621 Providing internal electrification work for new Section Office building of Asolamendha Project Renovation Division No. 1,Mul, Tal. Mul, Dist. Chandrapur.
622 Supply installation, Testing and commissioning of 6.6 KV, 3 Ph., 50 Hz, 630 Amp.,25 KA Horizontal Draw out type Vacuum Circuit Breaker Panel for control and protection of Motor /Transformer/Capacitor at Takari Stage-I Pump house.
623 Supply, erection, testing &commissionig of 11/0.433 kV, 200 KVA DTC for Irrigation colony at village Saoli ofAsolamendha Project Renovation Division no. 2, Saoli., Tal-Saoli, Dist-Chandrapur.
624 Cutting and removing of grass and jungles etc. from the compound of Banipur Rest Shed along with the different category of works at Bidyadhari Drainage sub Division, Bongaon of Bidyadhari Drainage Division, Dist:-North 24 Parganas during 2020-21
625 Shifting & Height raising of 33 KV line, 11 KV line and LT line passing over the Padegaon Minor and Aajgaon canal Taluka- Deoli, Dist. Wardha
626 Jungle cutting , Pond cleaning, clearing of internal drain and cleaning of office floor inside Bidyadhari Drainage Division Colony Campus at Barasat, Taki Road, North24 PGS. under Bidyadhari Drainage Division, period from May 2020 to December 2020
627 Annual Operation and Maintenance of 2MVA, 33/6.6kV Switchyard equipments at Haranghat Lift Irrigation Scheme, Tal. Chamorshi, Dist. Chandrapur for the year 2019-20
628 Clearing and removing of water hyacinth under Annual Maintenance Contract for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Nagla Khal from ch. 0.00 km. to 6.00 km. Within Block Habra-I & P.S.-Habra ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
629 Annual Operation and Maintenance of 630KVA, 11/0.440kV Switchyard equipments at Kirimiri Darur Lift Irrigation Scheme, Tal . Gondpimpari, Dist. Chandrapur for the year 2019-20
630 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Jassore road jora bridge 30.28 km.to Haldar Para 34.25 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division