3292Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 91)
The Following works are involved in this package
1.Special Repairs to Km 0/0-1/8 of Chittalandur - Jedarpalayam Road.
2.Special Repairs to Km0/0-2/0 of Koodacheri-Vasanthapuram-Nadanthai road
3.Special Repairs to Km 0/0-4/0 of Pandamangalam-Vengarai road
4.Special Repairs to Km 2/0-4/0 of Idumpankulam-Panangkadu road"
TRN :
718791
|
Salem - Tamil Nadu
Contract Value :
1.60 Crore |Agency Name :
Highway Department
3293Improvements, Construction of drain including footpath in Chennai City Roads (H) C&M Sub Division Jurisdiction
A) Improvements to Riding Quality at km 3/2 - 3/8 (LS&RS) & service road at km 3/8 - 4/2 of GNT Road (SHU87) (01-CRIDP-19-20-I-3778)
B) Construction of Drain at km 8/0 - 8/3 (RS) of GST Road including footpath (01-CRIDP-19-20-S-0042)
C) Construction of Drain at km 8/6 -8/9 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0065)
D) Construction of Drain at km 8/3 -8/6 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0066)
E) Construction of Protective wall & Providing paver block to the Vyasarapadi under pass at Km.4/4 of GNT Road (SHU87) (01-CRIDP-19-20-S-0049)"
TRN :
705028
|
Chennai - Tamil Nadu
Contract Value :
5.83 Crore |Agency Name :
Highway Department
3294Widening, Strengthening, Improvements and Improvements to Riding Quality to Government Roads including CC Pavements, Reconstruction of Box culvert and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C&M Sub Division (Package-43)
The Following works are involved in this package
1. Improvements of Namakkal - Kananur road at km 6/0 - 7/0 (SH 161) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0424)
2. Improvements of Kolli Hills ghat road at km 17/0 - 19/0 including cc pavements and construction of parapet in km 16/0-19/0(MD 181) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1334)
3. Improvements to Riding Quality at km 2/0 - 3/0 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4584)
4. Construction of Retaining wall at km 2/2 of Km 9/6 of Namakkal-Thuraiyur road to Km 2/4 of Thoosur-Valayapatti road (via) Palapatti. (01-CRIDP-19-20-0-2685)
5. Reconstruction of Box culvert at km 2/2 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including construction of retaining wall. (01-CRIDP-19-20-O-2652)
6. Strengthening of Pottireddipatti to Kollimalai Bottom (via) Kajakombai elemendary school road at km 0/0 - 3/4 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2650)
7. Construction of Retaining wall at km 0/4-1/2 of Ramanatha puram pudur road. (01-CRIDP-19-20-O-2687)
8. Widening from Single lane to Intermediate lane and Improvements of Muthugapatti road at km 0/700 - 1/300, Improvements at km 0/0 - 0/700 including upkeeping for a period of 60 months. (01-CRIDP-19-20-0-2646)
9. Construction of Drain at km 2/8 - 5/450 of Periyakovilur - Vellarikadu road (via) Asakkadu. (01-CRIDP-19-20-P-3679)"
TRN :
718803
|
Salem - Tamil Nadu
Contract Value :
6.83 Crore |Agency Name :
Highway Department
3295PACKAGE–37, Widening, Strengthening, Improvements, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Pattukkottai (H), C&M Subdivision.
Road A, 01-CRIDP-19-20-O-2425-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 4/0-6/0 including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-O-2426-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 6/0-7/0 including construction of Retaining wall at Km 6/2,6/4 including upkeeping for a period of 60 months
Road C, 01-CRIDP-19-20-O-2397-,Widening from Single lane to Intermediate lane and Strengthening of Nattusalai-Thuvaranguruchi road at km 0/0-2/0 including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-O-2440-, Improvements of Vadiyakkadu-Kalyanaodai road at km 4/0-7/4 including upkeeping for a period of 60 months
Road E, 01-CRIDP-19-20-O-2441-, Improvements of Kumbakonam - Mannarkudy - Adirampattinam road KM 50/4 to Thirumakkottai road at km0/0 -2/0 including upkeeping for a period of 60 months
"
TRN :
676804
|
Trichy - Tamil Nadu
Contract Value :
6.24 Crore |Agency Name :
Highway Department
3296Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36)
The Following works are involved in this package
1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320
2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534
3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538
4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616
5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669
6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN :
720201
|
Salem - Tamil Nadu
Contract Value :
6.04 Crore |Agency Name :
Highway Department
3297Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including
Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction
A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939)
B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum
Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934)
C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
TRN :
705037
|
Chennai - Tamil Nadu
Contract Value :
5.09 Crore |Agency Name :
Highway Department
3298Widening, Improvements and Improvements to Riding Quality to Government Roads including Providing Bus Lay Bye, Construction and Reconstruction of Pipe culvert,Construction of Retaining wall and well Protective wall and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package48)
The Following works are involved in this package
1.Widening from Two lane to Three lane and Improvements of Tiruchengode - Ariyanur Road at Km 9/0-10/6, including Reconstruction of Pipe culvert at Km 9/8 and providing bus lay bye at Km22/6 (2 Nos) (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0413
2.Widening from single lane to Intermediate lane and Improvements of Ramapuram Road at Km 0/0-3/0 including Construction of pipe culvert at Km 1/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2644
3.Widening from single lane to Intermediate lane and Improvements of Ramapuram Road at Km 3/0-4/700 including Construction of pipe culvert at Km 4/2, Providing bus lay bye at Km4/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2645
4.Construction of Retaining wall at Km0/8, 2/4 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2681
5.Construction of Retaining wall at Km2/6, 2/8 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2682
6.Construction of Retaining wall at Km2/10 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2683
7. Improvements to Riding Quality at km 5/4-6/2 of Tiruchengode - Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4555
8.Improvements to Riding Quality at km 12/0-13/0 of Konganapuram - Vaikuntham - Kalipatti Road (MD 843) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4564
9.Improvements to Riding Quality at Km 2/0-4/6 of Sakkaramplayam - Periyamanali - Elur Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4580
10.Improvements to Riding Quality at km 1/8-3/0 of Mavureddipatti - Kokkalai Road (Using Plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4581
11.Improvements to Riding Quality at km 3/0-4/8 of Mavureddipatti - Kokkalai Road (Using Plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4582
12.Construction well protecting wall at Km 5/8 of Pullagoundampatti - Serukalai Road 01-CRIDP-19-20-O-2663
13.Construction well protecting wall at Km 10/2 of Ramapuram Road 01-CRIDP-19-20-O-2661
14.Construction well protecting wall at Km 8/2 of Sengunthar kalaikalluri Vattur palayakariyampalayam Road 01-CRIDP-19-20-O-2662
15.Construction well protecting wall at Km 0/6 of Mavureddipatti-Kokkalai road 01-CRIDP-19-20-O-2666"
TRN :
718807
|
Salem - Tamil Nadu
Contract Value :
6.64 Crore |Agency Name :
Highway Department
3299Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including
Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction
A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939)
B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum
Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934)
C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
TRN :
676887
|
Chennai - Tamil Nadu
Contract Value :
5.09 Crore |Agency Name :
Highway Department
3300Special Repairs to Government Roads in Tiruchengodu (H) C&M Sub Division (Package 90)
The Following works are involved in this package
1. Special Repairs to Km 0/2-0/4, 7/5-7/8 of Tiruchengode - Ariyanur Road (SH 86A)
2. Special Repairs to Km 6/4-7/2 of Marungapuri-Beemarapatti-Suriya goundampalayam Road
3. Special Repairs to Km2/0-3/4 of Kailasampalayam-Kanakkampatti-Appiapatti Road
4. Special Repairs to Km1/6-2/0, 4/0-6/0 of Km 14/4 of Tiruchengode-Namakkal road to Velagoundampatti-Maniyanur road (via) Koothampoondi Road
5. Special Repairs to Km6/6-7/6 of Suriyagoundampalayam-Paruthipalli-Ramapuram Road
6. Special Repairs to Km1/2-1/6 of Km 19/10 of Rasipuram-Tiruchengode Road to Agaram Road"
TRN :
718792
|
Salem - Tamil Nadu
Contract Value :
1.06 Crore |Agency Name :
Highway Department