List of latest e-r-w-pipe Tenders in Indian Tenders. Click on any e-r-w-pipe Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for e-r-w-pipe Tenders.
Tender for construction of cred-selected">emred-selected">ent concrred-selected">etred-selected">e road ovred-selected">erlay work ovred-selected">erred-selected">existing old cc road and undred-selected">erground pipred-selected">e drainagred-selected">e linred-selected">e work at diffred-selected">erred-selected">ent wards in nagar parishad mhowgaon undred-selected">er cm infra 4th phasred-selected">e - 3rd call
Tender for gred-selected">em bids for 9200 plb hdpred-selected">e pipred-selected">e 4033 mm with pp ropred-selected">e within it grred-selected">ered-selected">en plb hdpred-selected">e pipred-selected">e 4033 mm with pp ropred-selected">e within it orangred-selected">e duct accred-selected">essorired-selected">es-plastic couplred-selected">er push-fit couplred-selected">er duct accred-selected">essorired-selected">es-red-selected">end plug
Tender for gred-selected">em bids for intred-selected">egratred-selected">ed ir, hd mred-selected">egapixred-selected">el, ir ip ptz domred-selected">e camred-selected">era , layred-selected">er 2 managred-selected">ed stackablred-selected">e switch , 6 corred-selected">e singlred-selected">e modred-selected">e armourred-selected">ed ofc cablred-selected">e , 3 corred-selected">e armourred-selected">ed powred-selected">er cablred-selected">e , 25 mm casing capping , hdpred-selected">e pipred-selected">e for undred-selected">erground cabling , 25 mm pvc conduit pipred-selected">e , flred-selected">exiblred-selected">e pipred-selected">e , utp cablred-selected">e , polred-selected">es of 10 mtrs hred-selected">eight , thred-selected">ermal camred-selected">era pt and visual hd ptz ip vga , 2x10kva onlinred-selected">e ups for snmp and individual battred-selected">ery bank of smf battred-selected">erired-selected">es , corred-selected">e i7 11th gred-selected">en procred-selected">essor basred-selected">ed dred-selected">esktop with 8 gb ddrram, 1tb hdd, 2 gb graphic card, dvd rw, kred-selected">eyboard and mousred-selected">e , sred-selected">ervred-selected">er , 24 port layred-selected">er 2 or 3 managred-selected">ed stackablred-selected">e switch , 6 corred-selected">e liu fully loadred-selected">ed with pigtails and couplred-selected">ers , supply of 9u outdoor junction box , joystick kred-selected">eyboard , singlred-selected">e modred-selected">e fibred-selected">er patch cords , vidred-selected">eo managred-selected">emred-selected">ent softwarred-selected">e with 24 licred-selected">ensred-selected">e , 55 inchred-selected">es full hd lred-selected">ed display , full hred-selected">eight turnstilred-selected">es , proximity rred-selected">eadred-selected">er , qr codred-selected">e or barcodred-selected">e rred-selected">eadred-selected">er and rred-selected">elatred-selected">ed cabling works , color lasred-selected">erjred-selected">et nred-selected">etwork printred-selected">er , accred-selected">ess control softwarred-selected">e , accred-selected">ess control panred-selected">els , powred-selected">er accred-selected">essorired-selected">es , micro controllred-selected">er basred-selected">ed multi door framred-selected">e mred-selected">etal dred-selected">etred-selected">ectorwit ir sred-selected">ensors , pnred-selected">eumatic orred-selected">elred-selected">ectric sirred-selected">ens for crred-selected">eating urgred-selected">ent sound prred-selected">essurred-selected">e , battred-selected">ery opred-selected">eratred-selected">ed high sred-selected">ensitivity hand hred-selected">eld mred-selected">etal dred-selected">etred-selected">ectors to dred-selected">etred-selected">ect both fred-selected">errous and non fred-selected">errous mred-selected">etals , installation tred-selected">esting and commissioning chargred-selected">es
Tender for tred-selected">endred-selected">er for karred-selected">eli - nurulla road to askari markred-selected">et road block c and block d housing schred-selected">emred-selected">e and nurulla road from mahavir chauraha to karamat ki chowki nred-selected">ear sasur khred-selected">edari rivred-selected">er and also till thred-selected">e connred-selected">ecting road - clred-selected">earing grass and rred-selected">emoval of rubbish upto a distancred-selected">e of 30 m outsidred-selected">e thred-selected">e pred-selected">eriphred-selected">ery of thred-selected">e arred-selected">ea as pred-selected">er tred-selected">echnical spred-selected">ecification clausred-selected">e 201. 3 dismantling of red-selected">existing structurred-selected">es likred-selected">e culvred-selected">erts, bridgred-selected">es, rred-selected">etaining walls and othred-selected">er structurred-selected">e comprising of masonry, cred-selected">emred-selected">ent concrred-selected">etred-selected">e, wood work, stred-selected">ered-selected">el work, including t&p and scaffolding whred-selected">erred-selected">evred-selected">er nred-selected">ecred-selected">essary, sorting thred-selected">e dismantlred-selected">ed matred-selected">erial, disposal of unsred-selected">ervicred-selected">eablred-selected">e matred-selected">erial and stacking thred-selected">e sred-selected">ervicred-selected">eablred-selected">e matred-selected">erial with all lifts and lred-selected">ead of 60 mred-selected">etrred-selected">es as pred-selected">er instructions of red-selected">e-i-c. (by mred-selected">echanical mred-selected">eans). 4 i) cred-selected">emred-selected">ent concrred-selected">etred-selected">e 5 ii) rred-selected">einforcred-selected">ed cred-selected">emred-selected">ent concrred-selected">etred-selected">e/ r.b. 6 dismantling of flred-selected">exiblred-selected">e pavred-selected">emred-selected">ents and disposal of dismantlred-selected">ed matred-selected">erial up to a lred-selected">ead of 100 m, stacking sred-selected">ervicred-selected">eablred-selected">e and unsred-selected">ervicred-selected">eablred-selected">e matred-selected">erials sred-selected">eparatred-selected">ely as pred-selected">er tred-selected">echnical spred-selected">ecification clausred-selected">e 202. bituminous / granular coursred-selected">es (by mred-selected">echanical mred-selected">eans) 7 dismantling of road gully chambred-selected">er of various sizred-selected">es including c.i. grating with framred-selected">e including stacking of usred-selected">eful matred-selected">erials nred-selected">ear thred-selected">e sitred-selected">e and disposal of unsred-selected">ervicred-selected">eablred-selected">e matred-selected">erials within 50 mred-selected">etrred-selected">es lred-selected">ead including rred-selected">efilling thred-selected">e red-selected">excavatred-selected">ed gap. 8 rred-selected">emoving all typred-selected">e of humred-selected">e pipred-selected">es and stacking within a lred-selected">ead of 1000 mred-selected">etrred-selected">es including t&p, red-selected">earthwork and dismantling of masonry works. 9 (i) up to 600 mm dia 10 rred-selected">emoval of tred-selected">elred-selected">ephonred-selected">e / red-selected">elred-selected">ectric polred-selected">es / strred-selected">ered-selected">et light / lamp post including red-selected">excavation and dismantling of foundation concrred-selected">etred-selected">e and linred-selected">es undred-selected">er thred-selected">e supred-selected">ervision of concred-selected">ernred-selected">ed dred-selected">epartmred-selected">ent, disposal with all lifts and up to a lred-selected">ead of 1000 mred-selected">etrred-selected">es and stacking thred-selected">e sred-selected">ervicred-selected">eablred-selected">e and unsred-selected">ervicred-selected">eablred-selected">e matred-selected">erial sred-selected">eparatred-selected">ely 11 disposal of moorum/building rubbish malba/ similar unsred-selected">ervicred-selected">eablred-selected">e, dismantlred-selected">ed orwastred-selected">e matred-selected">erial by mred-selected">echanical transport including loading, transporting, unloading to approvred-selected">ed municipal dumping ground for lred-selected">ead upto 10 km for all lifts, complred-selected">etred-selected">e as pred-selected">er dirred-selected">ections of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. notred-selected">e- itred-selected">em to bred-selected">e applicablred-selected">e in urban arred-selected">eas having dirred-selected">ections forrred-selected">estrictred-selected">ed hours for movred-selected">emred-selected">ent/ plying of load carrying motor vred-selected">ehiclred-selected">e of 3.5 cum or morred-selected">e. 12 dred-selected">ewatred-selected">ering using 10hp to 70hp dired-selected">esred-selected">el red-selected">enginred-selected">e pump sred-selected">et including hirred-selected">e chargred-selected">es, cost of dired-selected">esred-selected">el, red-selected">enginred-selected">e oil, pump opred-selected">erator, labor chargred-selected">es, convred-selected">eyancred-selected">e of pump sred-selected">et and fured-selected">el to sitred-selected">e and back, loading, unloading and any othred-selected">er incidred-selected">ental chargred-selected">es red-selected">etc., complred-selected">etred-selected">e. (hirred-selected">e chargred-selected">es for dired-selected">esred-selected">el pump sred-selected">et for 10 hp) 13 [b] bill no. 2 - red-selected">earthworks 14 red-selected">excavation forroad work in soil with hydraulic red-selected">excavator of 0.9 cum buckred-selected">et capacity including cutting and lred-selected">eading in tippred-selected">ers, trimming bottom and sidred-selected">e slopred-selected">es, in accordancred-selected">e with rred-selected">equirred-selected">emred-selected">ents of linred-selected">es, gradred-selected">es and cross sred-selected">ections and transporting to thred-selected">e red-selected">embankmred-selected">ent location within all lifts and lred-selected">ead upto 1000m 15 rred-selected">emoval of unsred-selected">ervicred-selected">eablred-selected">e soil including red-selected">excavation loading and disposal but red-selected">excluding rred-selected">eplacred-selected">emred-selected">ent by suitablred-selected">e soil which shall bred-selected">e paid sred-selected">eparatred-selected">ely as pred-selected">er clausred-selected">e 305 16 i) lred-selected">ead upto 1000 m 17 ii) lred-selected">ead upto 8000 m 18 red-selected">earth work in red-selected">excavation of foundation of structurred-selected">es as pred-selected">er drawing and tred-selected">echnical spred-selected">ecification, including sred-selected">etting out construction of shoring and bracing, rred-selected">emoval of stumps and othred-selected">er dred-selected">elred-selected">etred-selected">erious mattred-selected">er drred-selected">essing of sidred-selected">es and bottom, backfilling thred-selected">e red-selected">excavation red-selected">earth to thred-selected">e red-selected">extred-selected">ent rred-selected">equirred-selected">ed and utilizing thred-selected">e rred-selected">emaining red-selected">earth locally forroad work. 19 mred-selected">echanical mred-selected">eans (dred-selected">epth upto 1.5 m) 20 i) red-selected">excavation 21 filling availablred-selected">e red-selected">excavatred-selected">ed red-selected">earth (red-selected">excluding rock) in trred-selected">enchred-selected">es, plinth, sidred-selected">es of foundations red-selected">etc. in layred-selected">ers not red-selected">excred-selected">ered-selected">eding 20 cm in dred-selected">epth, consolidating red-selected">each dred-selected">epositred-selected">ed layred-selected">er by ramming and watred-selected">ering, lred-selected">ead up to 50 and for all lift. 22 [c] bill no. 3 - dred-selected">evred-selected">elopmred-selected">ent of carriagred-selected">eway 23 stabilization of in-situ (red-selected">existing pavred-selected">emred-selected">ent crust) or soil or othred-selected">erwisred-selected">e sub basred-selected">e/ basred-selected">e coursred-selected">e up to thred-selected">e rred-selected">equirred-selected">ed dred-selected">epth by cold in-situ rred-selected">ecycling using cred-selected">emred-selected">ent and chred-selected">emical additivred-selected">es / othred-selected">erwisred-selected">e: providing pulvred-selected">erizing, sprred-selected">eading, milling and mixing of chred-selected">emical additivred-selected">es at thred-selected">e appropriatred-selected">e ratred-selected">e as pred-selected">er job mix dred-selected">esign in accordancred-selected">e with irc-sp-72-2015 , irc-37-2012 & 2018 and irc sp 89 (part ii) 2018. cred-selected">emred-selected">entitious additivred-selected">e @ ratred-selected">e of minimum 5 - 7% and ccs/cs additivred-selected">e should bred-selected">e sprred-selected">ead on thred-selected">e red-selected">existing pavred-selected">emred-selected">ent using a mobilred-selected">e truck mountred-selected">ed containred-selected">erizred-selected">ed cred-selected">emred-selected">ent/ additivred-selected">e sprred-selected">eadred-selected">erwith micro procred-selected">essor controllred-selected">ed wred-selected">eighing and sprred-selected">eading systred-selected">em. thred-selected">e additivred-selected">e sprred-selected">eadred-selected">er shall havred-selected">e variablred-selected">e working width sufficired-selected">ent to covred-selected">erwholred-selected">e pavred-selected">emred-selected">ent lanred-selected">e. thred-selected">e in-situ stabilization procred-selected">ess shall bred-selected">e carrired-selected">ed out by a mobilred-selected">e and sred-selected">elf propred-selected">ellred-selected">ed stabilizred-selected">er / rred-selected">eclaimred-selected">er of working width of 2.4 m and with minimum red-selected">enginred-selected">e horsred-selected">e powred-selected">er of 440 kwwith a variablred-selected">e working dred-selected">epth up to 50 cm. thred-selected">e rred-selected">esultant stabilizred-selected">ed mix thred-selected">en would bred-selected">e profilred-selected">ed to thred-selected">e rred-selected">equirred-selected">ed gradred-selected">e, lred-selected">evred-selected">el and thicknred-selected">ess using motor gradred-selected">er and thred-selected">e mix would bred-selected">e compactred-selected">ed using 20 tonnred-selected">e pad foot rollred-selected">er in combination with smooth whred-selected">ered-selected">el rollred-selected">er to achired-selected">evred-selected">e dred-selected">esirred-selected">ed proctor dred-selected">ensity as pred-selected">er irc 37-2012 & 2018 and complred-selected">etred-selected">e in all rred-selected">espred-selected">ect and curing with watred-selected">er as rred-selected">equirred-selected">ed including all matred-selected">erials, labour and machinred-selected">ery red-selected">etc. thred-selected">e red-selected">entirred-selected">e in-situ procred-selected">ess would bred-selected">e carrired-selected">ed out in singlred-selected">e pass with milling and pulvred-selected">erising of damagred-selected">ed asphalt pavred-selected">emred-selected">ent / soil/ aggrred-selected">egatred-selected">es / soil-aggrred-selected">egatred-selected">e mixturred-selected">e to thred-selected">e dred-selected">esirred-selected">ed dred-selected">epth and with simultanred-selected">eous addition of additivred-selected">es and watred-selected">erwith machinred-selected">e intred-selected">egratred-selected">ed spray bars fitred-selected">ed on thred-selected">e whred-selected">ered-selected">elred-selected">ed sred-selected">elf-propred-selected">ellred-selected">ed and vibratory pad foot rollred-selected">er to achired-selected">evred-selected">e thred-selected">e dred-selected">esirred-selected">ed proctor dred-selected">ensity in all rred-selected">espred-selected">ects. thred-selected">e tandred-selected">em rollred-selected">er bred-selected">e followred-selected">ed by pnred-selected">eumatic tyrred-selected">e rollred-selected">er. thred-selected">e minimum unconfinred-selected">ed comprred-selected">essivred-selected">e strred-selected">ength (ucs) of stabilizred-selected">ed sub basred-selected">e/ basred-selected">e should bred-selected">e 4.5 to 7 mpa aftred-selected">er 7 / 28 days of curing as pred-selected">er irc-sp- 72-2015 , irc-37-2012 & 2018 . also durability aspred-selected">ects (wred-selected">et-dry cyclred-selected">es) of stabilizred-selected">ed sub basred-selected">e should bred-selected">e satisfired-selected">ed as pred-selected">er irc 37-2012 & 2018 and irc sp 89 (part ii) 2018. thred-selected">e gradation mixred-selected">es and matred-selected">erials should bred-selected">e as pred-selected">er irc 37-2012 & 2018 and irc sp 89 (part ii) 2018. thred-selected">e train of red-selected">equipmred-selected">ents to bred-selected">e usred-selected">ed arred-selected">e bindred-selected">er sprred-selected">eadred-selected">er- watred-selected">er tankred-selected">er- additivred-selected">e truck- rred-selected">ecyclred-selected">er- padfoot rollred-selected">er (20 tonnred-selected">e) + singlred-selected">e drum compactor- gradred-selected">er- tandom rollred-selected">er- pnred-selected">eumatic tyrred-selected">erollred-selected">er (20 tonnred-selected">e) 24 sami layred-selected">erproviding and laying strred-selected">ess absorbing mred-selected">embranred-selected">e intred-selected">erlayred-selected">er (sami)/bitumred-selected">en imprred-selected">egnatred-selected">ed gred-selected">eotred-selected">extilred-selected">e layred-selected">er aftred-selected">er clred-selected">earing of thred-selected">e road surfacred-selected">e gred-selected">eotred-selected">extilred-selected">e conforming to physical rred-selected">equirred-selected">emred-selected">ents of claured-selected">es 703-3, laid ovred-selected">er a tack coat of paving gradred-selected">e bitumred-selected">en 80- 100 pred-selected">enred-selected">etration, laid at thred-selected">e ratred-selected">e of 1.05 kg pred-selected">er sqm ovred-selected">er thoroughly clred-selected">eanred-selected">ed and rred-selected">epairred-selected">ed surfacred-selected">e to providred-selected">e a watred-selected">errred-selected">esistancred-selected">e mred-selected">embranred-selected">e and crack rred-selected">etarding layred-selected">er paving fabric to bred-selected">e frred-selected">ered-selected">e of wrinkling and folding and to bred-selected">e laid bred-selected">eforred-selected">e cooling of tack coat, brooming and rolling of surfacred-selected">e with pnred-selected">eumatic rollred-selected">er to maximisred-selected">e paving fabric contact with pavred-selected">emred-selected">ent surfacred-selected">e. 25 providing and applying tack coat with bitumred-selected">en red-selected">emulsion using red-selected">emulsion prred-selected">essurred-selected">e distributor at thred-selected">e ratred-selected">e of 0.20 to 0.30 kg pred-selected">er sqm on thred-selected">e prred-selected">eparred-selected">ed bituminous surfacred-selected">e clred-selected">eanred-selected">ed with mred-selected">echanical broom. (tack coat on bituminous surfacred-selected">es ) 26 providing and laying 40mmthickbitumred-selected">encarpred-selected">etred-selected">e(b.c.) with 100-120 tph hot mix plant producing and avred-selected">eragred-selected">e output of 75 tonred-selected">egred-selected">e par hour using crushred-selected">ed aggrred-selected">egatred-selected">es of spred-selected">ecifired-selected">ed grading prred-selected">emixred-selected">ed with bitumred-selected">en bindred-selected">er(vg-30) @ 5.40% of mix as pred-selected">er most spred-selected">ecification clausred-selected">e. red-selected">etc all comp of work. 27 providing and laying in position rred-selected">eady mixred-selected">ed or sitred-selected">e batchred-selected">ed dred-selected">esign mix cred-selected">emred-selected">ent concrred-selected">etred-selected">e forrred-selected">einforcred-selected">ed cred-selected">emred-selected">ent concrred-selected">etred-selected">e work; using coarsred-selected">e aggrred-selected">egatred-selected">e and finred-selected">e aggrred-selected">egatred-selected">e dred-selected">erivred-selected">ed from aggrred-selected">egat aggrred-selected">egatred-selected">e natural sourcred-selected">es, portland pozzolana/ordinary portland/portland slag cred-selected">emred-selected">ent, admixturred-selected">es in rred-selected">ecommred-selected">endred-selected">ed proportions as pred-selected">er is: 9103 to accred-selected">elred-selected">eratred-selected">e / rred-selected">etard sred-selected">etting of concrred-selected">etred-selected">e, to improvred-selected">e durability and workability without impairing strred-selected">ength; including pumping of concrred-selected">etred-selected">e to sitred-selected">e of laying, curing, carriagred-selected">e for all lred-selected">eads as pred-selected">er dirred-selected">ection of thred-selected">e red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e; for thred-selected">e following gradred-selected">es of concrred-selected">etred-selected">e.notred-selected">e: red-selected">extra cred-selected">emred-selected">ent up to 10% of thred-selected">e minimum spred-selected">ecifired-selected">ed cred-selected">emred-selected">ent contred-selected">ent in dred-selected">esign mix shall. bred-selected">e payablred-selected">e sred-selected">eparatred-selected">ely. in casred-selected">e thred-selected">e cred-selected">emred-selected">ent contred-selected">ent in dred-selected">esign mix is morred-selected">e than 110% of thred-selected">e spred-selected">ecifired-selected">ed minimum cred-selected">emred-selected">ent contred-selected">ent, thred-selected">e contractor shall havred-selected">e discrred-selected">etion to red-selected">eithred-selected">errred-selected">e-dred-selected">esign thred-selected">e mix or bred-selected">ear thred-selected">e cost of red-selected">extra cred-selected">emred-selected">ent. 28 m.s. (tor stred-selected">ered-selected">el or plain) in plain work such as rcc orrb work including binding for propred-selected">er shapred-selected">e and including supply of stred-selected">ered-selected">el and its wastagred-selected">e bred-selected">end, hooks and authorizred-selected">ed ovred-selected">erlapping shall bred-selected">e mred-selected">easurred-selected">ed and including cost of binding wirred-selected">e. red-selected">excluding gst (sor-504). 29 [d] bill no. 4 - pred-selected">edred-selected">estrian infrastructurred-selected">e (footpath) 30 sand filling in foundation trred-selected">enchred-selected">es as pred-selected">er drawing & tred-selected">echnical spred-selected">ecification and as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. (including bred-selected">enred-selected">eath all pavred-selected">er blocks, cobblred-selected">e arred-selected">eas for lred-selected">evred-selected">elling purposred-selected">e, red-selected">etc.) 31 plain cred-selected">emred-selected">ent concrred-selected">etred-selected">e 1:3:6 nominal mix in foundation with crushred-selected">ed stonred-selected">e aggrred-selected">egatred-selected">e 40 mm nominal sizred-selected">e mred-selected">echanically mixred-selected">ed, placred-selected">ed in foundation and compactred-selected">ed by vibration including curing for 14 days. (pcc bred-selected">elow all paving arred-selected">ea, kred-selected">erb channred-selected">el, road red-selected">edgred-selected">e kred-selected">erb, tablred-selected">e top, propred-selected">erty red-selected">edgred-selected">e bred-selected">eam) 32 construction of granular sub-basred-selected">e by providing closred-selected">e gradred-selected">ed matred-selected">erial, sprred-selected">eading in uniform layred-selected">ers with motor gradred-selected">er on prred-selected">eparred-selected">ed surfacred-selected">e, mixing by mix in placred-selected">e mred-selected">ethod with front red-selected">end loadred-selected">er at omc, and compacting with vibratory rollred-selected">er to achired-selected">evred-selected">e thred-selected">e dred-selected">esirred-selected">ed dred-selected">ensity, complred-selected">etred-selected">e as pred-selected">er clausred-selected">e 401 (by mix in placred-selected">e mred-selected">ethod) 33 i) for grading-i matred-selected">erial 34 plain/rred-selected">einforcred-selected">ed cred-selected">emred-selected">ent concrred-selected">etred-selected">e in opred-selected">en foundation complred-selected">etred-selected">e as pred-selected">er drawing and tred-selected">echnical spred-selected">ecifications, pcc gradred-selected">e m30using batching plant transit mixred-selected">er & manual placing(80 mm thicknred-selected">ess) r & manual placingand giving broom finish. (pcc with broom finish thicknred-selected">ess 80 mm) 35 providing and laying 75mm thick m-30 gradred-selected">e batch mix cred-selected">emred-selected">ent concrred-selected">etred-selected">e and applying stamping finish to thred-selected">e top surfacred-selected">e of frred-selected">eshly laid plain/ rred-selected">einforcred-selected">ed cred-selected">emred-selected">ent concrred-selected">etred-selected">e of spred-selected">ecifired-selected">ed gradred-selected">e in porticos, sidred-selected">ewalks, drivred-selected">eways, pool dred-selected">ecks and opred-selected">en yards as pred-selected">er dirred-selected">ection of thred-selected">e red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. thred-selected">e procred-selected">ess shall includred-selected">e thred-selected">e following:-thred-selected">e concrred-selected">etred-selected">e shall bred-selected">e placred-selected">ed and scrred-selected">ered-selected">edred-selected">ed to thred-selected">e finishred-selected">ed gradred-selected">e, and floatred-selected">ed to a uniform surfacred-selected">e by using standard finishing tred-selected">echniqured-selected">es. thred-selected">e approvred-selected">ed color hardred-selected">enred-selected">er @ 2.7 kg/sqm shall bred-selected">e applired-selected">ed red-selected">evred-selected">enly to thred-selected">e surfacred-selected">e of thred-selected">e frred-selected">esh concrred-selected">etred-selected">e by thred-selected">e dry shakred-selected">e mred-selected">ethod by sprinkling in two or morred-selected">e shakred-selected">es, floatred-selected">ed aftred-selected">erred-selected">each shakred-selected">e and trowred-selected">ellred-selected">ed only aftred-selected">er thred-selected">e final floating. thred-selected">e approvred-selected">ed rred-selected">elred-selected">easred-selected">e agred-selected">ent @ 0.113 kg/sqm shall bred-selected">e applired-selected">ed red-selected">evred-selected">enly to thred-selected">e trowred-selected">ellred-selected">ed surfacred-selected">e bred-selected">eforred-selected">e stamping or thred-selected">e said rred-selected">elred-selected">easred-selected">e agred-selected">ent can bred-selected">e applired-selected">ed to thred-selected">e flred-selected">exiblred-selected">e polyurred-selected">ethanred-selected">e stamp moulds of approvred-selected">ed dred-selected">esign and in rred-selected">equirred-selected">ed sizred-selected">es to achired-selected">evred-selected">e final stampred-selected">ed pattred-selected">ern. thred-selected">esred-selected">e stampings shall bred-selected">e placred-selected">ed on thred-selected">e surfacred-selected">e of concrred-selected">etred-selected">e in thrred-selected">ered-selected">e to four pired-selected">ecred-selected">es at a timred-selected">e and tappred-selected">ed gred-selected">ently with rammred-selected">ers of sufficired-selected">ent sizred-selected">e & wred-selected">eight to lred-selected">eavred-selected">e propred-selected">er stamp marks and thred-selected">e procred-selected">ess rred-selected">epred-selected">eatred-selected">ed for thred-selected">e rred-selected">emaining concrred-selected">etred-selected">e surfacred-selected">e till thred-selected">e holred-selected">e surfacred-selected">e to bred-selected">e stampred-selected">ed is complred-selected">etred-selected">ed within thred-selected">e timred-selected">e whilred-selected">e concrred-selected">etred-selected">e is in plastic stagred-selected">e of sred-selected">etting.aftred-selected">er stamping, thred-selected">e curing shall bred-selected">e donred-selected">e as pred-selected">er manufacturred-selected">es spred-selected">ecifications. aftred-selected">er initial curing thred-selected">e imprintred-selected">ed joints shall bred-selected">e groutred-selected">ed using cred-selected">emred-selected">ent slurry mixred-selected">ed with color hardred-selected">enred-selected">er as pred-selected">er thred-selected">ered-selected">equirred-selected">emred-selected">ent. thred-selected">e surfacred-selected">e shall bred-selected">e sred-selected">ealred-selected">ed by applying acrylic basred-selected">ed sred-selected">ealred-selected">er not lred-selected">ess than 0.167 litrred-selected">e/sqm.on finishred-selected">ed surfacred-selected">e.thred-selected">e construction joints shall bred-selected">e providred-selected">ed by groovred-selected">e cutting of sizred-selected">e 4mm x 20mm in panred-selected">el sizred-selected">e 3m x 3 m or lred-selected">essred-selected">er as pred-selected">er thred-selected">e sitred-selected">e conditions and filling thred-selected">e samred-selected">e with 10 mm bakred-selected">errod and providing and laying (pu) polyurred-selected">ethanred-selected">e basred-selected">ed joint sred-selected">ealred-selected">er of approvred-selected">ed makred-selected">e as pred-selected">er manufacturred-selected">er’s spred-selected">ecifications and finishred-selected">ed by applying polyurred-selected">ethanred-selected">e rred-selected">esin basred-selected">ed top protred-selected">ectivred-selected">e clred-selected">ear coat of minimum 80 micron applired-selected">ed with rollred-selected">ers on propred-selected">erly curred-selected">ed and dry clred-selected">ean surfacred-selected">e. (cost of concrred-selected">etred-selected">e for flooring is not includred-selected">ed in this itred-selected">em which shall bred-selected">e paid sred-selected">eparatred-selected">ely.) 36 80 mm thick c.c. pavred-selected">er block of m-35 gradred-selected">e with approvred-selected">ed color dred-selected">esign and pattred-selected">ern. 37 supply and fixing of tactilred-selected">e indicators madred-selected">e from ss-304 gradred-selected">e stainlred-selected">ess stred-selected">ered-selected">el. warning tactilred-selected">e indicator shall bred-selected">e installred-selected">ed on thred-selected">e walking surfacred-selected">e in a raisred-selected">ed grid pattred-selected">ern of dots or stud. minimum 36 studs to bred-selected">e placred-selected">ed in 300x300 mm arred-selected">ea. dimred-selected">ensions - 35mm outred-selected">er dia x25mm innred-selected">er dia, stred-selected">em dia 8mmx12mm, wred-selected">eight - 28grm.all thred-selected">e indicatorwill bred-selected">e installred-selected">ed into corrred-selected">ectly drillred-selected">ed holred-selected">es and placred-selected">e any suitablred-selected">e adhred-selected">esivred-selected">e, all thred-selected">e indicators shall bred-selected">e alignred-selected">ed propred-selected">erty, all complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. 38 supply & fixing of tactilred-selected">e indicators madred-selected">e from ss-304 gradred-selected">e stainlred-selected">ess stred-selected">ered-selected">el. dirred-selected">ectorial tactilred-selected">e indicator shall bred-selected">e installred-selected">ed on walking surfacred-selected">e, consisting of a sred-selected">erired-selected">es of raisred-selected">ed bar/strip. min 4 bars/strip to bred-selected">e placred-selected">ed in dirred-selected">ection pred-selected">erpred-selected">endicular to distancred-selected">e of travred-selected">el in 300x300 mm arred-selected">ea. dimred-selected">ensions-280mm l x 35mm w x 4.5mm, stred-selected">em dia 8mmx12mm, wred-selected">eight - 250grm all thred-selected">e indicatorwill bred-selected">e installred-selected">ed into corrred-selected">ectly drillred-selected">ed holred-selected">es and placred-selected">e any suitablred-selected">e adhred-selected">esivred-selected">e, all thred-selected">e indicators shall bred-selected">e alignred-selected">ed propred-selected">erty., all complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. 39 providing and laying tactilred-selected">e tilred-selected">e (for vision impairred-selected">ed pred-selected">ersons as pred-selected">er standards) of sizred-selected">e 300x300x9.8 mm having with watred-selected">er absorption lred-selected">ess than 0.5% and conforming to is : 15622 of approvred-selected">ed makred-selected">e in all colors and shadred-selected">es in for outdoor floors such as footpath, court yard, multi modals location red-selected">etc., laid on 20 mm thick basred-selected">e of cred-selected">emred-selected">ent mortar 1:4 (1 cred-selected">emred-selected">ent : 4 coarsred-selected">e sand) in all shapred-selected">es & pattred-selected">erns including grouting thred-selected">e joints with whitred-selected">e cred-selected">emred-selected">ent mixred-selected">ed with matching pigmred-selected">ents red-selected">etc. complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e 40 chred-selected">equred-selected">errred-selected">ed prred-selected">ecast cred-selected">emred-selected">ent concrred-selected">etred-selected">e tilred-selected">es 22 mm thick in footpath & courtyard, jointred-selected">ed with nred-selected">eat cred-selected">emred-selected">ent slurry mixred-selected">ed with pigmred-selected">ent to match thred-selected">e shadred-selected">e of tilred-selected">es, including rubbing and clred-selected">eaning red-selected">etc. complred-selected">etred-selected">e, on 20 mm thick bred-selected">ed of cred-selected">emred-selected">ent mortar 1:4 (1 cred-selected">emred-selected">ent: 4 coarsred-selected">e sand). (dsr-11.20) 41 providing, laying and making kred-selected">erb channred-selected">el 30 cm widred-selected">e and 50 mm thick with cred-selected">emred-selected">ent concrred-selected">etred-selected">e 1:3:6 (1 cred-selected">emred-selected">ent: 3 coarsred-selected">e sand:6 gradred-selected">ed stonred-selected">e aggrred-selected">egatred-selected">e 20 mm nominal sizred-selected">e) ovred-selected">er 75mm bred-selected">ed of dry brick ballast 40 mm nominal sizred-selected">e, wred-selected">ell rammred-selected">ed and consolidatred-selected">ed and groutred-selected">ed with finred-selected">e sand, including finishing thred-selected">e top smooth red-selected">etc. complred-selected">etred-selected">e and as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. (saucred-selected">er drain along thred-selected">e road red-selected">edgred-selected">e, curvred-selected">ed kred-selected">erbs at propred-selected">erty red-selected">entry/red-selected">exit, curvred-selected">ed kred-selected">erbs at sidred-selected">e roads) 42 providing and laying at or nred-selected">ear ground lred-selected">evred-selected">el factory madred-selected">e kred-selected">erb stonred-selected">e of m-25 gradred-selected">e cred-selected">emred-selected">ent concrred-selected">etred-selected">e in position to thred-selected">e rred-selected">equirred-selected">ed linred-selected">e, lred-selected">evred-selected">el and curvaturred-selected">e, jointred-selected">ed with cred-selected">emred-selected">ent mortar 1:3 (1 cred-selected">emred-selected">ent: 3 coarsred-selected">e sand), including making joints with orwithout groovred-selected">es (thicknred-selected">ess of joints red-selected">excred-selected">ept at sharp curvred-selected">e shall not to morred-selected">e than 5mm), including making drainagred-selected">e opred-selected">ening whred-selected">erred-selected">evred-selected">errred-selected">equirred-selected">ed complred-selected">etred-selected">e red-selected">etc. as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e (lred-selected">ength of finishred-selected">ed kred-selected">erb red-selected">edging shall bred-selected">e mred-selected">easurred-selected">ed for paymred-selected">ent). (prred-selected">ecast c.c. kred-selected">erb stonred-selected">e shall bred-selected">e approvred-selected">ed by red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e). 43 cc gradred-selected">e m20 using batching plant transit mixred-selected">er & manual placing all complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">e-i-c. 44 [red-selected">e] bill no. 5 -parking 45 construction of granular sub-basred-selected">e by providing closred-selected">e gradred-selected">ed matred-selected">erial, sprred-selected">eading in uniform layred-selected">ers with motor gradred-selected">er on prred-selected">eparred-selected">ed surfacred-selected">e, mixing by mix in placred-selected">e mred-selected">ethod with front red-selected">end loadred-selected">er at omc, and compacting with vibratory rollred-selected">er to achired-selected">evred-selected">e thred-selected">e dred-selected">esirred-selected">ed dred-selected">ensity, complred-selected">etred-selected">e as pred-selected">er clausred-selected">e 401 (by mix in placred-selected">e mred-selected">ethod) 46 i) for grading-i matred-selected">erial 47 supplying and filling in plinth with sand undred-selected">er floors/in trred-selected">enchred-selected">es, including watred-selected">ering, ramming, consolidating and drred-selected">essing all complred-selected">etred-selected">e with matred-selected">erial (from sourcred-selected">e to sitred-selected">e), labor and t&p red-selected">etc. rred-selected">equirred-selected">ed for propred-selected">er complred-selected">etion of thred-selected">e work. (including royalty). 48 plain cred-selected">emred-selected">ent concrred-selected">etred-selected">e 1:3:6 nominal mix in foundation with crushred-selected">ed stonred-selected">e aggrred-selected">egatred-selected">e 40 mm nominal sizred-selected">e mred-selected">echanically mixred-selected">ed, placred-selected">ed in foundation and compactred-selected">ed by vibration including curing for 14 days and giving broom finish. (pcc) 49 providing and laying factory madred-selected">e chamfred-selected">erred-selected">ed red-selected">edgred-selected">e cred-selected">emred-selected">ent concrred-selected">etred-selected">e pavred-selected">er blocks in footpath, parks, lawns, drivred-selected">e ways or light traffic parking red-selected">etc, of rred-selected">equirred-selected">ed strred-selected">ength, thicknred-selected">ess & sizred-selected">e/ shapred-selected">e, madred-selected">e by tablred-selected">e vibratory mred-selected">ethod using pu mould, laid in rred-selected">equirred-selected">ed colour & pattred-selected">ern ovred-selected">er 50mm thick compactred-selected">ed bred-selected">ed of sand, compacting and propred-selected">erred-selected">embred-selected">edding/laying of intred-selected">er locking pavred-selected">er blocks into thred-selected">e sand bred-selected">edding layred-selected">er through vibratory compaction by using platred-selected">e vibrator, filling thred-selected">e joints with sand and cutting of pavred-selected">er blocks as pred-selected">errred-selected">equirred-selected">ed sizred-selected">e and pattred-selected">ern, finishing and swred-selected">ered-selected">eping red-selected">extra sand. complred-selected">etred-selected">e all as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e.80 mm thick c.c. pavred-selected">er block of m-35 gradred-selected">e with approvred-selected">ed color dred-selected">esign and pattred-selected">ern. 50 [f] bill no. 6 -cyclred-selected">e track 51 nil 52 [g] bill no. 7 - traffic signs, markings and othred-selected">erroad appurtred-selected">enancred-selected">es 53 providing and red-selected">erred-selected">ecting 2.00 mred-selected">etrred-selected">e high tred-selected">emporary barricading at sitred-selected">e; red-selected">each panred-selected">el of sizred-selected">e 2.50mx2.00m madred-selected">e of 40x40x6mm anglred-selected">e iron or 50x50x3mm hollow ms tubred-selected">e posts/horizontal mred-selected">embred-selected">ers/bracings covred-selected">erred-selected">ed with 1.63mm thick ms shred-selected">ered-selected">et. thred-selected">e shred-selected">ered-selected">et shall bred-selected">e fixred-selected">ed with 30x5mm ms flat by suitablred-selected">e wred-selected">elding/rivred-selected">eting. thred-selected">e panred-selected">els shall bred-selected">e madred-selected">e so that gap of 50cm abovred-selected">e thred-selected">e ground is availablred-selected">e making ovred-selected">erall hred-selected">eight as 2.5m. ms channred-selected">el islc 75 @ 5.70 kg/m, 50cm long shall bred-selected">e providred-selected">ed at thred-selected">e bottom having oval shapred-selected">ed holred-selected">es of sizred-selected">e 50x25mm at both red-selected">ends with 50cm long ms anglred-selected">e 40x40x6mm bracing. suitablred-selected">e arrangred-selected">emred-selected">ent shall bred-selected">e madred-selected">e to fix thred-selected">e barricading to avoid from ovred-selected">erturning by providing 250mm long red-selected">expansion fastred-selected">enred-selected">ers at both red-selected">ends. thred-selected">e work shall bred-selected">e red-selected">exred-selected">ecutred-selected">ed as pred-selected">er drawing/dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e which includred-selected">es writing and painting, arrangred-selected">emred-selected">ent for traffic divred-selected">ersion such as traffic signals during construction at sitred-selected">e for day and night, glow lamps, rred-selected">eflred-selected">ectivred-selected">e signs, marking, flags, caution tapred-selected">e as dirred-selected">ectred-selected">ed by thred-selected">e red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. thred-selected">e barricading providred-selected">ed shall bred-selected">e rred-selected">etainred-selected">ed in position at sitred-selected">e continuously i/c shifting of barricading from onred-selected">e location to anothred-selected">er location as many timred-selected">es as rred-selected">equirred-selected">ed during thred-selected">e red-selected">exred-selected">ecution of thred-selected">e red-selected">entirred-selected">e work till its complred-selected">etion. ratred-selected">e includred-selected">e its maintred-selected">enancred-selected">e for damagred-selected">es, painting, all incidred-selected">entals, labour matred-selected">erials, red-selected">equipmred-selected">ents and works rred-selected">equirred-selected">ed to red-selected">exred-selected">ecutred-selected">e thred-selected">e job. thred-selected">e barricading shall not bred-selected">e rred-selected">emovred-selected">ed without prior approval of red-selected">enginred-selected">ered-selected">er[1]in-chargred-selected">e.(notred-selected">e :- onred-selected">e timred-selected">e paymred-selected">ent shall bred-selected">e madred-selected">e for providing barricading from start of work till complred-selected">etion of work i/c shifting. thred-selected">e barricading providred-selected">ed shall rred-selected">emain to bred-selected">e thred-selected">e propred-selected">erty of thred-selected">e contractor on complred-selected">etion of thred-selected">e work). 54 rred-selected">eflred-selected">ectivred-selected">e raisred-selected">ed pavred-selected">emred-selected">ent markred-selected">ers (cat red-selected">eyred-selected">e/ road stud) supply and fixing of raisred-selected">ed pavred-selected">emred-selected">ent markred-selected">erwith madred-selected">e of plastic body of rpm/ road stud shall bred-selected">e mouldred-selected">ed from asa (acrylic styrred-selected">enred-selected">e acrylonitrilred-selected">e) or hips (high-impact polystyrred-selected">enred-selected">e) or acrylonitrilred-selected">e butadired-selected">enred-selected">e styrred-selected">enred-selected">e (abs) or any othred-selected">er suitablred-selected">e matred-selected">erial approvred-selected">ed by thred-selected">e red-selected">enginred-selected">ered-selected">er. thred-selected">e markred-selected">er shall support a load of 13,635 kg tred-selected">estred-selected">ed in accordancred-selected">e with astm d4260. thred-selected">e rred-selected">eflred-selected">ectivred-selected">e panred-selected">els shall consist, of numbred-selected">er of lred-selected">ensred-selected">es containing singlred-selected">e or dual prismatic cubred-selected">es capablred-selected">e of providing total intred-selected">ernal rred-selected">eflred-selected">ection of thred-selected">e light red-selected">entred-selected">ering thred-selected">e lred-selected">ens facred-selected">e. lred-selected">ensred-selected">es shall bred-selected">e mouldred-selected">ed of mred-selected">ethyl mred-selected">ethacrylatred-selected">e conforming to astm d788 of red-selected">equivalred-selected">ent. thred-selected">e slop orrred-selected">etro-rred-selected">eflred-selected">ecting surfacred-selected">e shall prred-selected">efred-selected">erably ba 5+/.5 dred-selected">egrred-selected">ered-selected">e lo basred-selected">e and thred-selected">e arred-selected">ea of red-selected">each rred-selected">etro -rred-selected">eflred-selected">ecting surfacred-selected">e shall not bred-selected">e lred-selected">ess than 13.00 $q.cm. thred-selected">e markred-selected">er hred-selected">eight shall not bred-selected">e lred-selected">ess than 10 mm and shall not red-selected">excred-selected">ered-selected">ed 20 mm & width shall not red-selected">excred-selected">ered-selected">ed 130 mm thred-selected">e basred-selected">e of thred-selected">e markred-selected">er shall bred-selected">e flat within 1.3 mm all road studs shall bred-selected">e lred-selected">egibly markred-selected">ed with thred-selected">e namred-selected">e tradred-selected">e or othred-selected">er mred-selected">eans of idred-selected">entification of thred-selected">e manufacturred-selected">e. red-selected">epoxy installations, red-selected">excred-selected">ess adhred-selected">esivred-selected">e around thred-selected">e red-selected">edgred-selected">e of thred-selected">e markred-selected">er, red-selected">excred-selected">ess adhred-selected">esivred-selected">e on thred-selected">e pavred-selected">emred-selected">ent and adhred-selected">esivred-selected">e on thred-selected">e red-selected">exposred-selected">ed surfacred-selected">es of thred-selected">e markred-selected">ers shall bred-selected">e immred-selected">ediatred-selected">ely rred-selected">emovred-selected">ed. thred-selected">e contractor shall submit a two yred-selected">earwarranty for satisfactory fired-selected">eld pred-selected">erformancred-selected">e including stipulatred-selected">ed rred-selected">etro-rred-selected">eflred-selected">ectancred-selected">e of thred-selected">e rred-selected">eflred-selected">ecting panred-selected">el , to thred-selected">e red-selected">enginred-selected">ered-selected">er . in addition , a two yred-selected">earwarranty for satisfactory infired-selected">eld pred-selected">erformancred-selected">e of thred-selected">e finishred-selected">ed road markred-selected">er shall also bred-selected">e givred-selected">en by thred-selected">e contractorwho carrired-selected">es out thred-selected">e work of fixing of rred-selected">eflred-selected">ectivred-selected">e road markred-selected">ers. in casred-selected">e thred-selected">e markred-selected">ers arred-selected">e, displacred-selected">ed , damagred-selected">ed . gred-selected">et worn out or losred-selected">e thred-selected">eirrred-selected">eflred-selected">ectivity comparred-selected">ed to stipulatred-selected">ed standards , thred-selected">e contractorwould bred-selected">e rred-selected">equirred-selected">ed to rred-selected">eplacred-selected">e all such markred-selected">ers within 15 days of thred-selected">e intimation from thred-selected">e red-selected">enginred-selected">ered-selected">er , at his own cost. thred-selected">e ratred-selected">e shall includred-selected">e all matred-selected">erials, labor, t&p, transportation, installation and incidred-selected">entals all complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of thred-selected">e red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e, 55 rpm with shank 56 solar powred-selected">erroad markred-selected">er thred-selected">e solar studs shall bred-selected">e madred-selected">e of aluminum alloy and polycarbonatred-selected">e matred-selected">erial which shall bred-selected">e absolutred-selected">ely wred-selected">eathred-selected">errred-selected">esistant and strong red-selected">enough to support to load of 13,635 kg tred-selected">estred-selected">ed in accordancred-selected">e with astm d4280. its color may bred-selected">e whitred-selected">e, rred-selected">ed, yred-selected">ellow, grred-selected">ered-selected">en or blured-selected">e or combination as dirred-selected">ectred-selected">ed by thred-selected">e red-selected">enginred-selected">ered-selected">er. its watred-selected">errred-selected">esistancred-selected">e shall mred-selected">ered-selected">et thred-selected">e rred-selected">equirred-selected">emred-selected">ents of ip 65 in accordancred-selected">e with is: 12063:1987 catred-selected">egory 2 for thred-selected">e protred-selected">ection against watred-selected">er ingrred-selected">ess. thred-selected">e dimred-selected">ensions of solar studs shall not bred-selected">e lred-selected">ess than 100 mm * 100 mm * 10 mm. it shall havred-selected">e supred-selected">er bright lred-selected">eds so as thred-selected">e providred-selected">e long visibility from a distancred-selected">e of morred-selected">e than 800 m. its flashing ratred-selected">e shall not bred-selected">e lred-selected">ess than 1 hz. its should bred-selected">e ablred-selected">e to givred-selected">e thred-selected">e prred-selected">escribred-selected">ed pred-selected">erformancred-selected">e in thred-selected">e tred-selected">empred-selected">eraturred-selected">e rangred-selected">e of -40 dred-selected">egrred-selected">ered-selected">e c to +55 dred-selected">egrred-selected">ered-selected">e c. its lifred-selected">e shall bred-selected">e not lred-selected">ess than 3 yred-selected">ears. thred-selected">e ratred-selected">e shall includred-selected">e all matred-selected">erial, labor, red-selected">equipmred-selected">ents, fabrication, transportation red-selected">erred-selected">ection, installation and incidred-selected">entals all complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of thred-selected">e red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e 57 r.cc work (1:1.5:3) (m-20) with cred-selected">emred-selected">ent coursred-selected">e sand &20mm thred-selected">e stonred-selected">e grit including all complred-selected">etred-selected">e cred-selected">emred-selected">ent concrred-selected">etred-selected">e with cred-selected">emred-selected">ent sand &20mm gaugred-selected">e stonred-selected">e grit with thred-selected">e proportion of (1:1.5:3)including all complred-selected">etred-selected">e thred-selected">e work (morth ra-12.8 c, casred-selected">e-ii) 58 m.s. or iron work plain or tor forrcc work including cutting, bred-selected">ending, rivred-selected">etting orwred-selected">elding red-selected">etc. whred-selected">erred-selected">e nred-selected">ecred-selected">essary. red-selected">excluding gst (s.i.no-504) 59 painting two coats on nred-selected">ew concrred-selected">etred-selected">e surfacred-selected">es - painting two coats aftred-selected">er filling thred-selected">e surfacred-selected">e with synthred-selected">etic red-selected">enamred-selected">el paint in all shadred-selected">es on nred-selected">ew plastred-selected">erred-selected">ed concrred-selected">etred-selected">e surfacred-selected">es 60 m.s. or iron work of hred-selected">eavy sizred-selected">es sred-selected">ection such as trussred-selected">es, built up gatred-selected">es, rred-selected">ecord racks, roof work, gatred-selected">es red-selected">etc. including rivred-selected">etting orwred-selected">elding whred-selected">erred-selected">e nred-selected">ecred-selected">essary. red-selected">excluding gst (s.i.no-503) 61 painting of m.s. grill with red-selected">enamul paint red-selected">etc all complred-selected">etred-selected">e work. (s.i. 15.15 nred-selected">ew itred-selected">em no.) 62 providing and applying 2.5 mm thick road marking strips (rred-selected">etro- rred-selected">eflred-selected">ectivred-selected">e) of spred-selected">ecifired-selected">ed shadred-selected">e/ colour using hot thred-selected">ermoplastic matred-selected">erial by fully/ sred-selected">emi automatic thred-selected">ermoplastic paint applicator machinred-selected">e fittred-selected">ed with profilred-selected">e shored-selected">e, glass bred-selected">eads dispred-selected">ensred-selected">er, propanred-selected">e tank hred-selected">eatred-selected">er and profilred-selected">e shored-selected">e hred-selected">eatred-selected">er, drivred-selected">en by red-selected">expred-selected">erired-selected">encred-selected">ed opred-selected">erator on road surfacred-selected">e including cost of matred-selected">erial, labour, t&p, clred-selected">eaning thred-selected">e road surfacred-selected">e of all dirt, sred-selected">eals, oil, grred-selected">easred-selected">e and forred-selected">eign matred-selected">erial red-selected">etc. complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e and accordancred-selected">e with applicablred-selected">e spred-selected">ecifications. 63 providing and fixing of rred-selected">etro- rred-selected">eflred-selected">ectorizred-selected">ed cautionary, mandatory and informatory sign as pred-selected">er irc :67 madred-selected">e of high intred-selected">ensity gradred-selected">e shred-selected">ered-selected">eting typred-selected">e-ivvidred-selected">e clausred-selected">e 801.3, 2mm thick aluminum shred-selected">ered-selected">eting, 1.5 mm thick supportred-selected">ed on mild stred-selected">ered-selected">el anglred-selected">e iron post 75mm* 75mm *6mm firmly fixred-selected">ed to thred-selected">e ground by mred-selected">eans of propred-selected">erly dred-selected">esignred-selected">ed foundation with m15 gradred-selected">e cred-selected">emred-selected">ent concrred-selected">etred-selected">e 45cm* 45cm*60 cm, 60 cm bred-selected">elow ground lred-selected">evred-selected">el as pred-selected">er thred-selected">e approvred-selected">ed drawing. thred-selected">e rred-selected">etrorred-selected">eflred-selected">ectivred-selected">e shred-selected">ered-selected">eting shall bred-selected">e tred-selected">estred-selected">ed for a cred-selected">ertificatred-selected">e of having thred-selected">e shred-selected">ered-selected">eting cored-selected">efficired-selected">ent of rred-selected">etro rred-selected">eflred-selected">ection, daytimred-selected">e, color and luminancred-selected">e, shrinkagred-selected">e, flred-selected">exibility, linred-selected">errred-selected">emoval, adhred-selected">esion, impact rred-selected">esistancred-selected">e, spred-selected">ecular gloss and fungus rred-selected">esistancred-selected">e, 3 yred-selected">ears outdoors wred-selected">eathred-selected">ering and its having passred-selected">ed thred-selected">esred-selected">e tred-selected">ests shall bred-selected">e obtainred-selected">ed from intred-selected">ernational/ govred-selected">ernmred-selected">ent laboratory/ institutred-selected">e by thred-selected">e manufacturred-selected">er of thred-selected">e shred-selected">ered-selected">eting and in casred-selected">e thred-selected">e cred-selected">ertificatred-selected">e is obtainred-selected">ed from intred-selected">ernational condition, it should bred-selected">e also obtainred-selected">ed from indian condition within 3 yred-selected">ears of launching ofproduct by thred-selected">e manufacturing abroad. altred-selected">ernativred-selected">ely, a cred-selected">ertificatred-selected">e conforming to astm spred-selected">ecification (d4956-09) on artificial accred-selected">elred-selected">eratred-selected">ed wred-selected">eathred-selected">ering rred-selected">equirred-selected">emred-selected">ent from a rred-selected">eputred-selected">ed laboratory in india can bred-selected">e accred-selected">eptred-selected">ed provisionally. in such a situation , thred-selected">e red-selected">employred-selected">er/clired-selected">ent, if so dred-selected">esirred-selected">es, could sred-selected">ered-selected">ek for a pred-selected">erformancred-selected">e guarantred-selected">ered-selected">e which would bred-selected">e rred-selected">elred-selected">easred-selected">ed aftred-selected">errred-selected">ecred-selected">eipt of cred-selected">ertificatred-selected">e mred-selected">ered-selected">eting thred-selected">e rred-selected">equirred-selected">emred-selected">ent of 3 yred-selected">ears outdoorwred-selected">eathred-selected">ering of thred-selected">e shred-selected">ered-selected">eting as pred-selected">er irc 67:2012 . lred-selected">egred-selected">ends, lred-selected">ettred-selected">ers, numred-selected">erals, and bordred-selected">ers red-selected">etc. should bred-selected">e as pred-selected">er mort&h spred-selected">ecification 801.3.7. proof of thred-selected">e samred-selected">e in form of govred-selected">ernmred-selected">ent rred-selected">eports shall bred-selected">e uploadred-selected">ed whilred-selected">e quoting tred-selected">endred-selected">er. 64 90 cm red-selected">equilatred-selected">eral trianglred-selected">e with diffinitation platred-selected">e sizred-selected">e (20cm x 60 cm) 65 60 cm red-selected">equilatred-selected">eral trianglred-selected">e with diffinitation platred-selected">e sizred-selected">e (20cm x 60 cm) 66 60 cm circularwith diffinitation platred-selected">e sizred-selected">e (20cm x 60 cm) 67 80mm x 60mm rred-selected">ectangularwith diffinitation platred-selected">e sizred-selected">e (20cm x 60 cm) 68 60 mm x 45 mm rred-selected">ectangularwith diffinitationplatred-selected">e sizred-selected">e (20cm x 60 cm) 69 60cm x 60cm squarred-selected">e with diffinitation platred-selected">e sizred-selected">e (20cm x 60 cm) 70 90 cm high octagon 71 dirred-selected">ection and placred-selected">e idred-selected">entification signs up to 0.90 sqm sizred-selected">e board providing and red-selected">erred-selected">ecting dirred-selected">ection and placred-selected">e idred-selected">entification rred-selected">etro-rred-selected">eflred-selected">ectorizred-selected">ed sign as pred-selected">er irc-67 madred-selected">e of high intred-selected">ensity gradred-selected">e shred-selected">ered-selected">eting thred-selected">e rred-selected">etro rred-selected">eflred-selected">ectivred-selected">e shred-selected">ered-selected">eting shall bred-selected">e tred-selected">estred-selected">ed for a cred-selected">ertificatred-selected">e of having thred-selected">e shred-selected">ered-selected">eting tred-selected">estred-selected">ed for cored-selected">efficired-selected">ent of rred-selected">etro rred-selected">eflred-selected">ection, daytimred-selected">e color and luminancred-selected">e, shrinkagred-selected">e, flred-selected">exibility, linred-selected">errred-selected">emoval, adhred-selected">esion, impact rred-selected">esistancred-selected">e, spred-selected">ecular gloss and fungus rred-selected">esistancred-selected">e, 3 yred-selected">ears outdoorwred-selected">eathred-selected">ering and its having passred-selected">ed thred-selected">esred-selected">e tred-selected">ests shall bred-selected">e obtainred-selected">ed from intred-selected">ernational/govred-selected">ernmred-selected">ent laboratory/ institutred-selected">e by thred-selected">e manufacturred-selected">er of thred-selected">e shred-selected">ered-selected">eting and in casred-selected">e thred-selected">e cred-selected">ertificatred-selected">e is obtainred-selected">ed from intred-selected">ernational condition, it should also bred-selected">e obtainred-selected">ed from indian condition within 3 yred-selected">ears of launching of product by thred-selected">e manufacturred-selected">e in abroad. altred-selected">ernativred-selected">ely, a cred-selected">ertificatred-selected">e conforming to astm spred-selected">ecification (d4956-09) on artificial accred-selected">elred-selected">eratred-selected">ed wred-selected">eathred-selected">ering rred-selected">equirred-selected">emred-selected">ents from a rred-selected">eputred-selected">ed laboratory in india can bred-selected">e accred-selected">eptred-selected">ed provisionally. in such a situation, thred-selected">e red-selected">employred-selected">er/ clired-selected">ent, if so dred-selected">esirred-selected">es, could sred-selected">ered-selected">ek for a pred-selected">erformancred-selected">e guarantred-selected">ered-selected">e which would bred-selected">e rred-selected">elred-selected">easred-selected">ed aftred-selected">errred-selected">ecred-selected">eipt of cred-selected">ertificatred-selected">e mred-selected">ered-selected">eting thred-selected">e rred-selected">equirred-selected">emred-selected">ent of thrred-selected">ered-selected">e yred-selected">ears outdoorwred-selected">eathred-selected">ering of thred-selected">e shred-selected">ered-selected">eting as pred-selected">er irc 67:2012. lred-selected">egred-selected">ends, lred-selected">ettred-selected">ers, numred-selected">erals and bordred-selected">ers red-selected">etc. should bred-selected">e as pred-selected">er mort&h spred-selected">ecification no-801.3.7. shred-selected">ered-selected">et fixred-selected">ed ovred-selected">er aluminum shred-selected">ered-selected">eting 2 mm thick with arred-selected">ea not red-selected">excred-selected">ered-selected">eding 0.9 sqm. supportred-selected">ed on a mild stred-selected">ered-selected">el singlred-selected">e anglred-selected">e iron post 75x75x6 mm firmly fixred-selected">ed to thred-selected">e ground by mred-selected">eans of propred-selected">erty dred-selected">esignred-selected">ed foundation with m-15 gradred-selected">e cred-selected">emred-selected">ent concrred-selected">etred-selected">e 45x45x60cm., bred-selected">elow ground lred-selected">evred-selected">el as pred-selected">er approvred-selected">ed drawing, complred-selected">etred-selected">e. 72 dirred-selected">ection and placred-selected">e idred-selected">entification signs with sizred-selected">e morred-selected">e than 0.90 sqm sizred-selected">e boardproviding and red-selected">erred-selected">ecting dirred-selected">ection and placred-selected">e idred-selected">entification rred-selected">etro-rred-selected">eflred-selected">ectorizred-selected">ed sign as pred-selected">er irc-67 madred-selected">e of high intred-selected">ensity gradred-selected">e shred-selected">ered-selected">eting thred-selected">e rred-selected">etro rred-selected">eflred-selected">ectivred-selected">e shred-selected">ered-selected">eting shall bred-selected">e tred-selected">estred-selected">ed for a cred-selected">ertificatred-selected">e of having thred-selected">e shred-selected">ered-selected">eting tred-selected">estred-selected">ed for cored-selected">efficired-selected">ent of rred-selected">etro rred-selected">eflred-selected">ection, daytimred-selected">e color and luminancred-selected">e, shrinkagred-selected">e, flred-selected">exibility. linred-selected">errred-selected">emoval, adhred-selected">esion, impact rred-selected">esistancred-selected">e, spred-selected">ecular gloss and fungus rred-selected">esistancred-selected">e, 3 yred-selected">ears outdoorwred-selected">eathred-selected">ering and its having passred-selected">ed thred-selected">esred-selected">e tred-selected">ests shall bred-selected">e obtainred-selected">ed from intred-selected">ernational/govred-selected">ernmred-selected">ent laboratory/ institutred-selected">e by thred-selected">e manufacturred-selected">er of thred-selected">e shred-selected">ered-selected">eting and in casred-selected">e thred-selected">e cred-selected">ertificatred-selected">e is obtainred-selected">ed from intred-selected">ernational condition, it should also bred-selected">e obtainred-selected">ed from indian condition within 3 yred-selected">ears of launching of product by thred-selected">e manufacturred-selected">e in abroad. altred-selected">ernativred-selected">ely, a cred-selected">ertificatred-selected">e conforming to astm spred-selected">ecification (d4956-09) on artificial accred-selected">elred-selected">eratred-selected">ed wred-selected">eathred-selected">ering rred-selected">equirred-selected">emred-selected">ents from a rred-selected">eputred-selected">ed laboratory in india can bred-selected">e accred-selected">eptred-selected">ed provisionally. in such a situation, thred-selected">e red-selected">employred-selected">er/clired-selected">ent, if so dred-selected">esirred-selected">es, could sred-selected">ered-selected">ek for a pred-selected">erformancred-selected">e guarantred-selected">ered-selected">e which would bred-selected">e rred-selected">elred-selected">easred-selected">ed aftred-selected">errred-selected">ecred-selected">eipt of cred-selected">ertificatred-selected">e mred-selected">ered-selected">eting thred-selected">e rred-selected">equirred-selected">emred-selected">ent of thrred-selected">ered-selected">e yred-selected">ears outdoorwred-selected">eathred-selected">ering of thred-selected">e shred-selected">ered-selected">eting as pred-selected">er irc 67:2012. lred-selected">egred-selected">ends, lred-selected">ettred-selected">ers, numred-selected">erals and bordred-selected">ers red-selected">etc. should bred-selected">e as pred-selected">er mort&h spred-selected">ecification no-801.3.7. shred-selected">ered-selected">et fixred-selected">ed ovred-selected">er aluminum shred-selected">ered-selected">eting 2 mm thick with arred-selected">ea red-selected">excred-selected">ered-selected">eding 0.9 sqm. supportred-selected">ed on a mild stred-selected">ered-selected">el singlred-selected">e anglred-selected">e iron post 75x75x6 mm firmly fixred-selected">ed to thred-selected">e ground by mred-selected">eans of propred-selected">erty dred-selected">esignred-selected">ed foundation with m-15 gradred-selected">e cred-selected">emred-selected">ent concrred-selected">etred-selected">e 45x45x60 cm bred-selected">elow ground lred-selected">evred-selected">el as pred-selected">er approvred-selected">ed drawing, complred-selected">etred-selected">e. 73 providing and red-selected">erred-selected">ecting ovred-selected">erhred-selected">ead signs with a corrosion rred-selected">esistant 2mm thick aluminium alloy shred-selected">ered-selected">et rred-selected">eflred-selected">ectorisred-selected">ed with high intred-selected">ensity rred-selected">etro-rred-selected">eflred-selected">ectivred-selected">e shred-selected">ered-selected">eting of red-selected">encapsulatred-selected">ed lred-selected">ensred-selected">e typred-selected">e with vred-selected">ertical and latred-selected">eral clred-selected">earancred-selected">e givred-selected">en in clausred-selected">e 802.2 and 802.3 and installred-selected">ed as pred-selected">er clausred-selected">e 802.7 ovred-selected">er a dred-selected">esignred-selected">ed support systred-selected">em of aluminium alloy or galvanisred-selected">ed stred-selected">ered-selected">el trred-selected">estlred-selected">es and trussred-selected">es of sred-selected">ections and typred-selected">e as pred-selected">er structural dred-selected">esign rred-selected">equirred-selected">emred-selected">ents and approvred-selected">ed plans & as pred-selected">er irc :67 74 brick masonry work in cred-selected">emred-selected">ent mortar 1:4 (1cred-selected">emred-selected">ent: 4 coarsred-selected">e sand) in foundation complred-selected">etred-selected">e with cred-selected">emred-selected">ent concrred-selected">etred-selected">e bricks procurred-selected">ed from c&d wastred-selected">e rred-selected">ecycling plant baswarred-selected">excluding pointing and plastred-selected">ering, as pred-selected">er drawing and tred-selected">echnical spred-selected">ecifications. 75 struck pointing with cred-selected">emred-selected">ent mortar consisting of 1 part cred-selected">emred-selected">ent and 2 parts of finred-selected">e sand of 1.25 finred-selected">ernred-selected">ess modulus.sor 2022 si no574 76 12 mm cred-selected">emred-selected">ent plastred-selected">er finishred-selected">ed with a floating coat of nred-selected">eat cred-selected">emred-selected">ent of mix 1:3 (1 cred-selected">emred-selected">ent :3 sand)and as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er in chargred-selected">e. 77 finishing walls with rred-selected">eady mixred-selected">ed prred-selected">emium acrylic red-selected">emulsion paint (company dred-selected">epot tintred-selected">ed) having volatilred-selected">e organic compound (voc)lred-selected">ess than 50 gm/litred-selected">er and uv rred-selected">esistancred-selected">e as pred-selected">er is 15489:2004, alkali, & fungal rred-selected">esistancred-selected">e, dirt rred-selected">esistancred-selected">e red-selected">extred-selected">erior paint of rred-selected">equirred-selected">ed shadred-selected">e with silicon additivred-selected">e(for painting wall, strred-selected">ered-selected">et furniturred-selected">e) nred-selected">ewwork (two or morred-selected">e coats applired-selected">ed @1.43 litred-selected">er/10sqm ovred-selected">er and including priming coat of red-selected">extred-selected">erior primred-selected">er applired-selected">ed @ 0.90 litred-selected">er/10 sqm) 78 supplying and fixing of cast iron antiqured-selected">e stylred-selected">e bred-selected">ench having wred-selected">eight of sidred-selected">es not lred-selected">ess than 72 kg (36 kg red-selected">each) fittred-selected">ed with fibrred-selected">e rred-selected">ectanglred-selected">e strip (should not bred-selected">e lred-selected">ess than 50 mm x 25 mm and 1.6mm thick. lred-selected">ength of bred-selected">ench should not bred-selected">e lred-selected">ess than 6 ft (red-selected">end to red-selected">end of castiron support). 79 [h] bill no. 8 - utility and strred-selected">ered-selected">et light cabling 80 plain cred-selected">emred-selected">ent concrred-selected">etred-selected">e 1:3:6 nominal mix in foundation with crushred-selected">ed stonred-selected">e aggrred-selected">egatred-selected">e 40 mm nominal sizred-selected">e mred-selected">echanically mixred-selected">ed, placred-selected">ed in foundation and compactred-selected">ed by vibration including curing for 14 days.(pcc bred-selected">elow pipred-selected">e of storm watred-selected">er, sred-selected">ewred-selected">er, watred-selected">er, inspred-selected">ection chambred-selected">er for storm watred-selected">er, tred-selected">elred-selected">ecom chambred-selected">er, powred-selected">er chambred-selected">er and sred-selected">ewred-selected">er) 81 providing and laying non prred-selected">essurred-selected">e np-3 class (mred-selected">edium duty) r.c.c. pipred-selected">es including collars/spigot jointred-selected">ed with stiff mixturred-selected">e of cred-selected">emred-selected">ent mortar in thred-selected">e proportion of 1:2 (1 cred-selected">emred-selected">ent : 2 finred-selected">e sand) including tred-selected">esting of joints red-selected">etc. complred-selected">etred-selected">e (storm watred-selected">er, sred-selected">ewred-selected">er) 82 600 mm dia rcc pipred-selected">es 83 providing of 7- way 40mm multi ducts with solid pred-selected">ermanred-selected">ently solidly lubricatred-selected">ed siliconred-selected">e in innred-selected">er layred-selected">er for ict fibred-selected">er cablred-selected">es conforming to astm f 2160, astm d 2444 and /orred-selected">equivalred-selected">ent indian standard. red-selected">extred-selected">ernal shred-selected">eathshall bred-selected">e in orangred-selected">e colorand shall bred-selected">e frred-selected">ered-selected">e from visual dred-selected">efred-selected">ects likred-selected">e blistred-selected">ers, shrink holred-selected">es,flaking, scratchred-selected">es, groovred-selected">e linred-selected">es & surfacred-selected">e roughnred-selected">ess. thred-selected">e color of thred-selected">e 7 nos. plb hdpred-selected">e ducts shall bred-selected">e grred-selected">ered-selected">en, blured-selected">e, yred-selected">ellow, brown, violred-selected">et, grred-selected">ey , rred-selected">ed for diffred-selected">erred-selected">entiation. outred-selected">er shred-selected">ered-selected">et thicknred-selected">essshall bred-selected">e 1.2mm +/-0.2mm. thred-selected">e innred-selected">er surfacred-selected">e of thred-selected">e multi channred-selected">el ducts shall bred-selected">e spirally ribbred-selected">ed & shall bred-selected">e of a configuration for fastred-selected">er installation of cablred-selected">es. wall thicknred-selected">ess(mm) of red-selected">each of thred-selected">e ducts red-selected">excluding rib hred-selected">eight shall bred-selected">e 2.9mm +/- 0.3mm. iso rred-selected">equirred-selected">emred-selected">ents- iso 9001, 14001, 18001, complred-selected">etred-selected">e as pred-selected">er spred-selected">ecifications and dirred-selected">ections of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. (7 way multi utility duct for ofc) 84 supply of hdpred-selected">e pipred-selected">e of sizred-selected">e 110mm for distribution systred-selected">em conformingn to latred-selected">est/ rred-selected">elred-selected">evant i.s. 4984/1995 spred-selected">ecifications with all jointing matred-selected">erials and spred-selected">ecials conforming to latred-selected">est /rred-selected">elred-selected">evant i.s. spred-selected">ecifications including f.o.r. dred-selected">estination and all taxred-selected">es and insurancred-selected">e red-selected">etc. with loading, unloading and carting up to sitred-selected">e of work, also including spred-selected">ecials for thred-selected">esred-selected">e pipred-selected">es and lowred-selected">ering thred-selected">em into thred-selected">e trred-selected">enchred-selected">es and laying trured-selected">e to alignmred-selected">ent and gradired-selected">ent and jointing red-selected">etc. complred-selected">etred-selected">e (including tred-selected">esting of pipred-selected">e linred-selected">es and cutting of pipred-selected">es for making up thred-selected">e lred-selected">ength but red-selected">excluding thred-selected">e cost of trred-selected">enchred-selected">es) all complred-selected">etred-selected">e as pred-selected">er instructions of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e.110mm dia hdpred-selected">e pipred-selected">e pn-6 class pred-selected">e-100 85 supply of hdpred-selected">e pipred-selected">e of sizred-selected">e 63mm for distribution systred-selected">em conformingn to latred-selected">est/ rred-selected">elred-selected">evant i.s. 4984/1995 spred-selected">ecifications with all jointing matred-selected">erials and spred-selected">ecials conforming to latred-selected">est /rred-selected">elred-selected">evant i.s. spred-selected">ecifications including f.o.r. dred-selected">estination and all taxred-selected">es and insurancred-selected">e red-selected">etc. with loading, unloading and carting up to sitred-selected">e of work, also including spred-selected">ecials for thred-selected">esred-selected">e pipred-selected">es and lowred-selected">ering thred-selected">em into thred-selected">e trred-selected">enchred-selected">es and laying trured-selected">e to alignmred-selected">ent and gradired-selected">ent and jointing red-selected">etc. complred-selected">etred-selected">e (including tred-selected">esting of pipred-selected">e linred-selected">es and cutting of pipred-selected">es for making up thred-selected">e lred-selected">ength but red-selected">excluding thred-selected">e cost of trred-selected">enchred-selected">es) all complred-selected">etred-selected">e as pred-selected">er instructions of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e.63mm dia hdpred-selected">e pipred-selected">e pn-6 class pred-selected">e-100 86 rcc gradred-selected">e m20 using batching plant transit mixred-selected">er & manual placing ( sidred-selected">e wall, bottom slab for all inspred-selected">ection chambred-selected">er i.red-selected">e. storm watred-selected">er, tred-selected">elred-selected">ecom, powred-selected">er, sred-selected">ewred-selected">er, watred-selected">er) 87 supply and installation on sitred-selected">e - rred-selected">ecred-selected">essred-selected">ed doublred-selected">e sred-selected">eal ofwith a clred-selected">ear opred-selected">ening of750*750 mm di manholred-selected">e covred-selected">er and framred-selected">e(matred-selected">erial- ductilred-selected">e iron gradred-selected">e 500/7) of class b125 having minimum load capacity 125 kn load as pred-selected">erred-selected">en124-2, thred-selected">e top covred-selected">er( should havred-selected">e 2 no. of kred-selected">eyholred-selected">es ) as pred-selected">er thred-selected">e dred-selected">esign approvred-selected">ed by red-selected">enginred-selected">ered-selected">er in chargred-selected">edred-selected">esign approvred-selected">ed by red-selected">enginred-selected">ered-selected">er in chargred-selected">e. 88 supply and installation on sitred-selected">e - rred-selected">ecred-selected">essred-selected">ed doublred-selected">e sred-selected">eal ofwith a clred-selected">ear opred-selected">ening of750*750 mm di manholred-selected">e covred-selected">er and framred-selected">e(matred-selected">erial- ductilred-selected">e iron gradred-selected">e 500/7) of class d400 having minimum load capacity 400 kn load as pred-selected">erred-selected">en124-2, thred-selected">e top covred-selected">er( should havred-selected">e 2 no. of kred-selected">eyholred-selected">es ) as pred-selected">er thred-selected">e dred-selected">esign approvred-selected">ed by red-selected">enginred-selected">ered-selected">er in chargred-selected">edred-selected">esign approvred-selected">ed by red-selected">enginred-selected">ered-selected">er in chargred-selected">e. (storm watred-selected">er) 89 supply and fixing gully gratred-selected">es rred-selected">ed 048 grh – 300* 750mm d.i. gully gratred-selected">e & framred-selected">e in d400 load class , as pred-selected">er bs red-selected">en 124 black bitumred-selected">en paint, all complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er-in-chargred-selected">e. 90 constructing rcc rred-selected">ectangular typred-selected">e manholred-selected">ewith a floating coat of nred-selected">eat cred-selected">emred-selected">ent, foundation concrred-selected">etred-selected">e 1:6:12mix (1 cred-selected">emred-selected">ent : 6 coarsred-selected">e sand : 12 gradred-selected">ed brick bats 40 mm nominal sizred-selected">e), and making nred-selected">ecred-selected">essary channred-selected">el in cred-selected">emred-selected">ent concrred-selected">etred-selected">e of m-25 gradred-selected">e finishred-selected">ed with a floating coat of nred-selected">eat cred-selected">emred-selected">ent, all complred-selected">etred-selected">e as pred-selected">er standard dred-selected">esign and instruction of red-selected">e-i-c. 91 rred-selected">estoration of watred-selected">er pipred-selected">elinred-selected">e in casred-selected">e of damagred-selected">e 92 [i] bill no. 9 - horticulturred-selected">e / landscaping works 93 trred-selected">enching in ordinary soil up to rred-selected">equirred-selected">ed dred-selected">epth including rred-selected">emoval and stacking of sred-selected">ervicred-selected">eablred-selected">e matred-selected">erials and thred-selected">en disposing of as dirred-selected">ectred-selected">ed and sprred-selected">eading red-selected">earth & nred-selected">eatly lred-selected">evred-selected">elling, brred-selected">eaking clods red-selected">etc. and making thred-selected">e trred-selected">enchred-selected">ed arred-selected">ea with dred-selected">esignred-selected">ed mounds, paths and sitting spacred-selected">es red-selected">etc. to propred-selected">er lred-selected">evred-selected">els by filling with red-selected">earth orred-selected">earth mixred-selected">ed with manurred-selected">e and propred-selected">erly watred-selected">ering complred-selected">etred-selected">e work in rred-selected">equirred-selected">ed topography as pred-selected">er drawing & spred-selected">ecifications. 94 supplying and stacking of good red-selected">earth at sitred-selected">e including royalty but including carriagred-selected">e1km (red-selected">earth mred-selected">easusrred-selected">ed in stacks will bred-selected">e rred-selected">educred-selected">ed by 20% for paymred-selected">ent). 95 supplying and stacking at sitred-selected">e dump manurred-selected">e from approvred-selected">ed sourcred-selected">e,including carriagred-selected">e up to 1 km (manurred-selected">e mred-selected">easurred-selected">ed in stacks will bred-selected">e rred-selected">educred-selected">ed by8% for paymred-selected">ent) 96 mixing red-selected">earth and manurred-selected">e in spred-selected">ecifired-selected">ed proportion or as dirred-selected">ectred-selected">ed. 97 rough drred-selected">essing thred-selected">e trred-selected">enchred-selected">ed ground including brred-selected">eaking thred-selected">e clods. 98 finred-selected">e drred-selected">essing thred-selected">e ground 99 sprred-selected">eading ofmixred-selected">ed good red-selected">earth and manurred-selected">e in spred-selected">ecifired-selected">ed proportions as abovred-selected">e and in rred-selected">equirred-selected">ed thicknred-selected">ess. 100 uprooting wred-selected">ered-selected">eds from thred-selected">e trred-selected">enchred-selected">ed arred-selected">ea aftred-selected">er 10 to 15 days aftred-selected">er flooding with watred-selected">er including disposal of uprootred-selected">ed vred-selected">egred-selected">etation. 101 providing & laying sred-selected">elred-selected">ection no. 1 grass turf with red-selected">earth 50mm to 60mm thicknred-selected">ess on red-selected">existing ground prred-selected">eparred-selected">ed with propred-selected">er lred-selected">evred-selected">el and ramming with rred-selected">equirred-selected">ed tools woodred-selected">en and than rolling thred-selected">e surfacred-selected">e with light rollred-selected">er makred-selected">e thred-selected">e surfacred-selected">e smoothred-selected">en and light watred-selected">ering thred-selected">e samred-selected">e, as pred-selected">er dirred-selected">ection of officred-selected">er in chargred-selected">e 102 prred-selected">eparation of mounds of various sizred-selected">e and shapred-selected">e by availablred-selected">e red-selected">excavatred-selected">ed / supplired-selected">ed red-selected">earth in layred-selected">ers not red-selected">excred-selected">ered-selected">eding 20 cm in dred-selected">epth, brred-selected">eaking clods, watred-selected">ering of red-selected">each layred-selected">er, drred-selected">essing red-selected">etc., lred-selected">ead upto 50 mred-selected">etred-selected">er and lift upto 1.5 m complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of officred-selected">er-in-chargred-selected">e. 103 red-selected">excavating, supplying and filling of local red-selected">earth (including royalty) by mred-selected">echanical transport upto a lred-selected">ead of 5km also including ramming and watred-selected">ering of thred-selected">e red-selected">earth in layred-selected">ers not red-selected">excred-selected">ered-selected">eding 20 cm in trred-selected">enchred-selected">es, plinth,sidred-selected">es of foundation red-selected">etc. complred-selected">etred-selected">e. 104 providing and stacking of nauclred-selected">ea cadamba (kadam) of hred-selected">eight 150-165 cm. in big poly bag of sizred-selected">e 25 cm as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 105 providing and stacking of nyctanthred-selected">es arbor-tristis (hasingar) of ht. 90-105 cm in red-selected">earthred-selected">en pots of sizred-selected">e 20 cm as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 106 providing and stacking of tred-selected">erminalia arjuna of hred-selected">eight 150-165 cm. in big polybags of sizred-selected">e 25 cm as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 107 providing and stacking of plumred-selected">eria alba dwarf dwarf of hred-selected">eight 90-105 cm. with 3-4 branchred-selected">es and thick stred-selected">em in big sizred-selected">e hdpred-selected">e bags as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 108 providing and stacking of plumred-selected">eria rubra of hred-selected">eight 120-150 cm. with 3-4 branchred-selected">es and thick stred-selected">em in big sizred-selected">e hdpred-selected">e bags as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 109 providing and stacking of ficus panda of hred-selected">eight 90-105 cm. with 10-12 branchred-selected">es and hred-selected">ealthy foliagred-selected">e, wred-selected">ell formred-selected">ed in cred-selected">emred-selected">ent pots of sizred-selected">e 30 cm as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e.. 110 providing and stacking of ficus rred-selected">eginald wred-selected">ell branchred-selected">ed, bushy of hred-selected">eight 60-75 cm. in red-selected">earthred-selected">en pots of sizred-selected">e 25 cm as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e.. 111 providing and stacking of duranta goldred-selected">en, having ht.15 to 20 cm bushtyshapred-selected">e with frred-selected">esh and hred-selected">ealthy lred-selected">eavred-selected">es in 15 cm sizred-selected">e of red-selected">earthred-selected">en pot/plastic pot & as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e.. 112 providing and stacking of tradred-selected">escantia zred-selected">ebrina having in 15 cm sizred-selected">e of red-selected">earthred-selected">en pot/plastic pot & as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 113 providing and stacking of wred-selected">edred-selected">elia trilobata,full of lred-selected">eavred-selected">es in 15 cm sizred-selected">e ofpoly bags & as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 114 providing and stacking of asparagus sprred-selected">engred-selected">eri of hred-selected">eight 30 cm to 45 cm, full of lred-selected">eafy branchred-selected">es in 15 cm sizred-selected">e of red-selected">earthred-selected">en pot / plastic pot & as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e.. 115 providing and stacking of ophiopogon jaburan ( varired-selected">egatred-selected">ed ), full of varired-selected">egatred-selected">ed lred-selected">eavred-selected">es in red-selected">earthred-selected">en pot/plastic pot of sizred-selected">e 20 cm. as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 116 providing and displaying of croton pred-selected">etra bangalorred-selected">e varired-selected">ety having ht. 60 cm to 75 cm with 4 to 6 branchred-selected">es, wred-selected">ell dred-selected">evred-selected">elopred-selected">ed, frred-selected">esh and hred-selected">ealthy colorful lred-selected">eavred-selected">es in 25 cm sizred-selected">e of red-selected">earthred-selected">en pot/plastic pot & as pred-selected">er dirred-selected">ection of thred-selected">e officred-selected">er-in-chargred-selected">e. 117 providing and fixing ms iron trred-selected">ered-selected">e guard 60 cm dia and 2 mred-selected">etrred-selected">e high abovred-selected">e ground lred-selected">evred-selected">el formred-selected">ed of 4 nos (25 x 6 mm) and 8 nos (25 x 3 mm) vred-selected">ertical ms rivred-selected">etred-selected">ed to 3 nos (25 x 6 mm) iron rings in two halvred-selected">es, boltred-selected">ed togred-selected">ethred-selected">erwith 8 mm dia and 30 mm long bolts including painting two coats with paint of approvred-selected">ed brand ovred-selected">er a coat of priming, complred-selected">etred-selected">e in all rred-selected">espred-selected">ects. 118 strred-selected">ered-selected">et light works (red-selected">excluding gst) 119 supply & fixing of 9 mtr gi octagonal polred-selected">e of approvred-selected">ed makred-selected">e (top dia 70mm, bottom dia 155 mm and basred-selected">e platred-selected">e 12mm thik) having 3mm thiknred-selected">ess with singlred-selected">e arm brackred-selected">et (1 mtr lred-selected">ength) on rcc foundation including thred-selected">e cost of foundation, foundation bolts, red-selected">excavation & back filling and rred-selected">equirred-selected">ed t&p complred-selected">etred-selected">e in all rred-selected">espred-selected">ect 120 supply and fixing of lred-selected">ed strred-selected">ered-selected">et light fitting having dired-selected">e cast aluminium body and diffusred-selected">erwith drivred-selected">er sred-selected">et suitablred-selected">e for 110 to 130 watt. confirming to ip 66 protred-selected">ection complred-selected">etred-selected">e in all rred-selected">espred-selected">ect. cat: aaa 121 supply and laying of 16 sq.mm. 4 corred-selected">e aluminium conductor pvc insulatred-selected">ed armourred-selected">ed sred-selected">ervred-selected">ed shred-selected">eathred-selected">ed cablred-selected">es 1100 volts gradred-selected">e at a dred-selected">epth of 750 mm bred-selected">elow ground lred-selected">evred-selected">el ovred-selected">er a cushion of 75 mm. thick sand all around and protred-selected">ectred-selected">ed with burnt bricks on sidred-selected">es and on top. on surfacred-selected">e thred-selected">e cablred-selected">e run shall bred-selected">e fixred-selected">ed on m.s. clamps red-selected">etc. of suitablred-selected">e sizred-selected">e or as dirred-selected">ectred-selected">ed by thred-selected">e red-selected">enginred-selected">ered-selected">er-inchargred-selected">e, complred-selected">etred-selected">e in all rred-selected">espred-selected">ect. thred-selected">e armouring of thred-selected">e cablred-selected">e shall bred-selected">e propred-selected">erly connred-selected">ectred-selected">ed with thred-selected">e red-selected">earth conductor by clamps red-selected">etc. 122 supplying and laying 6 swg g.i. wirred-selected">e at 0.50 mred-selected">etrred-selected">e bred-selected">elow ground lred-selected">evred-selected">el for conductorred-selected">earth red-selected">elred-selected">ectrodred-selected">e, including connred-selected">ection/tred-selected">ermination with gi thimblred-selected">e red-selected">etc. as rred-selected">equirred-selected">ed. 123 supply and burring of safred-selected">e red-selected">earthing red-selected">elred-selected">ectrodred-selected">e t-39 (hot-dip galvanizred-selected">ed), lred-selected">ength up to 3000mm, outred-selected">er pipred-selected">e 76mm innred-selected">er dia38mm tred-selected">erminal dia 12 mm ,outred-selected">er gipipred-selected">e of 16 swg and innred-selected">er gi pipred-selected">e of 12 swg withhot dip galvanization up to 100 micron fillred-selected">ed with crystallinred-selected">e conductivred-selected">e mixturred-selected">e (ccm) having anti corrosivred-selected">e & conductivred-selected">e propred-selected">erty with 50 kgs activatred-selected">ed soil (bfc) capablred-selected">e of rred-selected">educing thred-selected">e soil rred-selected">esistivity with good mixturred-selected">e of rred-selected">etaining capacity along with 30cm squarred-selected">e c.i. framred-selected">e with hingred-selected">ed covred-selected">er & masonary housing. (from red-selected">elred-selected">ectrodred-selected">e tred-selected">erminal to switch board, cost of 25 x 3 gi. strip will bred-selected">e red-selected">extra) makred-selected">e: as approvred-selected">ed in u.p. p.w.d., & c.p.r.i. cred-selected">ertifired-selected">ed. 124 making connred-selected">ection of red-selected">each strred-selected">ered-selected">et light by s/l 1.5 sqmm frlsh coppred-selected">erwirred-selected">e complred-selected">etred-selected">e as pred-selected">er dirred-selected">ection of red-selected">enginred-selected">ered-selected">er in chargred-selected">e. 125 supply & fixing of 9 mtr gi octagonal polred-selected">e of approvred-selected">ed makred-selected">e (top dia 70mm, bottom dia 155 mm and basred-selected">e platred-selected">e 12mm thik) having 3mm thiknred-selected">ess with doublred-selected">e arm brackred-selected">et (1 mtr lred-selected">ength red-selected">each ) on rcc foundationincluding thred-selected">e cost of foundation, foundation bolts, red-selected">excavation & back filling and rred-selected">equirred-selected">ed t&p complred-selected">etred-selected">ered-selected">e in all rred-selected">espred-selected">ect. 126 supply & laying of 63 mm dia (od-63 mm & id- 51 mm nominal) dwc hdpred-selected">e pipred-selected">e isi markred-selected">ed along with all accred-selected">essorired-selected">es likred-selected">e sockred-selected">et, bred-selected">end, couplred-selected">ers, red-selected">etc. conforming to is 14930, part ii complred-selected">etred-selected">e with fitting and cutting, jointing, red-selected">etc. dirred-selected">ect in ground (75 cm bred-selected">elow ground lred-selected">evred-selected">el) including red-selected">excavation & rred-selected">efilling thred-selected">e trred-selected">ench but red-selected">excluding sand cushioning & protred-selected">ectivred-selected">e covred-selected">ering red-selected">etc, complred-selected">etred-selected">e as rred-selected">equirred-selected">ed. 127 supply and fixing for automatic strred-selected">ered-selected">et light cubical control juction box paintred-selected">ed with anti-corrosivred-selected">e alkali and acid proof pait consisting of 6 amps mcb (b - curvred-selected">e) complred-selected">etred-selected">e in all rred-selected">espred-selected">ect 128 supply and fixing of 16 sq.mm plain or pin typred-selected">e coppred-selected">er tin platred-selected">ed cablred-selected">e sockred-selected">et ( lug ) to thred-selected">e cablred-selected">e lred-selected">eads, insulating with tapred-selected">e and making connred-selected">ection red-selected">etc. complred-selected">etred-selected">e in all rred-selected">espred-selected">ect as pred-selected">er dirred-selected">ection of thred-selected">e red-selected">enginred-selected">ered-selected">er-inchargred-selected">e. 129 supply and fixing of 40 amp. capacity of automatic strred-selected">ered-selected">et light cubiclred-selected">e control panred-selected">el paintred-selected">ed with anti corrosivred-selected">e alkali and acid proof paint consisting of timred-selected">e switch tso 100 sred-selected">erired-selected">es with contactors, hrc fusred-selected">es, isolating switch mred-selected">etred-selected">ering instrumred-selected">ent & instrumred-selected">ent box with cts red-selected">etc. in casred-selected">e of tpn, complred-selected">etred-selected">e in all rred-selected">espred-selected">ect. 130 supply and laying of 32 mm x 6 mm g.i. strip from red-selected">earth red-selected">elred-selected">ectrodred-selected">e dirred-selected">ectly in thred-selected">e ground as rred-selected">equirred-selected">ed complred-selected">etred-selected">e in all rred-selected">espred-selected">ect. 131 supply/ red-selected">erred-selected">ection of surfacred-selected">e mountred-selected">ed dred-selected">ecorativred-selected">e polred-selected">e 4500 mm long having basred-selected">e platred-selected">e 300x300x12 mm with thred-selected">e bottom dia 139 mm upto 1 mtr long with thred-selected">e thicknred-selected">ess of 3.6 mm and thred-selected">e top dia is 76 mm upto 3.5 mtr. log. dred-selected">ecorativred-selected">e polred-selected">e madred-selected">e out of galvanizred-selected">ed iron tubred-selected">e with cast aluminium red-selected">embred-selected">ellishmred-selected">ents. thred-selected">e polred-selected">es arred-selected">e paintred-selected">ed with polyturred-selected">etnanred-selected">e paint. thred-selected">e polred-selected">e havred-selected">e sred-selected">ervicred-selected">e window at thred-selected">e bottom on thred-selected">e polred-selected">e for housing thred-selected">e mcb and tred-selected">erminal strips and as pred-selected">er attachred-selected">ed drawings. 132 s/f of singlred-selected">e arm dred-selected">ecorativred-selected">e brackred-selected">et 100 mm long madred-selected">e of cast iron/ aluminium red-selected">embred-selected">ellishmred-selected">ents paintred-selected">ed with polyturred-selected">etnanred-selected">e paint. 133 supply of lred-selected">ed dred-selected">ecorativred-selected">e drop down light madred-selected">e of aluminium housing fittred-selected">ed with polycarbonatred-selected">e diffusred-selected">er having 500 mm dia with 70 w. 134 supplyandlayingof aluminiumconductorpvc insulatred-selected">ed armourred-selected">ed sred-selected">ervred-selected">ed shred-selected">eathred-selected">ed cablred-selected">es 1100 volts gradred-selected">e at a dred-selected">epth of 750 mm bred-selected">elow ground lred-selected">evred-selected">el ovred-selected">er a cushion of 75 mm. thick sand all around and protred-selected">ectred-selected">ed with burnt bricks on sidred-selected">es and on top. on surfacred-selected">e thred-selected">e cablred-selected">e run shall bred-selected">e fixred-selected">ed on m.s. clamps red-selected">etc. of suitablred-selected">e sizred-selected">e or as dirred-selected">ectred-selected">ed by thred-selected">e red-selected">enginred-selected">ered-selected">er-inchargred-selected">e, complred-selected">etred-selected">e in all rred-selected">espred-selected">ect. thred-selected">e armouring of thred-selected">e cablred-selected">e shall bred-selected">e propred-selected">erly connred-selected">ectred-selected">ed with thred-selected">e red-selected">earth conductor by clamps red-selected">etc. 16 sq. mm 4 corred-selected">e 135 supply and fixing following capacity of automatic strred-selected">ered-selected">et light cubiclred-selected">e control panred-selected">el paintred-selected">ed with anti corrosivred-selected">e alkali and acid proof paint consisting of timred-selected">e switch tso 100 sred-selected">erired-selected">es with contactors, hrc fusred-selected">es, isolating switch mred-selected">etred-selected">ering instrumred-selected">ent & instrumred-selected">ent box with cts red-selected">etc. in casred-selected">e of tpn, complred-selected">etred-selected">e in all rred-selected">espred-selected">ect. 40 a tpn 136 supply and fixing of plain or pin typred-selected">e coppred-selected">er tin platred-selected">ed cablred-selected">e sockred-selected">et ( lug ) to thred-selected">e cablred-selected">e lred-selected">eads, insulating with tapred-selected">e and making connred-selected">ection red-selected">etc. complred-selected">etred-selected">e in all rred-selected">espred-selected">ect as pred-selected">er dirred-selected">ection of thred-selected">e red-selected">enginred-selected">ered-selected">er-inchargred-selected">e. 16 sq. mm 137 supply & laying of 63 mm dia (od-63 mm & id- 51 mm nominal) dwc hdpred-selected">e pipred-selected">e isi markred-selected">ed along with all accred-selected">essorired-selected">es likred-selected">e sockred-selected">et, bred-selected">end, couplred-selected">ers, red-selected">etc. conforming to is 14930, part ii complred-selected">etred-selected">e with fitting and cutting, jointing, red-selected">etc. dirred-selected">ect in ground (75 cm bred-selected">elow ground lred-selected">evred-selected">el) including red-selected">excavation & rred-selected">efilling thred-selected">e trred-selected">ench but red-selected">excluding sand cushioning & protred-selected">ectivred-selected">e covred-selected">ering red-selected">etc, complred-selected">etred-selected">e as rred-selected">equirred-selected">ed. 138 supply and laying 6 swg g.i. wirred-selected">e at 0.50 mred-selected">etrred-selected">e bred-selected">elow ground lred-selected">evred-selected">el for conductorred-selected">earth red-selected">elred-selected">ectrodred-selected">e, including connred-selected">ection/tred-selected">ermination with gi thimblred-selected">e red-selected">etc. as rred-selected">equirred-selected">ed. 139 supply and burring of safred-selected">e red-selected">earthing red-selected">elred-selected">ectrodred-selected">e t-39 (hot-dip galvanizred-selected">ed), lred-selected">ength up to 3000mm, outred-selected">er pipred-selected">e 76mm innred-selected">er dia38mm tred-selected">erminal dia 12 mm ,outred-selected">er gipipred-selected">e of 16 swg and innred-selected">er gi pipred-selected">e of 12 swg withhot dip galvanization up to 100 micron fillred-selected">ed with crystallinred-selected">e conductivred-selected">e mixturred-selected">e (ccm) having anti corrosivred-selected">e & conductivred-selected">e propred-selected">erty with 50 kgs activatred-selected">ed soil (bfc) capablred-selected">e of rred-selected">educing thred-selected">e soil rred-selected">esistivity with good mixturred-selected">e of rred-selected">etaining capacity along with 30cm squarred-selected">e c.i. framred-selected">e with hingred-selected">ed covred-selected">er & masonary housing. (from red-selected">elred-selected">ectrodred-selected">e tred-selected">erminal to switch board, cost of 25 x 3 gi. strip will bred-selected">e red-selected">extra) makred-selected">e: as approvred-selected">ed in u.p. p.w.d., & c.p.r.i. cred-selected">ertifired-selected">ed. 140 part - b utility shifting (including gst) 141 convred-selected">erstion of lt ovred-selected">erhred-selected">ead linred-selected">e by undred-selected">erground lt linred-selected">e 142 lt xlpred-selected">e insulatred-selected">ed cablred-selected">e of sizred-selected">e 3.5x400 sqmm. 143 lt xlpred-selected">e insulatred-selected">ed cablred-selected">e of sizred-selected">e 3.5x240 sqmm. 144 lt xlpred-selected">e insulatred-selected">ed cablred-selected">e of sizred-selected">e 3.5x150 sqmm. 145 lt xlpred-selected">e insulatred-selected">ed cablred-selected">e of sizred-selected">e 3.5x70 sqmm. 146 9 mtr long stp 147 hdpred-selected">e pipred-selected">e 140mm dia pred-selected">eb0, pn-6 148 hdpred-selected">e pipred-selected">e 120 mm dia pred-selected">eb0, pn-6 149 hdpred-selected">e pipred-selected">e 75 mm dia p880, pn-6 150 aluminium crimping lugs 400sqmm 151 aluminium crimping lugs 240sqmm 152 aluminium crimping lugs 150sqmm 153 aluminium crimping lugs 70sqmm 154 6 swg g.l. wirred-selected">e forred-selected">earthing along cablred-selected">es. 155 cablred-selected">e red-selected">end tred-selected">ermination using total doublred-selected">e comprred-selected">ession brass glands and crimping typred-selected">e cu. thimblred-selected">es for 3.5x400 sqmm. lt cablred-selected">e 156 cablred-selected">e red-selected">end tred-selected">ermination using total doublred-selected">e comprred-selected">ession brass glands and crimping typred-selected">e cu. thimblred-selected">es for 3.5x240 sqmm. lt cablred-selected">e 157 cablred-selected">e red-selected">end tred-selected">ermination using total doublred-selected">e comprred-selected">ession brass glands and crimping typred-selected">e cu. thimblred-selected">es for 3.5x150 sqmm. lt cablred-selected">e 158 cablred-selected">e red-selected">end tred-selected">ermination using total doublred-selected">e comprred-selected">ession brass glands and crimping typred-selected">e cu. thimblred-selected">es for 3.5x70 sqmm. lt cablred-selected">e 159 main lt panred-selected">el at sub station- 400 kva (typred-selected">e a-2)lncomred-selected">er- 1 sred-selected">et of 800 amp. tp mccb with sprred-selected">eadred-selected">er & red-selected">extred-selected">endred-selected">ed handlred-selected">emred-selected">etred-selected">ering on lncomred-selected">er - 1 sred-selected">et of digital ammred-selected">etred-selected">erwith ass- 1 sred-selected">et of digatal voltmred-selected">etred-selected">erwith vss- 1 sred-selected">et of lred-selected">ed typred-selected">e phasred-selected">e lndicating light (22.5 mm.)with control mcbsoutgoing- 6 sred-selected">et of 250 amp. tp mccb with sprred-selected">eadred-selected">er & red-selected">extred-selected">endred-selected">ed handtred-selected">e( 5 nos. + 1 no. for capacitor panred-selected">el)- 2 sred-selected">et of 100 amp. tp mccb with sprred-selected">eadred-selected">er & red-selected">extred-selected">endred-selected">ed handlred-selected">e 160 main lt panred-selected">el at sub statton- 250 kva (typred-selected">e a-2) lncomred-selected">er- 1 no. 630 amp. tp mdo acb with inbuilt mprrred-selected">elred-selected">easred-selected">e with i ontoff tnai.ating lightmred-selected">etred-selected">ering on lncomred-selected">er - 1 sred-selected">et of digital ammred-selected">etred-selected">erwith ass- i sred-selected">et oldigital volt-mred-selected">elred-selected">erwirh vss- 1 sred-selected">et of lred-selected">ed typred-selected">e phasred-selected">e indicating light (22.5 mm.j with control mcbs outgoing - 5 sred-selected">et of 250 amp. tp mccb with sprred-selected">eadred-selected">er & red-selected">exrred-selected">endred-selected">ed handlred-selected">e- 2 sred-selected">et of 100 amp. tp mccb with sprred-selected">eadred-selected">er & red-selected">extred-selected">endred-selected">ed handlred-selected">e flnstallation oflt distribution boards for lt undred-selected">erground systred-selected">em (typred-selected">e a,b&cj) 161 supply , installation, tred-selected">esting & commissioning of outdoor typred-selected">e fred-selected">ered-selected">edred-selected">er pillar panred-selected">etto bred-selected">e madred-selected">e of 2 mm crca shred-selected">ered-selected">et and covred-selected">ers will bred-selected">e j.6mm crca shred-selected">ered-selected">et dulypowdred-selected">er coatred-selected">ed paint with 300 amps al. busbar. (typred-selected">e-b2)lncomred-selected">er - 250 amp. tp mccb - 1 no.outgoing - 63 amp. tp mccb - 5 nos.lnstallation of lt distribution boards forlt undred-selected">erground systred-selected">em (typred-selected">e-a, b & c) 162 outdoor typred-selected">e fred-selected">ered-selected">edred-selected">er pillar panred-selected">el to bred-selected">e madred-selected">e of 2 mm crca shred-selected">ered-selected">et and covred-selected">ers will bred-selected">e 1.6mm crca shred-selected">ered-selected">et duly powdred-selected">er coatred-selected">ed paint with 300 amps al. busbar. [typred-selected">e-b3] incomred-selected">er - 100 amp. tp mccb - 1 no. outgoing - 63 amp. tp mccb - 4 nos.lnstallation of lt distribution boards for lt qndred-selected">erground systred-selected">em [tvpred-selected">e-a, b & cl 163 lockablred-selected">e distribution boxred-selected">es of sizred-selected">e 450x400mm with bus bar 100 amp. tpn to fred-selected">ered-selected">ed upto 10 housred-selected">es (typred-selected">e c) 164 xlpred-selected">e lt sred-selected">ervicred-selected">e armourred-selected">ed cablred-selected">e for singlred-selected">e phasred-selected">e,2x6 sq. mm.(pvc armourred-selected">ed consumred-selected">er sred-selected">ervicred-selected">e cablred-selected">el 165 xlpred-selected">e lt sred-selected">ervicred-selected">e armourred-selected">ed cablred-selected">e for singlred-selected">e phasred-selected">e,2x10 sq. mm.(pvc armourred-selected">ed consumred-selected">er sred-selected">ervicred-selected">e cablred-selected">ej 166 xlpred-selected">e lt sred-selected">ervicred-selected">e armourred-selected">ed cablred-selected">e for thrred-selected">ered-selected">e phasred-selected">e,4x10 sq. mm.[pvc armourred-selected">ed consumred-selected">er sred-selected">ervicred-selected">e cablred-selected">el 167 xlpred-selected">e lt sred-selected">ervicred-selected">e armourred-selected">ed cablred-selected">e for thrred-selected">ered-selected">e phasred-selected">e,4x1.6 sq. mm.(pvc armourred-selected">ed consumred-selected">er sred-selected">ervicred-selected">e cablred-selected">el 168 xlpred-selected">e lt sred-selected">ervicred-selected">e armourred-selected">ed cablred-selected">e for thrred-selected">ered-selected">e phasred-selected">e,4x25 sq. mm.(pvc armou[red-selected">ed consumred-selected">er sred-selected">ervicred-selected">e cablred-selected">e) 169 pvc pipred-selected">e 32 mm dia 170 pvc pipred-selected">e 50 mm dia 171 red-selected">elred-selected">ectronic kwh mred-selected">etred-selected">er 1px2wwith box. for singlred-selected">e phasred-selected">e consumred-selected">er 172 red-selected">elred-selected">ectronic kwh mred-selected">etred-selected">er 3px4w static mred-selected">etred-selected">erwith box.for thrred-selected">ered-selected">e phasred-selected">e consumred-selected">er 173 carriagred-selected">e , laying of 3.5cx400 sq.mm sizred-selected">e lt xlpred-selected">e insulatred-selected">ed cablred-selected">e undred-selected">erground in hdpred-selected">e pipred-selected">e sizred-selected">e 140 mm dia. 174 carriagred-selected">e, laying of 3.5cx150/240 sq.mm sizred-selected">e lt xlpred-selected">e insulatred-selected">ed cablred-selected">e undred-selected">erground in hdpred-selected">e pipred-selected">e sizred-selected">e 1.20 mm dia. 175 carriagred-selected">e ,laying of 3.5cx70 sq.mm sizred-selected">e lt xlpred-selected">e insulatred-selected">ed cablred-selected">e undred-selected">erground in hdpred-selected">e pipred-selected">e sizred-selected">e 75mm dia. 176 painting of stp incuding paints [2 ltrrred-selected">ed oxidred-selected">e and 2 ltr alluminum paint forred-selected">each polred-selected">e.l 177 grouting of st polred-selected">e 178 cartagred-selected">e , red-selected">erred-selected">ection and dismred-selected">entling chargred-selected">es 22% of matred-selected">erials cost 179 convred-selected">ersion of 11kv ovred-selected">erhred-selected">ead/undred-selected">erground linred-selected">e by 11kv linred-selected">e undred-selected">erground 180 11 kv cablred-selected">e sizred-selected">e 3x185 sq.mm xlpred-selected">e 181 stp 11m-is 410 sp-55 182 g.l pipred-selected">e 4 dia 183 top channred-selected">el 100x50x2240 mm 184 hdpred-selected">e pipred-selected">e 160 mm dia pred-selected">e 80, pn-6 185 sred-selected">ervicred-selected">e clamp o/s 186 clamp for fixing pipred-selected">e to polred-selected">e 187 11 kv cablred-selected">e jointing kit sizred-selected">e 3x185 sq.mm xlpred-selected">e o/d 188 11 kv cablred-selected">e jointing kit sizred-selected">e 3x185 sq.mm xlpred-selected">e s/t 189 red-selected">earthing complred-selected">etred-selected">e. 190 m.s. nut & bolt with washred-selected">er 191 bracing anglred-selected">e 65x65x6x2700 mm with clamp 192 stonred-selected">e pad 193 numbred-selected">er platred-selected">es with clamp 194 dangred-selected">er board & clamp with bolts & nuts 195 stay complred-selected">etred-selected">e 196 g i barbred-selected">ed wirred-selected">e 197 carriagred-selected">e , layrng of 3x185 sq.mm sizred-selected">e 11 kv xlpred-selected">e insulatred-selected">ed cablred-selected">e undred-selected">erground in hdpred-selected">e pipred-selected">e dia 160 mm. 198 painting of stp incuding paints (2 itrrred-selected">ed oxidred-selected">e and z lt. allrn inrm pal,1t forred-selected">each polred-selected">e.) 199 grouting of st polred-selected">e 200 grouting of stay sred-selected">et 201 cartagred-selected">e , red-selected">erred-selected">ection and dismred-selected">entling chargred-selected">es 22% of matred-selected">erials cost 202 convred-selected">ersion of 33kv ovred-selected">erhred-selected">ead/ undred-selected">erground linred-selected">e by 33kv linred-selected">e undred-selected">erground 203 cablred-selected">e al. 3x300 sq.mm. xlpred-selected">e 33 kv 204 stp 11m-is 410 sp-55 205 g.l pipred-selected">e 6 dia 206 m.s.top channred-selected">el 100x50x2240 mm 207 hdpred-selected">e pipred-selected">e 200 mm dia pred-selected">e 80, pn-6 208 sred-selected">ervicred-selected">e clamp o/s 209 clamp for fixing pipred-selected">e to polred-selected">e 210 bracing anglred-selected">e 65x65x6x4300 mm with clamp 211 33 kv cablred-selected">e jointing kit 3x300 sred-selected">e mm outdoor 212 33 kv cablred-selected">e jointing kit 3x300 sred-selected">e mm straight through 213 red-selected">earthing of polred-selected">e by ms red-selected">earthing rod of 2ox25o0 mm & 6 swg red-selected">earthr.ng wirred-selected">e red-selected">etc. 214 m.s. nut & bolt with washred-selected">er 215 numbred-selected">er platred-selected">es with clamp 216 dangred-selected">er board & clamp with bolts & nuts 217 stay complred-selected">etred-selected">e (stay rod 15x1800mm, stay wirred-selected">e 5 kg,, stay clamp, boult & nut rvith grouting 218 danred-selected">er bqard barbred-selected">ed wirred-selected">e includin jumpred-selected">ering 219 carriagred-selected">e , layrng of 3x300 sq.mm sizred-selected">e 33 kv xlpred-selected">e insulatred-selected">ed cablred-selected">e undred-selected">erground in hdpred-selected">e pipred-selected">e dia 200 mm. 220 painting of stp incuding paints (2 itrrred-selected">ed oxidred-selected">e and z lt. allrn inrm pal,1t forred-selected">each polred-selected">e.) 221 grouting of st polred-selected">e 222 grouting of stay sred-selected">et 223 cartagred-selected">e , red-selected">erred-selected">ection and dismred-selected">entling chargred-selected">es 22% of matred-selected">erials cost 224 installation of 250 kva transformred-selected">er on dp for thred-selected">e shifting of 3 no. 250 kva. 9 no.400 kva & 3 no. 630 kva transformred-selected">er 225 stp 11m-is 410 sp-55 226 ms channred-selected">el 100x50x2240 mm 227 sred-selected">ervicred-selected">e clamp forround polred-selected">e 228 m.s. bolt and nuts off sizred-selected">e with washred-selected">er 229 l.t. cablred-selected">e 3.5ox4oo so m 230 ltxlpred-selected">e insulatred-selected">ed,unarmourred-selected">ed aluminium singlc corc cablred-selected">e,1x240sq. mm.sizc 231 lt xlpred-selected">e insulatcd,unarmourred-selected">ed aluminium singlc corred-selected">e cablc,1x400 sq. mm.sizred-selected">e 232 red-selected">earthing of 250 kva t/f with g.i. pip[ 233 red-selected">earthing rod complred-selected">et. 234 1 1 kv d.o. fi]sred-selected">e sred-selected">ets 235 1 1 kv tpmo 236 d.d. wirred-selected">e 70 qs mm 237 250 kva t/f 238 l.t. cubical b0x complred-selected">etred-selected">e 239 l,t. cablred-selected">e 3.50x240 sq mm 240 stay sred-selected">et complred-selected">etred-selected">e, 241 aluminimum lug 70 sqmm 242 aluminimum lug 240 sqmm 243 aluminimum lug 400 sqmm 244 pvc tapred-selected">e 245 t/f bushing connred-selected">ector of coppred-selected">er strip 246 labour , cartagred-selected">e & red-selected">errred-selected">ection chargred-selected">es and dismred-selected">entaling of red-selected">existing t/f 247 dismred-selected">entling and cartagred-selected">e from sitred-selected">e to storred-selected">e chargred-selected">es 7% (othred-selected">er misclred-selected">enous chargred-selected">es)
Tender for supply of kit itred-selected">ems for fiat asr bolstred-selected">er 1 red-selected">eyred-selected">e to drg.no .aaa04042 - 8 nos. 2 mred-selected">etal stop r.hto drg.no.aaa04046 - 4 nos 3 mred-selected">etal stop l.hto drg.no.aaa04047 - 4 nos. 4 anti roll bar brackred-selected">et to drg.no.aaa04049 - 4 nos 5 longitudinal dampred-selected">er brackred-selected">et to drg.no-455040 06 col-1, alt a- 2 nos primred-selected">er only to bred-selected">e coatred-selected">ed as pred-selected">er clausred-selected">e 4 of spred-selected">ecification no.mdts-16 6, rred-selected">ev.02 6 safred-selected">ety stop platred-selected">e to drg no.aaa04055 - 16 nos 7 platred-selected">e90x50x3to spred-selected">ecn.din-red-selected">en1 0025-5-2004 s355j2w+n - 2 nos. 8 brackred-selected">et for duplred-selected">ex chred-selected">eck valvred-selected">e to drg no. aaa04078 - 2 n os. 9 support brackred-selected">et for air spring pipred-selected">e to drg no.aaa04079, alt a - 4 nos. 10brackred-selected">et f or lred-selected">evred-selected">eling valvred-selected">erh to drgno.aaa04181 - 2 nos. 11brackred-selected">et for lred-selected">evred-selected">eling valvred-selected">elh to dr gno.aaa04182 - 2 nos spred-selected">ecial condition : suitablred-selected">e packing to bred-selected">e donred-selected">e to avoid damagred-selected">e durin g transit, unloading and rust prred-selected">evred-selected">ention during storagred-selected">e.. warranty pred-selected">eriod: 30 months af tred-selected">er thred-selected">e datred-selected">e of dred-selected">elivred-selected">ery quantity tolred-selected">erancred-selected">e +/-: 5 %agred-selected">e, itred-selected">em catred-selected">egory : normal, total po valured-selected">e variation pred-selected">ermittred-selected">ed: max 8 lacs
Tender for rred-selected">epair, maintred-selected">enancred-selected">e, and installation of plant/ systred-selected">ems/red-selected">equipmred-selected">ents (vred-selected">ersion 2) - industry unit; dismantling of structurals tanks machinred-selected">erired-selected">es red-selected">equipmred-selected">ents at all lred-selected">evred-selected">els and at red-selected">eithred-selected">er of thred-selected">e plants 25 ton as pred-selected">er scopred-selected">e of work; as pred-selected">er scopred-selected">e of work , rred-selected">epair, maintred-selected">enancred-selected">e, and installation of plant/ systred-selected">ems/red-selected">equipmred-selected">ents (vred-selected">ersion 2) - industry unit; structural fabrication and thred-selected">erred-selected">eaftred-selected">er painting of structurals
at red-selected">eithred-selected">er of thred-selected">e plants 50 ton as pred-selected">er scopred-selected">e of work; as pred-selected">er scopred-selected">e of work , rred-selected">epair, maintred-selected">enancred-selected">e, and installation of plant /systred-selected">em
/red-selected">equipmred-selected">ents (vred-selected">ersion 2) - industry unit; red-selected">erred-selected">ection of structurals red-selected">equipmred-selected">ents at all lred-selected">evred-selected">els and at red-selected">eithred-selected">er of thred-selected">e plants 50 ton as pred-selected">er scopred-selected">e of work; as pred-selected">er scopred-selected">e of work , rred-selected">epair, maintred-selected">enancred-selected">e, and installation of plant/systred-selected">ems/red-selected">equipmred-selected">ents (vred-selected">ersion 2) - industry unit; pipred-selected">e linred-selected">e fabrication modification and rred-selected">eplacred-selected">emred-selected">ent with oldnred-selected">ew pipred-selected">e
upto 380 nb at red-selected">eithred-selected">er of thred-selected">e plants 200 mred-selected">etred-selected">er as pred-selected">er scopred-selected">e of work; as pred-selected">er scopred-selected">e of wo.. , rred-selected">epair, maintred-selected">enancred-selected">e, and installation of plant/ systred-selected">ems/red-selected">equipmred-selected">ents (vred-selected">ersion 2) - industry unit; rubbred-selected">er lining works thred-selected">e rubbred-selected">er lining is to bred-selected">e donred-selected">e by cold vulcanization work and linred-selected">ed with nred-selected">ewrubbred-selected">er shred-selected">ered-selected">et old convred-selected">eyor bred-selected">elt 50 squarred-selected">e mred-selected">etred-selected">er as pred-selected">er s.. , rred-selected">epair, maintred-selected">enancred-selected">e, and installation of plant/ systred-selected">ems/red-selected">equipmred-selected">ents
(vred-selected">ersion 2) - industry unit; supplying providing and fixing of gi roof shred-selected">ered-selected">et work 250 squarred-selected">e mred-selected">etred-selected">er as pred-selected">er scopred-selected">e of work; as pred-selected">er scopred-selected">e of work