3086Providing Cantilever Gantry board, Over Head Gantry board and Metal Crash Barrier in Govt. Roads in respect of Trichy (H), C&M Division.
Road A-01-CRIDP-19-20-M-1191 Providing Metal crash barrier at km 8/4,8/6,9/4,10/6, 10/8, 11/2, 11/4, 11/6,11/10 & 12/4 of Siruthaiyur - Sengaraiyur Road (Via) Anbil (MD 1125)
Road B-01-CRIDP-19-20-S-0273 Providing Metal crash barrier at km 33/4 of Musiri - Thuraiyur - Athur road (SH 30)
Road C-01-CRIDP-19-20-O-2328 Providing Metal crash barrier at km 3/4-4/2 of Keerambur - Vengadathanur - Renganathapuram Road
Road D-01-CRIDP-19-20-O-2330 Providing Metal crash barrier at km 1/6, 1/10, 3/2, 3/4 of Govinthapuram - Renganathapuram road
Road E-01-CRIDP-19-20-O-2334 Providing Metal crash barrier at km 3/2, 3/4, 3/8, 3/10 of GST Road Branching at km 290/6 Uttathur (Via) Neikulam Road
Road F-01-CRIDP-19-20-M-1202 Providing Metal crash barrier at km 7/4 & 7/6 of Seeplaputhur - Kattuputhur - Namakkal road
Road G-01-CRIDP-19-20-O-2333 Providing Metal crash barrier at km 5/2, 5/4, 11/2, 11/4, 11/8, 11/10, 12/2 & 12/4 of Nedungur - Neikulam - Peruvalapur Road
Road H-01-CRIDP-19-20-S-0271 Providing and fixing Cantilever Gantry board at Km 17/6, 19/4, 32/6 of Musiri - Thuraiyur - Athur road (SH 30) including Road Furniture.
Road I-01-CRIDP-19-20-S-0272 Providing and fixing Cantilever Gantry board at Km 27/4 of Trichy - Thuraiyur road (SH 62) including Road Furniture.
Road J-01-CRIDP-19-20-S-0278 Providing of Cantilever Gantry board at km 3/2, 3/6, 10/4 of Trichy -Thuraiyur Road (SH62) including Road Furniture.
Road K-01-CRIDP-19-20-M-1209 Providing Cantilever Gantry board at km 0/2, 4/10 of Pullambady -Sirugalappur -Padalur Road (MD380) including Road Furniture.
Road L-01-CRIDP-19-20-M-1026 Providing Cantilever Gantry board at km 23/6 of Pullambady -Sirugalappur -Padalur Road (MD380) including Road Furniture.
Road M-01-CRIDP-19-20-M-1208 Providing Cantilever Gantry board at km 0/2, 9/8 of Mandapam - Peruvalappur (via) Kumulur - Kannakudy Road (MD1126) including Road Furniture.
Road N-01-CRIDP-19-20-M-1210 Providing Cantilever Gantry board at km 6/8, 6/10 of Poovalur -Siruganur -Thiruppattur Road (MD371) including Road Furniture.
Road O-01-CRIDP-19-20-M-1204 Providing Cantilever Gantry board at km 14/4, 14/6, 25/6 of Poovalur -Siruganur -Thiruppattur Road (MD371) including Road Furniture.
Road P-01-CRIDP-19-20-M-1192 Providing Cantilever gantry board at km 33/8, 33/10 of Keelapalur-Pullambady (Via) Thirumalappady Road (MD608) including Road Furniture.
Road Q-01-CRIDP-19-20-M-1205 Providing Cantilever Gantry board at km 4/2 of Samayapuram - Keelakannukulam Road (Via)Manachanallur -Thiruppanjali Road (MD823) including Road Furniture.
Road R-01-CRIDP-19-20-O-2339 Providing Cantilever Gantry board at km 8/2 of Irungalur - Sengenthi Road including Road Furniture.
Road S-01-CRIDP-19-20-O-2338 Providing Cantilever Gantry board at km 0/2, 9/8 of Pullambady - Viduthalaipuram Road (via) Vanthalai, Gudalur, Kanakiliyanallur including Road Furniture.
Road T-01-CRIDP-19-20-O-2337 Providing Cantilever Gantry board at km 0/2, 3/2 of GST Road branching at km 290/6 to Thirupattur Road including Road Furniture.
Road U-01-CRIDP-19-20-M-1200 Providing and Fixing Cantilever Gantry board at km 1/2 & 19/6 of Musiri - T.Pet - Murugur - Eragudy Road (MD-277) Including road Furniture.
Road V-01-CRIDP-19-20-S-0268 Providing and fixing Over Head Gantry board at Km 26/8 of Musiri - Thuraiyur - Athur road (SH 30) including Road Furniture.
Road W-01-CRIDP-19-20-S-0269 Providing and fixing Over Head Gantry board at Km 0/2 of Thuraiyur Byepass road (SH U 170) including Road Furniture.
Road X-01-CRIDP-19-20-S-0270 Providing and fixing Over Head Gantry board at Km 2/4 of Thuraiyur - Perambalur road (SH 142) including Road Furniture.
Road Y-01-CRIDP-19-20-O-0277 Providing and fixing Over Head Gantry board at Km 0/2 of Musiri - Thuraiyur - Athur road including Road Furniture.
Road AA-01-CRIDP-19-20-M-1199 Providing and fixing Over Head Gantry board at Km 0/8(i), (ii), 2/8 of Musiri byepass road (MD 1004) including Road Furniture.
Road AB-01-CRIDP-19-20-M-1201 Providing and fixing Over Head Gantry board at Km 13/8 of Thottiyam - Kattuputhur road(MD 487) including Road Furniture.
"
TRN :
727833
|
Trichy - Tamil Nadu
Contract Value :
3.75 Crore |Agency Name :
Highway Department
3087Widening and Improvements, Improvements to Riding Quality, Providing Centre Median, Providing Bus Lay Byes, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Avinashi (Highways), C&M, Sub Division. Package No.41
A) Widening from Two lane to Three lane and Improvements of Palladam - Avinashi - Puliyampatti road at km 34/0 - 34/875 (SH 166) including upkeeping for a period of 60 months
B) Widening from Two lane to Four lane and Improvements of Palladam - Avinashi - Puliyampatti road at km 40/0 - 40/4 including construction of Retaining walls at km 40/2 & 40/4 and providing centre median at km 40/0 - 40/4 (SH 166) including upkeeping for a period of 60 months
C) Widening from Two lane to Three lane and Improvements of Palladam - Avinashi - Puliyampatti road at km 34/875 - 35/6 including Providing bus lay byes at km 35/2(SH 166) including upkeeping for a period of 60 months
D) Improvements to Riding Quality at km 0/0 - 2/8 of Thandukkaranpalayam - Pasur road including upkeeping for a period of 60 months
E) Improvements to Riding Quality at km 2/8 - 5/6 of Thandukkaranpalayam - Pasur road including upkeeping for a period of 60 months
F) Improvements to Riding Quality at km 5/6 - 9/0 of Thandukkaranpalayam - Pasur road including upkeeping for a period of 60 months
G) Improvements to Riding Quality at km 0/0 - 1/6 of Avinashi - Puliyampatti road to Aalathur road (including extra length of 400.00m at km 1/6)including upkeeping for a period of 60 months
"
TRN :
676769
|
Tirupur - Tamil Nadu
Contract Value :
5.53 Crore |Agency Name :
Highway Department
3088Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31)
The Following works are involved in this package
1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383
2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384
3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378
4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527
5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531
6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN :
720192
|
Salem - Tamil Nadu
Contract Value :
5.77 Crore |Agency Name :
Highway Department
3089Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-25)
The Following works are involved in this package
1. Improvements to Riding Quality at km 0/0 - 4/6 of Katchupalli - Alagappampalayam - Elampillai road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4537)
2.Widening from Single lane to Intermediate lane and Improvements of Kattinaickanpatti - Manikampatti Road at km 0/0 - 2/290 including CD works Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2610)
3.Construction of retaining wall at Km 0/4,0/10,1/2,1/4,1/6 & 2/2 of Kattinaickanpatti - Manikampatti Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2631)
4.Widening from Single lane to Intermediate lane and Improvements of Manikampatty - Avadathur Road at km 0/0 - 1/6 including CD works and
construction of retaining wall Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2611)
5.Improvements to Riding Quality at km 3/0 - 5/8 of Vanavasi- Kuppampatty (via) Sanaraptty road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4540)
6.Construction of Retaining wall at km 4/2 and 4/4 of Malaiyanur Road Includingupkeeping for a period of 60 months (01-CRIDP-19-20-O-2641)
7.Improvements to Riding Quality at km 0/0 - 1/6 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4546)
8.Improvements to Riding Quality at km 1/6 - 3/055 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4547)"
TRN :
719182
|
Salem - Tamil Nadu
Contract Value :
6.21 Crore |Agency Name :
Highway Department
3090Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29)
The Following works are involved in this package
1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525)
2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397)
4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323)
5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624)
6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635)
7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539)
8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637)
9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549)
10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN :
720194
|
Salem - Tamil Nadu
Contract Value :
6.31 Crore |Agency Name :
Highway Department