Latest and live tenders published in bangladesh. Click on any tender to view further details.
construction of wash block at primary and high school in different union under banskhali upazila chattogram.1. boilchari avvoyerkhil govt. primary school. 2. jaliaghata govt.primary school. 3. puichari sultania govt.primary school. 4. banskhali govt. girls high school. 5. chanua kaderia high school.
transportation of electrical materials spc & wooden poles from warehouse & pbs to pbs under rangpur zone breb rangpur.
construction of internal road including car parking at khulna software technology park kuet.
estimate for repair seal coat works at 1st km & 2nd p km of thakurgaon old bus stand-railway station road r 587 under road division thakurgaon during the year 2020-2021.
renovation and extension of conference at office of the executive engineer dphe jamalpur district
installation of 90 nos dtw-75mmx38mm with 1-hp submersible pump 500l water tank and structure at mirsarai upazila in chattogram under arrp project by dphe chattogram.it is to be noted that quoted boring rate should be increased proportionately according to the depth of the well otherwise tenderer would be considered non-responsive without acceptable clarification.
construction of 100 nos. islampur-50 nos. & dewangonj-50 nos. raise of tube-well platform above the flood level & 50 nos.islampur-25 nos. & dewangonj-25 nos. water point installation tw with 6 no. hand pump with raised platform at islampur & dewangonj upazila of jamalpur district under water sanitation and hygiene wash project fy 2020-2021
pmp major-bridge/culvert work for construction of 01 nos p.c girder sadarpur bridge span 44.02m1x42.68m long at 47th km ch 46911.50 of goalando-faridpur-tarail road z 7108 under road division faridpur during the year 2020-2021.
installation of 90 nos dtw-75mmx38mm with 1-hp submersible pump 500l water tank and structure at mirsarai upazila in chattogram under arrp project by dphe chattogram.it is to be noted that quoted boring rate should be increased proportionately according to the depth of the well otherwise tenderer would be considered non-responsive without acceptable clarification.
construcation & dismantling of out let for dredging works of borni baor tungipara gopalgong from km 2.200 to km 4.700 2.500 k m under khulna dredger division bwdb labonchara khulna during the year 2019-20 & 2020-21