You have searched for west-bengal in Awarded Tender Result. Click on any tender to view further details.

3521 Oiling and greasing for sluice gates of different Sluices (Sluice no-1,2,3,4,5 and Berigopalpur) at Bongaon and Berigopalpur at Bidyadhari Drainage sub Division of Bidyadhari Drainage Division during 2020-21
3522 Cutting and removing of grass and jungles etc. from the compound of Banipur Rest Shed along with the different category of works at Bidyadhari Drainage sub Division, Bongaon of Bidyadhari Drainage Division, Dist:-North 24 Parganas during 2020-21
3523 Jungle cutting , Pond cleaning, clearing of internal drain and cleaning of office floor inside Bidyadhari Drainage Division Colony Campus at Barasat, Taki Road, North24 PGS. under Bidyadhari Drainage Division, period from May 2020 to December 2020
3524 Clearing and removing of water hyacinth under Annual Maintenance Contract for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Nagla Khal from ch. 0.00 km. to 6.00 km. Within Block Habra-I & P.S.-Habra ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
3525 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Jassore road jora bridge 30.28 km.to Haldar Para 34.25 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division
3526 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of koral khal from ch. 2.70 km. To 7.70 km. Within Block Habra-I & P.S.-Habra in the dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
3527 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Rautara Bridge 25.63 km Sohai-Swetpur road to near jassore road jora bridge 30.23 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division.
3528 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from outfall to start point (Length 5.015 KM.) of panskhali khal at Block- Barasat-II, P.S.-Sashan under Bidyadhari Drainage Division.
3529 Maintenance and repair to 2(two)nos. ghoges underguard wall infront sluice no. 2 on the R/B of river Ichhamati, Block & P.S.-Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division
3530 Maintenance and repair to 3 vented sluice over Duma Khal near outfalling of river Ichhamati at mouza Angrail in P.S.-Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division.

Get West Bengal Awarded Tender Alert...

655414

Advertisment
Advertisment