List of latest a-c-sheet Tenders in Indian Tenders. Click on any a-c-sheet Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for a-c-sheet Tenders.
Tender for gem bids for supply, instclass="text-red-selected">allclass="text-red-selected">ation, testing, commissioning of class="text-red-selected">apfccum lt mclass="text-red-selected">ain pclass="text-red-selected">anel class="text-red-selected">and street light single pole mcb 5 to 32 class="text-red-selected">a , erection of metclass="text-red-selected">allic pole , street light timer switch with pclass="text-red-selected">anel , supplying class="text-red-selected">and drclass="text-red-selected">awing of wire of size hclass="text-red-selected">aving 3x1.5 sqmm , eclass="text-red-selected">arthing with g.i plclass="text-red-selected">ate 600x600x6 mm , eclass="text-red-selected">arthing with copper plclass="text-red-selected">ate 600x600x6 mm , xlpe class="text-red-selected">armoured cclass="text-red-selected">able 3 core 10 sqmm class="text-red-selected">armoured cclass="text-red-selected">able , xlpe class="text-red-selected">armoured cclass="text-red-selected">able 3.5 core 16 sqmm class="text-red-selected">armoured cclass="text-red-selected">able , xlpe class="text-red-selected">armoured cclass="text-red-selected">able 3.5 core 50 sqmm class="text-red-selected">armoured cclass="text-red-selected">able , 25x5 mm gi strip , sitc of 72 wclass="text-red-selected">att led street light with complete class="text-red-selected">accessories , hot dip gclass="text-red-selected">alvclass="text-red-selected">anised octclass="text-red-selected">agonclass="text-red-selected">al pole 6 metre height with bclass="text-red-selected">ase plclass="text-red-selected">ate welded class="text-red-selected">at bottom , self class="text-red-selected">adhesic pvc type 5 metre , solclass="text-red-selected">ar street light led bclass="text-red-selected">ased consist of white led luminclass="text-red-selected">aire led sum driver rclass="text-red-selected">ating class="text-red-selected">as per configurclass="text-red-selected">ation class="text-red-selected">along with solclass="text-red-selected">ar pv modules class="text-red-selected">and lifepo4 bclass="text-red-selected">attery of cclass="text-red-selected">apclass="text-red-selected">acity hclass="text-red-selected">aving 30 wclass="text-red-selected">att , sitc of totclass="text-red-selected">ally enclosed cubicclass="text-red-selected">al type compclass="text-red-selected">artmentclass="text-red-selected">al floor mounting pclass="text-red-selected">anel boclass="text-red-selected">ard of size 1450mm x 1000mm x 500mm , supply class="text-red-selected">and fitting of glow sign boclass="text-red-selected">ard 15x3 feet size with ms structure support , ip bclass="text-red-selected">ased dome cclass="text-red-selected">amerclass="text-red-selected">a of 4 mp , ip bclass="text-red-selected">ased bullet cclass="text-red-selected">amerclass="text-red-selected">a of 4 mp , 8 chclass="text-red-selected">annel nvr , 43 inch led tv , 6 tb hclass="text-red-selected">arddisk drive , 4 u rclass="text-red-selected">ack , 8 port poe switch with 2 fiber sfp ports , single mediclass="text-red-selected">a converter , 32 hdpe pipe , 4 metre 50 mm diclass="text-red-selected">a gi pipe , 5 mtr 4k hdmi cclass="text-red-selected">able , 20 mm pvcconduit medium clclass="text-red-selected">ass , utp 4 pclass="text-red-selected">air cclass="text-red-selected">at 6 lclass="text-red-selected">an cclass="text-red-selected">able , 2 kvclass="text-red-selected">a online ups with 30 minute bclass="text-red-selected">attery bclass="text-red-selected">ackup with smf bclass="text-red-selected">atteries , supply class="text-red-selected">and erecting of 250 kvclass="text-red-selected">ar class="text-red-selected">apfc pclass="text-red-selected">anel , surge class="text-red-selected">arrestor or surge protection device of type 2 tested for imclass="text-red-selected">ax 100 kclass="text-red-selected">a , lclass="text-red-selected">aying class="text-red-selected">and fixing of one nos pvc insulclass="text-red-selected">ated xlpe cclass="text-red-selected">able size class="text-red-selected">above 185 sqmm class="text-red-selected">and upto 400 sqmm , 3.5 sqmm 400 sqmm class="text-red-selected">aluminium lugs class="text-red-selected">and class="text-red-selected">and brclass="text-red-selected">ass glclass="text-red-selected">and , sitc of class="text-red-selected">astronomicclass="text-red-selected">al class="text-red-selected">automclass="text-red-selected">atic switch , supplying class="text-red-selected">and lclass="text-red-selected">aying of xlpe insulclass="text-red-selected">ated 1.1 kv grclass="text-red-selected">ade 3.5 core 400 sqmm ug cclass="text-red-selected">able , supply class="text-red-selected">and instclass="text-red-selected">allclass="text-red-selected">ation of 125class="text-red-selected">a, 36kclass="text-red-selected">a, pfmccb with thermomclass="text-red-selected">agnetic releclass="text-red-selected">ase. , sitc of 5 to 32 class="text-red-selected">a clclass="text-red-selected">ass c mcb , supply, fitting class="text-red-selected">and fixing of 800class="text-red-selected">a, class="text-red-selected">air circuit breclass="text-red-selected">aker , supplying class="text-red-selected">and fitting crcclass="text-red-selected">a sheet with fclass="text-red-selected">abricclass="text-red-selected">ation of boxes pclass="text-red-selected">anel boclass="text-red-selected">ards class="text-red-selected">as per boq , supplying, instclass="text-red-selected">alling on wclass="text-red-selected">all, testing class="text-red-selected">and commissioning rising mclass="text-red-selected">ains class="text-red-selected">as per boq , supplying class="text-red-selected">and erecting pclass="text-red-selected">anel mounting type digitclass="text-red-selected">al class="text-red-selected">ammeter hclass="text-red-selected">aving three class="text-red-selected">and hclass="text-red-selected">alf digit led displclass="text-red-selected">ay, externclass="text-red-selected">al ct operclass="text-red-selected">ated, cclass="text-red-selected">alibrclass="text-red-selected">ated for suitclass="text-red-selected">able to operclass="text-red-selected">ate on 500v, 0 to 1000class="text-red-selected">a class="text-red-selected">ac supply , supplying class="text-red-selected">and erecting pclass="text-red-selected">anel mounting type digitclass="text-red-selected">al voltmeter hclass="text-red-selected">aving three class="text-red-selected">and hclass="text-red-selected">alf digit led displclass="text-red-selected">ay, cclass="text-red-selected">alibrclass="text-red-selected">ated for 0 to 750v class="text-red-selected">ac suitclass="text-red-selected">able to operclass="text-red-selected">ate on 500v class="text-red-selected">ac supply , supplying class="text-red-selected">and erecting led type indicclass="text-red-selected">ating pilot lclass="text-red-selected">amp with led colours red yellow, green 230, 250v
Tender for mechclass="text-red-selected">anized lclass="text-red-selected">aundry services with supply of bed sheets for class="text-red-selected">all terticlass="text-red-selected">ary cclass="text-red-selected">are class="text-red-selected">and secondclass="text-red-selected">ary cclass="text-red-selected">are fclass="text-red-selected">acilities functioning under dme class="text-red-selected">and tvvp
Tender for gem bids for cleclass="text-red-selected">aring jungle including uprooting of rclass="text-red-selected">ank vegetclass="text-red-selected">ation grclass="text-red-selected">ass brush wood trees class="text-red-selected">and sclass="text-red-selected">aplings of girth up to 30 cm meclass="text-red-selected">asured class="text-red-selected">at class="text-red-selected">a height of 1 m class="text-red-selected">above ground level class="text-red-selected">and removclass="text-red-selected">al of rubbish up to class="text-red-selected">a distclass="text-red-selected">ance of 50 m outside the periphery of the class="text-red-selected">areclass="text-red-selected">a cleclass="text-red-selected">ared. "supplying chemicclass="text-red-selected">al emulsion in seclass="text-red-selected">aled contclass="text-red-selected">ainers including delivery class="text-red-selected">as specified. chlorpyriphos or lindclass="text-red-selected">ane emulsificlass="text-red-selected">able concentrclass="text-red-selected">ate of 20 percent" "diluting class="text-red-selected">and injecting chemicclass="text-red-selected">al emulsion for post constructionclass="text-red-selected">al class="text-red-selected">anti termite treclass="text-red-selected">atment excluding the cost of chemicclass="text-red-selected">al emulsion class="text-red-selected">along externclass="text-red-selected">al wclass="text-red-selected">all where the class="text-red-selected">apron is not provided using chemicclass="text-red-selected">al emulsion class="text-red-selected">at the rclass="text-red-selected">ate 7.5 litres or sqm of the verticclass="text-red-selected">al surfclass="text-red-selected">ace of the substructure to class="text-red-selected">a depth of 300mm including excclass="text-red-selected">avclass="text-red-selected">ation chclass="text-red-selected">annel class="text-red-selected">along the wclass="text-red-selected">all class="text-red-selected">and rodding etc. complete isto with chlorpyriphos or lindclass="text-red-selected">ane e.c. 20 percent with 1 percent concentrclass="text-red-selected">ation" "eclass="text-red-selected">arth work in excclass="text-red-selected">avclass="text-red-selected">ation by mechclass="text-red-selected">anicclass="text-red-selected">al meclass="text-red-selected">ans hydrclass="text-red-selected">aulic excclass="text-red-selected">avclass="text-red-selected">ator or mclass="text-red-selected">anuclass="text-red-selected">al meclass="text-red-selected">ans in foundclass="text-red-selected">ation trenches or drclass="text-red-selected">ains not exceeding 1.5 m in width or 10 sqm on plclass="text-red-selected">an including dressing of sides class="text-red-selected">and rclass="text-red-selected">amming of bottoms lift upto 1.5 m including getting out the excclass="text-red-selected">avclass="text-red-selected">ated soil class="text-red-selected">and disposclass="text-red-selected">al of surplus excclass="text-red-selected">avclass="text-red-selected">ated soil class="text-red-selected">as directed within class="text-red-selected">a leclass="text-red-selected">ad of 50 m class="text-red-selected">all kinds of soil." filling class="text-red-selected">avclass="text-red-selected">ailclass="text-red-selected">able excclass="text-red-selected">avclass="text-red-selected">ated eclass="text-red-selected">arth excluding rock in trenches plinth sides of foundclass="text-red-selected">ations etc. in lclass="text-red-selected">ayers not exceeding 20cm in depth consolidclass="text-red-selected">ating eclass="text-red-selected">ach deposited lclass="text-red-selected">ayer by rclass="text-red-selected">amming class="text-red-selected">and wclass="text-red-selected">atering leclass="text-red-selected">ad up to 50 m class="text-red-selected">and lift upto 1.5 m supplying class="text-red-selected">and filling in plinth with sclass="text-red-selected">and under floors including wclass="text-red-selected">atering rclass="text-red-selected">amming consolidclass="text-red-selected">ating class="text-red-selected">and dressing complete. "providing class="text-red-selected">and lclass="text-red-selected">aying in position cement concrete of specified grclass="text-red-selected">ade excluding the cost of centering class="text-red-selected">and shuttering class="text-red-selected">all work up to plinth level 1 isto 3 isto 6 1 cement 3 coclass="text-red-selected">arse sclass="text-red-selected">and zone iii 6 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size " "providing class="text-red-selected">and lclass="text-red-selected">aying in position specified grclass="text-red-selected">ade of reinforced cement concrete excluding the cost of centering shuttering finishing class="text-red-selected">and reinforcement class="text-red-selected">all work up to plinth level isto 1 isto 1.5 isto 3 1 cement 1.5 coclass="text-red-selected">arse sclass="text-red-selected">and zone iii 3 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size " "reinforced cement concrete work in wclass="text-red-selected">alls class="text-red-selected">any thickness including class="text-red-selected">attclass="text-red-selected">ached pilclass="text-red-selected">asters buttresses plinth roof class="text-red-selected">and string courses fillets columns pillclass="text-red-selected">ars piers class="text-red-selected">abutments posts class="text-red-selected">and struts etc. class="text-red-selected">above plinth level up to floor five level excluding cost of centering shuttering finishing class="text-red-selected">and reinforcement 1 isto 1.5 isto 3 1 cement 1.5 coclass="text-red-selected">arse sclass="text-red-selected">and zone iii 3 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size " brick work with common burnt clclass="text-red-selected">ay f.p.s. non modulclass="text-red-selected">ar bricks of clclass="text-red-selected">ass designclass="text-red-selected">ation 7.5 in foundclass="text-red-selected">ation class="text-red-selected">and plinth in cement mortclass="text-red-selected">ar 1 isto 6 1 cement 6 coclass="text-red-selected">arse sclass="text-red-selected">and brick work with common burnt clclass="text-red-selected">ay f.p.s. non modulclass="text-red-selected">ar bricks of clclass="text-red-selected">ass designclass="text-red-selected">ation 7.5 in superstructure class="text-red-selected">above plinth level up to floor v level in class="text-red-selected">all shclass="text-red-selected">apes class="text-red-selected">and sizes in cement mortclass="text-red-selected">ar 1 isto 6 1 cement 6 coclass="text-red-selected">arse sclass="text-red-selected">and "hclass="text-red-selected">alf brick mclass="text-red-selected">asonry with common burnt clclass="text-red-selected">ay f .p .s. non modulclass="text-red-selected">ar bricks of clclass="text-red-selected">ass designclass="text-red-selected">ation 7.5 in superstructure class="text-red-selected">above plinth level up to floor v level. cement mortclass="text-red-selected">ar 1 isto 4 1 cement 4 coclass="text-red-selected">arse sclass="text-red-selected">and " "centering class="text-red-selected">and shuttering including strutting propping etc. class="text-red-selected">and removclass="text-red-selected">al of form for foundclass="text-red-selected">ations footings bclass="text-red-selected">ases of columns etc. for mclass="text-red-selected">ass concrete" "centering class="text-red-selected">and shuttering including strutting propping etc. class="text-red-selected">and removclass="text-red-selected">al of form for suspended floors roofs lclass="text-red-selected">andings lintclass="text-red-selected">als beclass="text-red-selected">ams bclass="text-red-selected">alconies class="text-red-selected">and class="text-red-selected">access plclass="text-red-selected">atform" "steel reinforcement for r.c.c. work including strclass="text-red-selected">aightening cutting bending plclass="text-red-selected">acing in position class="text-red-selected">and binding class="text-red-selected">all complete upto plinth level thermo mechclass="text-red-selected">anicclass="text-red-selected">ally treclass="text-red-selected">ated bclass="text-red-selected">ars of grclass="text-red-selected">ade fe 500d or more mclass="text-red-selected">ake sclass="text-red-selected">ail or tclass="text-red-selected">atclass="text-red-selected">a or jindclass="text-red-selected">al " "15 mm cement plclass="text-red-selected">aster on the rough side of single or hclass="text-red-selected">alf brick wclass="text-red-selected">all of mix isto 1 isto 6 1 cement isto 6 fine sclass="text-red-selected">and rclass="text-red-selected">ates for externclass="text-red-selected">al plclass="text-red-selected">asticclass="text-red-selected">are for height upto 10m from ground level in less otherwise stclass="text-red-selected">ated cement mclass="text-red-selected">ake nuvoco lclass="text-red-selected">afclass="text-red-selected">arge or ultrclass="text-red-selected">atech or class="text-red-selected">acc or class="text-red-selected">as per direction of eic " "12 mm cement plclass="text-red-selected">aster of mix 1 isto 6 1 cement isto 6 fine sclass="text-red-selected">and rclass="text-red-selected">ates for externclass="text-red-selected">al plclass="text-red-selected">asticclass="text-red-selected">are for height upto 10m from ground level in less otherwise stclass="text-red-selected">ated cement mclass="text-red-selected">ake nuvoco lclass="text-red-selected">afclass="text-red-selected">arge or ultrclass="text-red-selected">atech or class="text-red-selected">acc or class="text-red-selected">as per direction of eic " "6 mm cement plclass="text-red-selected">aster of mix 1 isto 3 1 cement 3 fine sclass="text-red-selected">and rclass="text-red-selected">ates for externclass="text-red-selected">al plclass="text-red-selected">asticclass="text-red-selected">are for height upto 10m from ground level in less otherwise stclass="text-red-selected">ated cement mclass="text-red-selected">ake nuvoco lclass="text-red-selected">afclass="text-red-selected">arge or ultrclass="text-red-selected">atech or class="text-red-selected">acc or class="text-red-selected">as per direction of eic " neclass="text-red-selected">at cement punning. "finishing wclass="text-red-selected">alls with premium class="text-red-selected">acrylic smooth exterior pclass="text-red-selected">aint with silicone class="text-red-selected">additives of required shclass="text-red-selected">ade new work two or more coclass="text-red-selected">ats class="text-red-selected">applied class="text-red-selected">at the rclass="text-red-selected">ate 1.43 ltr or 10 sqm over class="text-red-selected">and including priming coclass="text-red-selected">at of exterior primer class="text-red-selected">applied class="text-red-selected">at the rclass="text-red-selected">ate 2.20 kg or 10 sqm mclass="text-red-selected">ake dulux or burger or class="text-red-selected">asiclass="text-red-selected">an pclass="text-red-selected">aints or class="text-red-selected">as per direction of eic" white wclass="text-red-selected">ashing with lime to give class="text-red-selected">an even shclass="text-red-selected">ade new work three or more coclass="text-red-selected">ats mix with fevicol ddl class="text-red-selected">and robin blue or class="text-red-selected">as per direction of eic "pclass="text-red-selected">ainting with synthetic enclass="text-red-selected">amel pclass="text-red-selected">aint of class="text-red-selected">approved brclass="text-red-selected">and class="text-red-selected">and mclass="text-red-selected">anufclass="text-red-selected">acture of required colour to give class="text-red-selected">an even shclass="text-red-selected">ade two or more coclass="text-red-selected">ats on new work over class="text-red-selected">an under coclass="text-red-selected">at of suitclass="text-red-selected">able shclass="text-red-selected">ade with ordinclass="text-red-selected">ary pclass="text-red-selected">aint of class="text-red-selected">approved brclass="text-red-selected">and class="text-red-selected">and mclass="text-red-selected">anufclass="text-red-selected">acture. preferclass="text-red-selected">able mclass="text-red-selected">ake dulux or burger or class="text-red-selected">asiclass="text-red-selected">an pclass="text-red-selected">aints or class="text-red-selected">as per direction of eic mclass="text-red-selected">ake dulux or burger or class="text-red-selected">asiclass="text-red-selected">an pclass="text-red-selected">aints or class="text-red-selected">as per direction of eic" mclass="text-red-selected">aking plinth protection 50mm thick of cement concrete 1 isto 3 isto 6 1 cement 3 coclass="text-red-selected">arse sclass="text-red-selected">and zone iii 6 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size over 75mm thick bed of dry brick bclass="text-red-selected">allclass="text-red-selected">ast 40 mm nominclass="text-red-selected">al size well rclass="text-red-selected">ammed class="text-red-selected">and consolidclass="text-red-selected">ated class="text-red-selected">and grouted with fine sclass="text-red-selected">and including necessclass="text-red-selected">ary excclass="text-red-selected">avclass="text-red-selected">ation levelling class="text-red-selected">and dressing class="text-red-selected">and finishing the top smooth "providing class="text-red-selected">and fixing class="text-red-selected">angle iron frclass="text-red-selected">ames for doors windows class="text-red-selected">and ventilclass="text-red-selected">ators of mild steel class="text-red-selected">angle sections of size 35x35x5 mm joints mitred class="text-red-selected">and welded by class="text-red-selected">angle iron 35x35x5 mm or 35x 5 mm flclass="text-red-selected">at pieces to the existing t iron frclass="text-red-selected">ame or to the wclass="text-red-selected">all with dclass="text-red-selected">ash fclass="text-red-selected">astener including fixing of necessclass="text-red-selected">ary butt hinges class="text-red-selected">and screws class="text-red-selected">and class="text-red-selected">applying class="text-red-selected">a priming coclass="text-red-selected">at of class="text-red-selected">approved steel primer class="text-red-selected">all complete class="text-red-selected">as per the direction of engineer in chclass="text-red-selected">arge. mclass="text-red-selected">ake sclass="text-red-selected">ail or tclass="text-red-selected">atclass="text-red-selected">a or jindclass="text-red-selected">al " "providing class="text-red-selected">and fixing isi mclass="text-red-selected">arked flush door shutters conforming to is isto 2202 pclass="text-red-selected">art i decorclass="text-red-selected">ative type core of block boclass="text-red-selected">ard construction with frclass="text-red-selected">ame of 1st clclass="text-red-selected">ass hclass="text-red-selected">ard wood class="text-red-selected">and well mclass="text-red-selected">atched teclass="text-red-selected">ak 3 ply veneering with verticclass="text-red-selected">al grclass="text-red-selected">ains or cross bclass="text-red-selected">ands class="text-red-selected">and fclass="text-red-selected">ace veneers on both fclass="text-red-selected">aces of shutters. 30 mm thick including isi mclass="text-red-selected">arked stclass="text-red-selected">ainless steel butt hinges with necessclass="text-red-selected">ary screws" "structurclass="text-red-selected">al steel work in single section fixed with or without connecting plclass="text-red-selected">ate including cutting hoisting fixing in position class="text-red-selected">and class="text-red-selected">applying class="text-red-selected">a priming coclass="text-red-selected">at of class="text-red-selected">approved steel primer class="text-red-selected">all complete. mclass="text-red-selected">ake sclass="text-red-selected">ail or tclass="text-red-selected">atclass="text-red-selected">a or jindclass="text-red-selected">al " 25 mm thick pvc flush door shutters mclass="text-red-selected">ade out of class="text-red-selected">a one piece multi chclass="text-red-selected">amber extruded pvc section of the size of 762 mm into 25 mm or less class="text-red-selected">as per requirement with class="text-red-selected">an class="text-red-selected">averclass="text-red-selected">age wclass="text-red-selected">all thickness of 1 mm plus or minus 0.3 mm . pvc foclass="text-red-selected">am end cclass="text-red-selected">ap of size 23x10 mm class="text-red-selected">are provided on both verticclass="text-red-selected">al edges to ensure the overclass="text-red-selected">all thickness of 25 mm. m.s. tube hclass="text-red-selected">aving dimensions 19 mm into 19 mm class="text-red-selected">and 1.0 mm plus or minus 0.1 mm is inserted class="text-red-selected">along the hinge side of the door. core of the door shutter should be filled with high density polyurethclass="text-red-selected">ane foclass="text-red-selected">am. the top class="text-red-selected">and bottom edges of the shutter class="text-red-selected">are covered with class="text-red-selected">an end cclass="text-red-selected">ap of the size 25 mm into 11 mm. door shutter shclass="text-red-selected">all be reinforced with speciclass="text-red-selected">al polymeric reinforcements class="text-red-selected">as per mclass="text-red-selected">anufclass="text-red-selected">acturer specificclass="text-red-selected">ation class="text-red-selected">and direction of engineer in chclass="text-red-selected">arge to tclass="text-red-selected">ake up necessclass="text-red-selected">ary hclass="text-red-selected">ardwclass="text-red-selected">are class="text-red-selected">and fixtures. stickers indicclass="text-red-selected">ating the locclass="text-red-selected">ations of hclass="text-red-selected">ardwclass="text-red-selected">are will be pclass="text-red-selected">asted class="text-red-selected">at class="text-red-selected">appropriclass="text-red-selected">ate plclass="text-red-selected">aces "providing class="text-red-selected">and fixing isi mclass="text-red-selected">arked oxidised m.s. sliding door bolts with nuts class="text-red-selected">and scrows etc. complete .class="text-red-selected">as per the direction of directions of engineer in chclass="text-red-selected">arge.300x16 mm " "providing class="text-red-selected">and fixing ist quclass="text-red-selected">ality cerclass="text-red-selected">amic glclass="text-red-selected">azed wclass="text-red-selected">all tiles conforming to is 15622 thickness to be specified by the mclass="text-red-selected">anufclass="text-red-selected">acturer of class="text-red-selected">approved mclass="text-red-selected">ake somclass="text-red-selected">any or kclass="text-red-selected">ajclass="text-red-selected">ariclass="text-red-selected">a or nitco in class="text-red-selected">all colours shclass="text-red-selected">ades except burgundy bottle green blclass="text-red-selected">ack of class="text-red-selected">any size class="text-red-selected">as class="text-red-selected">approved by engineer in chclass="text-red-selected">arge in skirting risers of steps class="text-red-selected">and dclass="text-red-selected">ados over 12 mm thick bed of cement mortclass="text-red-selected">ar 1 isto 3 1 cement 3 coclass="text-red-selected">arse sclass="text-red-selected">and class="text-red-selected">and jointing with grey cement slurry class="text-red-selected">at the rclass="text-red-selected">ate 3.3kg per sqm including pointing in white cement mixed with pigment of mclass="text-red-selected">atching shclass="text-red-selected">ade complete. mclass="text-red-selected">ake isto somclass="text-red-selected">any or kclass="text-red-selected">ajclass="text-red-selected">ariclass="text-red-selected">a or nitco or class="text-red-selected">asiclass="text-red-selected">an or class="text-red-selected">as per direction of eic" "providing class="text-red-selected">and lclass="text-red-selected">aying vitrified floor tiles in different sizes thickness to be specified by the mclass="text-red-selected">anufclass="text-red-selected">acturer with wclass="text-red-selected">ater class="text-red-selected">absorption less thclass="text-red-selected">an 0.08percent class="text-red-selected">and conforming to is 15622 of class="text-red-selected">approved mclass="text-red-selected">ake in class="text-red-selected">all colours class="text-red-selected">and shclass="text-red-selected">ades lclass="text-red-selected">aid on 20mm thick cement mortclass="text-red-selected">ar 1 isto 4 1 cement 4 coclass="text-red-selected">arse sclass="text-red-selected">and jointing with grey cement slurry class="text-red-selected">at the rclass="text-red-selected">ate 3.3 kg or sqm including grouting the joints with white cement class="text-red-selected">and mclass="text-red-selected">atching pigments etc. complete. size of tile 600x600 mm mclass="text-red-selected">ake somclass="text-red-selected">any or kclass="text-red-selected">ajclass="text-red-selected">ariclass="text-red-selected">a or nitco or class="text-red-selected">asiclass="text-red-selected">an or class="text-red-selected">as per direction of eic" "providing class="text-red-selected">and fixing wclass="text-red-selected">ater closet squclass="text-red-selected">atting pclass="text-red-selected">an indiclass="text-red-selected">an type w.c.pclass="text-red-selected">an with 100 mm sclass="text-red-selected">and cclass="text-red-selected">ast iron p or s trclass="text-red-selected">ap 10 litre low level white p.v.c. flushing cistern including flush pipe with mclass="text-red-selected">anuclass="text-red-selected">ally controlled device hclass="text-red-selected">andle lever conforming to is 7231 with class="text-red-selected">all fittings class="text-red-selected">and fixtures complete including cutting class="text-red-selected">and mclass="text-red-selected">aking good the wclass="text-red-selected">alls class="text-red-selected">and floors wherever required white vitreous chinclass="text-red-selected">a orissclass="text-red-selected">a pclass="text-red-selected">attern w.c. pclass="text-red-selected">an of size 580x440 mm with integrclass="text-red-selected">al type foot rests preferclass="text-red-selected">able mclass="text-red-selected">ake hindwclass="text-red-selected">are or pclass="text-red-selected">arrywclass="text-red-selected">air or hindustclass="text-red-selected">an or cerclass="text-red-selected">a or direction of eic" "providing class="text-red-selected">and fixing white vitreous chinclass="text-red-selected">a flclass="text-red-selected">at bclass="text-red-selected">ack or wclass="text-red-selected">all corner type lipped front urinclass="text-red-selected">al bclass="text-red-selected">asin of 430x260x350 mm class="text-red-selected">and 340x410x265 mm sizes respectively with class="text-red-selected">automclass="text-red-selected">atic flushing cistern with stclass="text-red-selected">andclass="text-red-selected">ard flush pipe class="text-red-selected">and c.p. brclass="text-red-selected">ass spreclass="text-red-selected">aders with brclass="text-red-selected">ass unions class="text-red-selected">and g.i clclass="text-red-selected">amps complete including pclass="text-red-selected">ainting of fittings class="text-red-selected">and brclass="text-red-selected">ackets cutting class="text-red-selected">and mclass="text-red-selected">aking good the wclass="text-red-selected">alls class="text-red-selected">and floors wherever required one urinclass="text-red-selected">al bclass="text-red-selected">asin with 5 litre white p.v.c. class="text-red-selected">automclass="text-red-selected">atic flushing cistern preferclass="text-red-selected">able mclass="text-red-selected">ake hindwclass="text-red-selected">are or pclass="text-red-selected">arrywclass="text-red-selected">air or hindustclass="text-red-selected">an or cerclass="text-red-selected">a or direction of eic" "providing class="text-red-selected">and fixing wclass="text-red-selected">ash bclass="text-red-selected">asin with c.i. brclass="text-red-selected">ackets 15 mm c.p. brclass="text-red-selected">ass pillclass="text-red-selected">ar tclass="text-red-selected">aps 32 mm c.p. brclass="text-red-selected">ass wclass="text-red-selected">aste of stclass="text-red-selected">andclass="text-red-selected">ard pclass="text-red-selected">attern including pclass="text-red-selected">ainting of fittings class="text-red-selected">and brclass="text-red-selected">ackets cutting class="text-red-selected">and mclass="text-red-selected">aking good the wclass="text-red-selected">alls wherever require isto white vitreous chinclass="text-red-selected">a wclass="text-red-selected">ash bclass="text-red-selected">asin size 630x450 mm with class="text-red-selected">a single 15 mm c.p. brclass="text-red-selected">ass pillclass="text-red-selected">ar tclass="text-red-selected">ap" "providing class="text-red-selected">and fixing p.v.c. wclass="text-red-selected">aste pipe for sink or wclass="text-red-selected">ash bclass="text-red-selected">asin including p.v.c. wclass="text-red-selected">aste fittings complete. semi rigid pipe 32 mm diclass="text-red-selected">a" providing class="text-red-selected">and fixing 600x450 mm beveled edge mirror of superior glclass="text-red-selected">ass of class="text-red-selected">approved quclass="text-red-selected">ality complete with 6 mm thick hclass="text-red-selected">ard boclass="text-red-selected">ard ground fixed to wooden cleclass="text-red-selected">ats with c.p . brclass="text-red-selected">ass screws class="text-red-selected">and wclass="text-red-selected">ashers complete. "providing class="text-red-selected">and fixing brclass="text-red-selected">ass bib cock of class="text-red-selected">approved quclass="text-red-selected">ality 15 mm nominclass="text-red-selected">al bore" "providing class="text-red-selected">and fixing brclass="text-red-selected">ass stop cock of class="text-red-selected">approved quclass="text-red-selected">ality 15 mm nominclass="text-red-selected">al bore" providing class="text-red-selected">and fixing circulclass="text-red-selected">ar or hexclass="text-red-selected">agonclass="text-red-selected">al cclass="text-red-selected">ast iron or m.s. sheet box for ceiling fclass="text-red-selected">an clclass="text-red-selected">amp of internclass="text-red-selected">al diclass="text-red-selected">a 140 mm 73 mm height top lid of 1.5 mm thick m.s. sheet with its top surfclass="text-red-selected">ace hclass="text-red-selected">acked for proper bonding top lid shclass="text-red-selected">all be screwed into the cclass="text-red-selected">ast iron or m.s. sheet box by meclass="text-red-selected">ans of 3.3 mm diclass="text-red-selected">a round heclass="text-red-selected">aded screws one lock class="text-red-selected">at the corners. clclass="text-red-selected">amp shclass="text-red-selected">all be mclass="text-red-selected">ade of 12 mm diclass="text-red-selected">a m.s. bclass="text-red-selected">ar bent to shclass="text-red-selected">ape class="text-red-selected">as per stclass="text-red-selected">andclass="text-red-selected">ard drclass="text-red-selected">awing. providing class="text-red-selected">and fixing isi mclass="text-red-selected">arked oxidised m. s hclass="text-red-selected">andles conforming to is 4992 with necessclass="text-red-selected">ary screws etc. complete 125 mm providing class="text-red-selected">and fixing bright finished brclass="text-red-selected">ass hclass="text-red-selected">anging type floor door stopper with necessclass="text-red-selected">ary screws etc. complete. providing class="text-red-selected">and fixing is 12817 mclass="text-red-selected">arked stclass="text-red-selected">ainless steel butt hinges heclass="text-red-selected">avy weight with stclass="text-red-selected">ainless steel screws etc. complete 100x60x2.50 mm "providing class="text-red-selected">and fixing g.i. pipes complete with g.i. fittings including trenching class="text-red-selected">and refilling etc. for externclass="text-red-selected">al work class="text-red-selected">a. 15 mm diclass="text-red-selected">a nominclass="text-red-selected">al bore preferclass="text-red-selected">able mclass="text-red-selected">ake tclass="text-red-selected">atclass="text-red-selected">a or jindclass="text-red-selected">al or class="text-red-selected">as per direction of eic" "providing class="text-red-selected">and fixing g.i. pipes complete with g.i. fittings including trenching class="text-red-selected">and refilling etc. for externclass="text-red-selected">al work b. 20 mm diclass="text-red-selected">a nominclass="text-red-selected">al bore preferclass="text-red-selected">able mclass="text-red-selected">ake tclass="text-red-selected">atclass="text-red-selected">a or jindclass="text-red-selected">al or class="text-red-selected">as per direction of eic" providing class="text-red-selected">and fixing g.i. pipes complete with g.i. fittings including trenching class="text-red-selected">and refilling etc. for externclass="text-red-selected">al work d. 50 mm diclass="text-red-selected">a nominclass="text-red-selected">al bore preferclass="text-red-selected">able mclass="text-red-selected">ake tclass="text-red-selected">atclass="text-red-selected">a or jindclass="text-red-selected">al or class="text-red-selected">as per direction of eic "providing class="text-red-selected">and fixing on wclass="text-red-selected">all fclass="text-red-selected">ace unplclass="text-red-selected">asticised rigid pvc rclass="text-red-selected">ain wclass="text-red-selected">ater pipes conforming to is 13592 type class="text-red-selected">a including jointing with seclass="text-red-selected">al ring conforming to is 5382 leclass="text-red-selected">aving 10 mm gclass="text-red-selected">ap for thermclass="text-red-selected">al expclass="text-red-selected">ansion single socketed pipes. 110 mm diclass="text-red-selected">ameter" "providing class="text-red-selected">and fixing gun metclass="text-red-selected">al gclass="text-red-selected">ate vclass="text-red-selected">alve with c.i. wheel of class="text-red-selected">approved quclass="text-red-selected">ality screwed end isto 20 mm nominclass="text-red-selected">al bore" "providing class="text-red-selected">and fixing gun metclass="text-red-selected">al gclass="text-red-selected">ate vclass="text-red-selected">alve with c.i. wheel of class="text-red-selected">approved quclass="text-red-selected">ality screwed end isto 50 mm nominclass="text-red-selected">al bore" providing class="text-red-selected">and plclass="text-red-selected">acing on terrclass="text-red-selected">ace class="text-red-selected">at class="text-red-selected">all floor levels polyethylene wclass="text-red-selected">ater storclass="text-red-selected">age tclass="text-red-selected">ank is isto 12701 mclass="text-red-selected">arked with cover class="text-red-selected">and suitclass="text-red-selected">able locking class="text-red-selected">arrclass="text-red-selected">angement class="text-red-selected">and mclass="text-red-selected">aking necessclass="text-red-selected">ary holes for inlet outlet class="text-red-selected">and overflow pipes but without fittings class="text-red-selected">and the bclass="text-red-selected">ase support for tclass="text-red-selected">ank. providing class="text-red-selected">and fixing 100 mm sclass="text-red-selected">and cclass="text-red-selected">ast iron grclass="text-red-selected">ating for gully trclass="text-red-selected">ap constructing brick mclass="text-red-selected">asonry chclass="text-red-selected">amber for underground c.i. inspection chclass="text-red-selected">amber class="text-red-selected">and bends with bricks in cement mortclass="text-red-selected">ar 1 isto 4 1 cement 4 coclass="text-red-selected">arse sclass="text-red-selected">and c.i. cover with frclass="text-red-selected">ame light duty 455x610 mm internclass="text-red-selected">al dimensions totclass="text-red-selected">al weight of cover with frclass="text-red-selected">ame to be not less thclass="text-red-selected">an 38 kg weight of cover 23 kg class="text-red-selected">and weight of frclass="text-red-selected">ame 15 kg r.c.c. top slclass="text-red-selected">ab with 1 isto 1.5 isto 3 mix 1 cement 1.5 fine sclass="text-red-selected">and isto 3 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size foundclass="text-red-selected">ation concrete 1 isto 5 isto 10 1 cement 5 fine sclass="text-red-selected">and 10 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 40 mm nominclass="text-red-selected">al size inside plclass="text-red-selected">astering 12 mm thick with cement mortclass="text-red-selected">ar 1 isto 3 1 cement isto 3 coclass="text-red-selected">arse sclass="text-red-selected">and finished smooth with class="text-red-selected">a floclass="text-red-selected">ating coclass="text-red-selected">at of neclass="text-red-selected">at cement on wclass="text-red-selected">alls class="text-red-selected">and bed concrete etc. complete class="text-red-selected">as per stclass="text-red-selected">andclass="text-red-selected">ard design inside dimensions 600x 850 mm class="text-red-selected">and 45 cm deep for pipe line with three or more inlets isto with common burnt clclass="text-red-selected">ay f.p.s. non modulclass="text-red-selected">ar bricks of clclass="text-red-selected">ass designclass="text-red-selected">ation 7.5 "constructing mclass="text-red-selected">asonry chclass="text-red-selected">amber 30x30x50 cm inside in brick work in cement mortclass="text-red-selected">ar 1 isto 4 1 cement isto 4 coclass="text-red-selected">arse sclass="text-red-selected">and for stop cock with c. i. surfclass="text-red-selected">ace box 100x100 x75 mm inside with hinged cover fixed in cement concrete slclass="text-red-selected">ab 1 isto 2 isto 4 mix 1 cement isto 2 coclass="text-red-selected">arse sclass="text-red-selected">and isto 4 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size i or c necessclass="text-red-selected">ary excclass="text-red-selected">avclass="text-red-selected">ation foundclass="text-red-selected">ation concrete 1 isto 5 isto 10 1 cement isto 5 fine sclass="text-red-selected">and isto 10 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 40mm nominclass="text-red-selected">al size class="text-red-selected">and inside plclass="text-red-selected">astering with cement mortclass="text-red-selected">ar 1 isto 3 1 cement isto 3 coclass="text-red-selected">arse sclass="text-red-selected">and 12mm thick finished with class="text-red-selected">a floclass="text-red-selected">ating coclass="text-red-selected">at of neclass="text-red-selected">at cement complete class="text-red-selected">as per stclass="text-red-selected">andclass="text-red-selected">ard design isto with common burnt clclass="text-red-selected">ay f.p.s. non modulclass="text-red-selected">ar bricks of clclass="text-red-selected">ass designclass="text-red-selected">ation 7.5" providing class="text-red-selected">and lclass="text-red-selected">aying in position cement concrete of specified grclass="text-red-selected">ade excluding the cost of centering class="text-red-selected">and shuttering class="text-red-selected">all work up to plinth level isto 1 isto 1.5 isto 3 1 cement isto 1 coclass="text-red-selected">arse sclass="text-red-selected">and zone iii 3 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate 20 mm nominclass="text-red-selected">al size mclass="text-red-selected">aking soclass="text-red-selected">ak pit 2.5 m diclass="text-red-selected">ameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shclass="text-red-selected">aft with bricks class="text-red-selected">and s.w. drclass="text-red-selected">ain pipe 100 mm diclass="text-red-selected">ameter 1.8 m long complete class="text-red-selected">as per stclass="text-red-selected">andclass="text-red-selected">ard design. with common burnt clclass="text-red-selected">ay f.p.s. non modulclass="text-red-selected">ar bricks of clclass="text-red-selected">ass designclass="text-red-selected">ation 7.5 "cement concrete flooring 1 isto 2 isto 4 1 cement isto 2 coclass="text-red-selected">arse sclass="text-red-selected">and isto 4 grclass="text-red-selected">aded stone class="text-red-selected">aggregclass="text-red-selected">ate finished with class="text-red-selected">a floclass="text-red-selected">ating coclass="text-red-selected">at of neclass="text-red-selected">at cement including cement slurry but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominclass="text-red-selected">al size stone class="text-red-selected">aggregclass="text-red-selected">ate" "providing class="text-red-selected">and fixing precoclass="text-red-selected">ated gclass="text-red-selected">alvclass="text-red-selected">anised steel sheet roofing class="text-red-selected">accessories 0.50 mm plus 0.05 percent totclass="text-red-selected">al coclass="text-red-selected">ated thickness zinccoclass="text-red-selected">ating 120 grclass="text-red-selected">ams per sqm class="text-red-selected">as per is 277 in 240 mpclass="text-red-selected">a steel grclass="text-red-selected">ade 5 to 7 microns epoxy primer on both side of the sheetclass="text-red-selected">and polyester top coclass="text-red-selected">at 15 to 18 microns using self drilling or self tclass="text-red-selected">apping screws complete ridges plclass="text-red-selected">ain 500 to 600mm " "providing class="text-red-selected">and fixing precoclass="text-red-selected">ated gclass="text-red-selected">alvclass="text-red-selected">anised iron profile sheets size shclass="text-red-selected">ape class="text-red-selected">and pitch of corrugclass="text-red-selected">ation class="text-red-selected">as class="text-red-selected">approved by engineer in chclass="text-red-selected">arge 0.50 mm plus 0.05 percent totclass="text-red-selected">al coclass="text-red-selected">ated thickness with zinccoclass="text-red-selected">ating 120 grclass="text-red-selected">ams per sqm class="text-red-selected">as per is 277 in 240 mpclass="text-red-selected">a steel grclass="text-red-selected">ade 5 to 7 microns epoxy primer on both side of the sheetclass="text-red-selected">and polyester top coclass="text-red-selected">at 15 to 18 microns. sheet should hclass="text-red-selected">ave protective guclass="text-red-selected">ard film of 25 microns minimum to class="text-red-selected">avoid scrclass="text-red-selected">atches during trclass="text-red-selected">ansportclass="text-red-selected">ation class="text-red-selected">and should be supplied in single length upto 12 metre or class="text-red-selected">as desired by engineerin chclass="text-red-selected">arge. the sheet shclass="text-red-selected">all be fixed using self drilling or self tclass="text-red-selected">apping screws of size 5.5 x 55 mm with epdm seclass="text-red-selected">al complete upto class="text-red-selected">any pitch in horizontclass="text-red-selected">al or verticclass="text-red-selected">al or curved surfclass="text-red-selected">aces excluding the cost of purlins rclass="text-red-selected">afters class="text-red-selected">and trusses class="text-red-selected">and including cutting to size class="text-red-selected">and shclass="text-red-selected">ape wherever required." providing class="text-red-selected">and fixing of glclass="text-red-selected">ass pclass="text-red-selected">anes with putty class="text-red-selected">and glclass="text-red-selected">azing clips in steel doors class="text-red-selected">and windows class="text-red-selected">all complete with 4mm thick glclass="text-red-selected">ass pclass="text-red-selected">anes etc. complete. supply of led tube light fittings .mclass="text-red-selected">ake c.g. or philips fixing of led tube light fittings including supply of class="text-red-selected">all hclass="text-red-selected">ardwclass="text-red-selected">ares class="text-red-selected">as required. led fitting will be supplied by contrclass="text-red-selected">actor. mclass="text-red-selected">ake c.g. or philips supply of 48 sweep ceiling fclass="text-red-selected">an complete with down rod.clclass="text-red-selected">amp cclass="text-red-selected">anopy etc. fixing of 48 sweep ceiling fclass="text-red-selected">an complete with down rod.clclass="text-red-selected">amp cclass="text-red-selected">anopy etc.fclass="text-red-selected">an hclass="text-red-selected">ardwclass="text-red-selected">ares required for fixing for i.e. nut bolts clclass="text-red-selected">amp screws etc wiil be supplied by contrclass="text-red-selected">actor. supply class="text-red-selected">and fixing of stepped type electronic fclass="text-red-selected">an regulclass="text-red-selected">ator on existing switch boclass="text-red-selected">ard. wiring for light point fclass="text-red-selected">an point exhclass="text-red-selected">aust fclass="text-red-selected">an point with 1.5 sqmm frls pvc insulclass="text-red-selected">ated copper conductor single core cclass="text-red-selected">able in consield with modulclass="text-red-selected">ar switch modulclass="text-red-selected">ar plclass="text-red-selected">ate suitclass="text-red-selected">able gi box class="text-red-selected">and eclass="text-red-selected">arthing the point with 1.5 sqmm frls pvc insulclass="text-red-selected">ated copper conductor cclass="text-red-selected">able class="text-red-selected">as required. supply of frls pvc insulclass="text-red-selected">ated copper conducter single core cclass="text-red-selected">able of size 6 sqmm. mclass="text-red-selected">ake hclass="text-red-selected">avells or kei or polycclass="text-red-selected">ab or nclass="text-red-selected">ationclass="text-red-selected">al wiring for circuit or submclass="text-red-selected">ain wiring class="text-red-selected">along with eclass="text-red-selected">arth wire with the following sizes of frls pvc insulclass="text-red-selected">ated copper conductor single core cclass="text-red-selected">able in consield or recessed medium clclass="text-red-selected">ass pvcconduit in concield class="text-red-selected">as required 2 x 6 sqmm plus 1 x 6 sqmm eclass="text-red-selected">arth wire. class="text-red-selected">all the three colours should be red blue class="text-red-selected">and green supply class="text-red-selected">and fixing of utility db p or s 20class="text-red-selected">a dp metclass="text-red-selected">al plug class="text-red-selected">and socket distribution boclass="text-red-selected">ard grey mclass="text-red-selected">ake class="text-red-selected">anchor or hclass="text-red-selected">avells supply class="text-red-selected">and instclass="text-red-selected">allclass="text-red-selected">ation of three phclass="text-red-selected">ase industriclass="text-red-selected">al box with 32 class="text-red-selected">amp 4 pole mcb class="text-red-selected">and 5 pin top plug. mclass="text-red-selected">ake neptune or reputed mclass="text-red-selected">ake supply of frls pvc insulclass="text-red-selected">ated copper conducter single core cclass="text-red-selected">able of size 10 sqmm. mclass="text-red-selected">ake hclass="text-red-selected">avells or kei or polycclass="text-red-selected">ab or nclass="text-red-selected">ationclass="text-red-selected">al wiring for circuit or submclass="text-red-selected">ain wiring class="text-red-selected">along with eclass="text-red-selected">arth wire with the following sizes of frls pvc insulclass="text-red-selected">ated copper conductor single core cclass="text-red-selected">able in surfclass="text-red-selected">ace or recessed medium clclass="text-red-selected">ass pvcconduit in concield class="text-red-selected">as required 4 x 10 sqmm + 1 x 10 sqmm eclass="text-red-selected">arth wire.class="text-red-selected">all the five colours should be red blue yellow blclass="text-red-selected">ack class="text-red-selected">and green prepclass="text-red-selected">arclass="text-red-selected">ation of eclass="text-red-selected">arth pit with supply of class="text-red-selected">all mclass="text-red-selected">atericlass="text-red-selected">als including 3m long 3.64mm thick perforted gi tube with sclass="text-red-selected">alt class="text-red-selected">and chclass="text-red-selected">arcol in class="text-red-selected">alternclass="text-red-selected">ate lclass="text-red-selected">ayer class="text-red-selected">and brick chclass="text-red-selected">amber class="text-red-selected">at the top with chequered plclass="text-red-selected">ate 6mm thick class="text-red-selected">as per is 3043 with lclass="text-red-selected">atest. supply class="text-red-selected">and lclass="text-red-selected">aying 25mm x 5 mm gi strip class="text-red-selected">at 0.5 meter below ground or wclass="text-red-selected">all including connection with electrode with db. supply of class="text-red-selected">all hclass="text-red-selected">ardwclass="text-red-selected">are class="text-red-selected">are in scope of contrclass="text-red-selected">actor supply class="text-red-selected">ans fixing of surfclass="text-red-selected">ace mounting verticclass="text-red-selected">al type 415 volts tpn mcb distribution boclass="text-red-selected">ard of sheet steel dust proctected duly power coclass="text-red-selected">ated pclass="text-red-selected">ainted inclusive 200 class="text-red-selected">amp tinned copper bus bclass="text-red-selected">ar common neutrclass="text-red-selected">al link eclass="text-red-selected">arth bclass="text-red-selected">ar din bclass="text-red-selected">ar for mounting mcb with provision of 100 class="text-red-selected">amp tpn mccb class="text-red-selected">as incomer interconnection between incomer mccb class="text-red-selected">and busbclass="text-red-selected">ar. supply class="text-red-selected">and fixing of 5 to 32 class="text-red-selected">amp rclass="text-red-selected">ating 240 or 415 volt mcb suitclass="text-red-selected">able class="text-red-selected">as per loclass="text-red-selected">ad. supply class="text-red-selected">and fixing of four pole 100 class="text-red-selected">amp rclass="text-red-selected">ating 415 volt 16 kclass="text-red-selected">a mccb . lclass="text-red-selected">aying of 1.1kv grclass="text-red-selected">ade pvcclass="text-red-selected">al.cclass="text-red-selected">able of size 2 or 3 or 3.5 or 4c 2.5 or 6 or 10 or 16 or 25 or 35 sq.mm in underground trench of 760mm deepx760mm wide in single tier formclass="text-red-selected">ation including trench excclass="text-red-selected">avclass="text-red-selected">ation class="text-red-selected">and bclass="text-red-selected">ack filling with bricks 15brick or m class="text-red-selected">and sclass="text-red-selected">and protection route mclass="text-red-selected">arker. roclass="text-red-selected">ad or concreete or bolder cutting class="text-red-selected">and finishing the roclass="text-red-selected">ad to its originclass="text-red-selected">al shclass="text-red-selected">ape class="text-red-selected">are in the scope of the contrclass="text-red-selected">actor. supply class="text-red-selected">and fixing of street light on wclass="text-red-selected">all including supply of class="text-red-selected">all necessclass="text-red-selected">aryu hclass="text-red-selected">ardwclass="text-red-selected">are for fixing of fitting on wclass="text-red-selected">all. supply class="text-red-selected">and fixing of bulk heclass="text-red-selected">ad fitting on wclass="text-red-selected">all including supply of class="text-red-selected">all necessclass="text-red-selected">aryu hclass="text-red-selected">ardwclass="text-red-selected">are for fixing of fitting on wclass="text-red-selected">all. supply instclass="text-red-selected">allclass="text-red-selected">ation class="text-red-selected">and commissioning of exhclass="text-red-selected">aust fclass="text-red-selected">an of size 300 mm diclass="text-red-selected">a. this includes cutting of wclass="text-red-selected">all class="text-red-selected">and finishing class="text-red-selected">and supply of hclass="text-red-selected">ardwclass="text-red-selected">are like nut bolts etc. mclass="text-red-selected">ake crompton