Latest and live tenders published in bangladesh. Click on any tender to view further details.
toll collection for 1 one) year from the vehicles plying over the tailardip bridge at 23rd k.m. of patiy-anowara-banshkhali-toitong road under dohazari road division during the year 2012-2013 and 2013-2014 13th call).
procurement of experiment setup for dynamic and static load tests on large diameter bored piles.
mwbr /03/trd/2013-14/ 02)/w1 construction of 2 nos pc girder 1×31.198m & 25.11m) bridges with slope protection & construction of 4 nos r.c.c box culvert 4×5.00m×4.00m) at different km of mirzapur-warshi-balia road z-5061) under tangail road division during the year 2013-14
mwbr /03/trd/2013-14/ 02)/w2 construction of road embankment, flexible pavement, surfacing work carpeting & seal coat), sign signal & km post, road marking at 4th p) km of 6th p) km of mirzapur-warshi-balia road z-5061) under tangail road division during the year 2013-14.
construction of 1 no rcc box-culvert 2.00m span 3.00m height) at ch. 105+000 km zero point) of barabari-lalmonirhat-burimari road n-509) under road division, lalmonirhat during the year 2013-2014.
soil mapping by sub-soil investigation.
repair & seal coat work at 1st p), 2nd p), 3rd p),4th p), 5th p),6th p), 7th p) & 8th p) km of nalka-sirajgonj road, under road division sirajgonj during the year 2013-2014
construction of saucer drain & protective work at 352nd km of dhaka mirpur)-utholi-paturia-natakhola-kashinathpur-bogra-rangpur-beldangha rangpur-saidpur) road under road division rangpur during the year 2013-14.
repairing & painting the barbed wire fencing, s.s pipe & k-block repairing at 1st km p) to 6th km p) left side) of banani-tongi-joydebpur road under dhaka road division during the year 2013-2014.
repair, carpetin & seal coat work at 24th km p) & 25th km p) of joydebpurp-ulukhola-debgram-bhulta-narayangonj bazar-madanpur dhaka by pass) road under dhaka road division during the year 2013-2014.