You have searched for tamil-nadu in Awarded Tender Result. Click on any tender to view further details.
2561Improvement Works, Construction of Culvert and Retaining Wall Works including upkeeping in Chengam (H) C&M Sub Division Jurisdiction
A) Improvements of Chengam - Kuppanatham road at Km 1/2 - 3/0 including Upkeeping for a period of 60 months (01-CRIDP-19- 20-P-3586)
B) Improvements of Chengam - Kuppanatham road at Km 3/0 - 5/0 including Upkeeping for a period of 60 months (01-CRIDP-19- 20-P-3587)
C) Improvements to Riding quality at Km 0/0 - 2/6 of Pondy - Krishnagiri road to Paliyapattu road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3969 ) D) Improvements to Riding quality at Km 0/0 - 4/8 of Kayampattu Theethandapattu H/C road (via) Valayampattu including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3994) E) Improvements to Riding quality at Km 0/0 - 1/6 & 0/0 - 1/4 of Polur Chengam road to Pudur Chengam road, joint Ammapalayam - Pudupalayam road (Road A) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3995) F) Construction of Retaining wall at Km 0/0 - 0/4 of Polur - Chengam road to Kolanthangal road ( 01-CRIDP-19-20-O-2093) G) Construction of Retaining wall at Km 3/2 & 4/2 - 5/0 of Polur - Chengam road to Pondy Krishnagiri road (via) Chennasamudiram (01-CRIDP-19-20-O-2094) H) Reconstruction of RCC Slab Culvert at Km 140/8 of Pondy Krishnagiri Road (NH 66 Abandoned Stretch) (SH) (01-CRIDP-19-20-S-0169) I) Reconstruction of Pipe Culvert at Km 5/10 of Chengam - Kuppanatham road (01-CRIDP-19-20-O-2063) J) Reconstruction of RCC Slab Culvert at Km 0/2, 1/2, 1/4, 0/2(i) (ii), 0/8, 0/10 of Polur - Chengam road to Pudur - Chengam road joint Ammapalayam Pudupalayam road (Road A) (01-CRIDP-19-20-O-2079) K) Reconstruction of RCC Slab Culvert at Km 0/4, 0/10, 2/6(i), (ii) of Kayampattu Theethandapattu H/C road (via) Valayampattu (01-CRIDP-19-20-O-2085).
TRN :
743005
|
Chennai - Tamil Nadu
Contract Value :
7.06 Crore |Agency Name :
Highway Department
2564SUPPLY, ERECTION AND COMMISSIONING OF 60 M.T CAPACITY 180° HYDRAULIC ROTATING TYPE TRUCK CUM TROLLEY TIPPLER INCLUDING LAYING OF CIVIL FOUNDATION WORK WITH RAMP ARRANGEMENT FOR THE VEHICLE MOVEMENT
TRN :
705204
|
Tiruvannamalai - Tamil Nadu
Contract Value :
32.69 Lacs |Agency Name :
Tamil Nadu Co-operative Sugar Federation
2565Widening, Strengthening, Improvements, Construction of culvert and retaining wall works including upkeeping in Thandrampet (H) C&M Sub Division Jurisdiction
A) Strengthening of Tiruvannamalai - Arur Road (via) Thanipadi (SH6A) Km 4/2 to join Km 12/2 of Thandarampattu - Kottakulam Road (SH6B) at Km 13/0-13/500 including Reconstruction of Culvert at Km 13/4 (MD1112) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1011)
B) Widening from Single lane to Intermediate lane and Strengthening of Meyyur Vanapuram Road to Agarampallipattu Road (via) Sadakuppam junction road (Road-A) at Km 0/0-2/0 including reconstruction of culvert at Km 0/6, 0/8, 1/2, 1/4, 1/6, 1/8, 1/10 including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3584)
C) Widening from Single lane to Intermediate lane and Strengthening of Meyyur Vanapuram Road to Agarampallipattu road (via) Sadakuppam junction road (Road-B) at Km 2/0-3/2 and 0/0-0/4 including reconstruction of culvert at Km 2/6, 2/8 & 0/2 including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3585) D) Improvements to Riding Quality at Km 0/0-2/8 of Kilvanakkampadi Tharadapattu Road to Se.Agaram Road (via) Kannakandal, Nedungavadi including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3965)
E) Improvements to Riding Quality at Km 0/0-1/4 and 3/6-4/500 of Thandrampet Kottakulam Road to Melkaripur Road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3967)
F) Improvements to Riding Quality at Km 0/0-0/4 of Thandrampet Kottakulam Road to G.Kuppanthangal Krishnapuram junction Road (Road-A) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3966)
G) Construction of Retaining wall at Km 1/8, 1/10 & 2/4 of Mothakkal Road (01-CRIDP-19-20-O-2091)
H) Construction of Retaining wall at Km 1/2, 1/4 & 1/6 of Melpachar Road branching at Km 2/2 of Mothakkal Road (01-CRIDP-19-20-O-2092)
I) Reconstruction of Culverts at Km 0/2, 4/4 of Thandrampet Kottakulam Road to Melkaripur Road (01-CRIDP-19-20-O-2087)
TRN :
743002
|
Chennai - Tamil Nadu
Contract Value :
5.95 Crore |Agency Name :
Highway Department
2566Widening, Strengthening, Improvements, including Reconstruction of culvert, Construction of Retaining wall, including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur (H), C&M Subdivision.
Road A, 01-CRIDP-19-20-O-2386-,Widening from Single lane to Intermediate lane and Strengthening of Medicalcollege - Manojipatti road at km 0/0 - 1/6 including reconstruction of culvert at KM 0/2 and 1/2 including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-O-2433-, Improvements of Grand anaicut canal bank road at km 2/8 - 4/0 including construction of Retaining wall at Km 3/10 including upkeeping for a period of 60 months
Road C,01-CRIDP-19-20-O-2434-, Improvements of Grand anaicut canal bank road at km 4/0 - 5/4 including construction of Retaining wall at Km 4/10 including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-O-2450-, Reconstruction of Box culvert at km 1/10 of Marudakudi road including upkeeping for a period of 60 months
TRN :
717401
|
Trichy - Tamil Nadu
Contract Value :
5.20 Crore |Agency Name :
Highway Department
2567COMPREHENSIVE MAINTENANCE OF SEWAGE LINE INCLUDING CLEANING OF MANHOLES AND SEPTIC TANKS ETC., AND REPAIRS TO SEWAGE LINE IN ZONE B AREA AT INS RAJALI
TRN :
703776
|
Arakkonam - Tamil Nadu
Contract Value :
18.90 Lacs |Agency Name :
Military Engineer Services
2568Improvements and Improvements to Riding Quality, Reconstruction of Culverts including up keeping for a period of 60 months in Govt. Roads in respect of Thirumayam (H), C&M Subdivision.
Road A, 01-CRIDP-19-20-M-1223, Improvements of Ponnamaravathy - Venthanpatti - Thirukalambur road at km 0/0 - 2/4 including Reconstruction of culvert at Km 0/6 (MD1196) including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-M-1224, Improvements of Ponnamaravathy - Venthanpatti - Thirukalambur road at km 2/4 - 4/8 including Reconstruction of culvert at km 3/4 (MD1196) including upkeeping for a period of 60 months
Road C, 01-CRIDP-19-20-O-2352, Improvements of Varpet - Urathupatti road at km 0/0 - 2/0 including Reconstruction of culvert at km 0/2 including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-I-4366, Improvements to Riding Quality at km 2/0 - 4/0 and 6/0 - 7/6 of Virachilai road to Panayapatti rangiyum road via neikonam, Kannanur HC road including upkeeping for a period of 60 months
Road E, 01-CRIDP-19-20-I-4362, Improvements to Riding Quality at km 0/0 - 2/0 and 5/0 - 6/0 of Alavayal - Maravamadurai road including upkeeping for a period of 60 months
Road F, 01-CRIDP-19-20-I-4365, Improvements to Riding Quality at km 0/0 - 3/04 of Km 1/8 of Ponnamaravathy - Ulagampatti road to Aranipatti, Anjukulipatti rod including upkeeping for a period of 60 months
.
TRN :
744743
|
Trichy - Tamil Nadu
Contract Value :
5.85 Crore |Agency Name :
Highway Department
2569Widening, Strengthening, Improvements, Construction of Culvert, Retaining wall and CC Pavement works including upkeeping in Polur (H) C&M Sub Division Jurisdiction
A)Widening from Double Lane to Three Lane and Strengthening in Sanipoondi Kilpennathur Avalurpet Chetpet road KM 40/3 - 41/4 including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0166)
B) Widening from Double Lane to Three Lane and Strengthening in Sanipoondi Kilpennathur Avalurpet Chetpet road KM 41/4 - 42/4 including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0167)
C) Providing CC Pavement in Kelur Athuvambadi road at KM 2/4 - 3/2 (01-CRIDP-19-20-O-2061)
D) Improvements to Riding surface at KM 2/0-3/2 of Cuddalore-Chitoor road of KM 153/6 to Illupakkunam Road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3977)
E) Improvements to Riding surface at KM 0/0-3/0 of Kalambur- Santhavasal Road to Illupakkunam Road including Upkeeping for a period of 60 months (01-CRIDP-19-20-O-3978)
F) Improvements to Riding surface at KM 2/0 - 2/4, 3/2 - 4/4 of Kelur Athuvambadi road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3980)
G) Improvements to Riding surface at Km 8/0 - 12/0 of Devikapuram Mansurabath road (via) Athurai including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3981)
H) Reconstruction of Culvert at Km 2/6 of Cuddalore Chittoor road to Illupakunam road (01-CRIDP-19-20-O-2069)
I) Reconstruction of Culvert at Km 0/2, 1/2, 2/2 of Kalambur Sandavasal road to Illupakunam road (01-CRIDP-19-20-O-2070)
J) Reconstruction of Culvert at Km 4/2(I), (II) of Kelur Athuvambadi road (01-CRIDP-19-20-O-2071)
K) Reconstruction of Culvert at Km 8/2 of Devigapuram Mansurabath road (via) Athurai (01-CRIDP-19-20-O-2072)".
TRN :
743011
|
Chennai - Tamil Nadu
Contract Value :
5.31 Crore |Agency Name :
Highway Department
2570COMPREHENSIVE MAINTENANCE OF SEWAGE LINE INCLUDING CLEANING OF MANHOLES, FILTER BED AND SEPTIC TANKS ETC. AND REPAIRS TO SEWAGE LINE IN ZONE A AND C AREA AT INS RAJALI ARAKKONAM
TRN :
679297
|
Chennai - Tamil Nadu
Contract Value :
18.86 Lacs |Agency Name :
Military Engineer Services