0 including CD works including upkeeping for a period of 60 months -01-CRIDP-19-20-O-2582 2. Widening from Single lane to Intermediate lane and Improvements of Nagiyampatty-Ulipuram Road at km 2/0-3/805 including CD works including upkeeping for a period of 60 months -01-CRIDP-19-20-O-2583 3. Construction of Retaning wall at Km 0/10, 2/6, 2/10, 3/2, 3/4, 3/8 including constuction of drain and raising the bodywall at Km.0/0 - 0/6 of Nagiyampatty - Ulipuram Pudur Road -01-CRIDP-19-20-O-2595 4. Widening from Single lane to Intermediate lane and Improvements of Thammampatty-Palakkadu Road at km0/0-2/4 including CD works including up keeping for a period of 60months - 01-CRIDP-19-20-O-2584 5. Construction of Retainingwall at km 4/4,4/6,4/8,4/10 of Malliykarai-Thammampatty to Jangamasamudram Upto Mullukurichi Road including reconstruction of pipe culvert at Km.4/4 and 4/10 - 01-CRIDP-19-20-O-2596 "
3250 Special Repairs to the Government Roads in Tirupur North (H), C&M Sub-Division. Package No.75 Road A :- Special repairs to Tirupur Ring road (via) Thirumurugan poondi, Nallur, 15 Velam palayam road at Km 0/0 -0/400 Road B :- Special repairs to Nallur Sennimalaipalayam road at km 2/0 -3/8 Road C :- Special repairs to the road from Km 7/4 of Avinashi Tirupur Palladam Pollachi Cochin (via) Meenkarai road to Avinashi goundam palayam at Km 0/0 - 1/6 Road D :- Special repairs to Senkalipalayam - Kattuvalasu road at km 0/0 -1/6 Road E :- Special repairs to Senkalipalayam - Vamalaigoundenputhur road at km 0/0 -1/6 Road F :- Special repairs to Umachivalasu - Senkalipalayam road at km 0/0 -2/0 Road G :- Special repairs to Umachivalasu - Senkalipalayam road at km 2/0 -3/6"