You have searched for highway-department in Awarded Tender Result. Click on any tender to view further details.

741 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 720201 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"
742 Improvements and Improvements to Riding Quality to Government Roads including Construction of Box Culvert, Retaining wall, Drain and Providing Centere Medain and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package52) The Following works are involved in this package 1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 2/4-3/460 (SH22) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0420) 2. Construction of Box culvert at km 22/10 of Tiruchengode- Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1338) 3. Improvements to Riding Quality at km 33/0-34/700 of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH 198). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4560) 4. Providing Center median at km 52/6-53/0 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0431) 5. Improvements to Riding Quality at km 77/4-77/8 of Malliakarai-Rasipuram-Tiruchengode-Erode Road (SH 79). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4558) 6. Improvements to Riding Quality at Km 4/2-6/965 of Kailasampalayam-Appanaickanpalayam- Pappampalayam road. Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4590) 7. Improvements to Riding Quality at Km 15/6-19/6 of Tiruchengode-Komarapalayam road (MD 726). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4568) 8. Improvements to Riding Quality at Km 2/8-3/2 and 6/4-7/2, of Molasi road Including upkeeping for a period of 60 months ( 01-CRIDP-19-20-I-4589) 9. Construction of Drain at km 78/0-78/4 (L/S) of Malliakarai - Rasipuram-Tiruchengode -Erode Road (SH 79) (01-CRIDP-19-20-S-0447) 10. Construction of Drain at km 4/4-4/8 (R/S) of Tiruchengode-Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1355) 11. Construction of Box culvert at km 2/4 of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street (01-CRIDP-19-20-O-2653) 12. Construction of Retaining wall at Km 2/4 (L/S & R/S) of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street (01-CRIDP-19-20-O-2686) 13. Providing Center Median at km 48/8-49/2 & km 50/4 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0437)"
TRN : 718805 |  Salem - Tamil Nadu
Contract Value : 5.17 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including construction of box culvert, retaining wall, drain and providing centere medain and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package52) the following works are involved in this package 1. improvements of komarapalayam-bhavani road (abonded nh 47) at km 2/4-3/460 (sh22) including upkeeping for a period of 60 months (01-cridp-19-20-s-0420) 2. construction of box culvert at km 22/10 of tiruchengode- komarapalayam road (md 726) (01-cridp-19-20-m-1338) 3. improvements to riding quality at km 33/0-34/700 of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-i-4560) 4. providing center median at km 52/6-53/0 of omalur-sankari-tiruchengode-paramathy road (sh 86) (01-cridp-19-20-s-0431) 5. improvements to riding quality at km 77/4-77/8 of malliakarai-rasipuram-tiruchengode-erode road (sh 79). including upkeeping for a period of 60 months (01-cridp-19-20-i-4558) 6. improvements to riding quality at km 4/2-6/965 of kailasampalayam-appanaickanpalayam- pappampalayam road. including upkeeping for a period of 60 months (01-cridp-19-20-i-4590) 7. improvements to riding quality at km 15/6-19/6 of tiruchengode-komarapalayam road (md 726). including upkeeping for a period of 60 months (01-cridp-19-20-i-4568) 8. improvements to riding quality at km 2/8-3/2 and 6/4-7/2, of molasi road including upkeeping for a period of 60 months ( 01-cridp-19-20-i-4589) 9. construction of drain at km 78/0-78/4 (l/s) of malliakarai - rasipuram-tiruchengode -erode road (sh 79) (01-cridp-19-20-s-0447) 10. construction of drain at km 4/4-4/8 (r/s) of tiruchengode-komarapalayam road (md 726) (01-cridp-19-20-m-1355) 11. construction of box culvert at km 2/4 of km 7/4 of sankari - thiruchengode road to vellalapatti road (via) athurampalayam mathakovil adhithiravidar street (01-cridp-19-20-o-2653) 12. construction of retaining wall at km 2/4 (l/s & r/s) of km 7/4 of sankari - thiruchengode road to vellalapatti road (via) athurampalayam mathakovil adhithiravidar street (01-cridp-19-20-o-2686) 13. providing center median at km 48/8-49/2 & km 50/4 of omalur-sankari-tiruchengode-paramathy road (sh 86) (01-cridp-19-20-s-0437)"
743 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Box Culvert, Widening of Pipe Culvert and Construction of Drain and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package50) The Following works are involved in this package 1. Widening from Two lane to Three Lane and Improvements of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road at km 18/7- 19/4. Including Reconstruction of Box culvert in lieu of Cutstone at km 19/4 and widening pipe culvert at km 18/8, 19/2(i), (ii) (SH 198). including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0414) 2. Widening from Two lane to Three Lane and Improvements of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road at km 19/4- 20/0. (SH 198). including upkeeping for a period of 60 months ( 01-CRIDP-19-20-S-0415 ) 3. Widening from Two lane to Three Lane and Improvements of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road at km 20/0- 21/0 Including Widening of pipe culvert at km 20/2 (SH 198). including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0412) 4. Improvements to Riding Quality at km 14/8-16/4 and 16/8-18/0 of Komarapalayam-Pallipalayam-Jedar palayam-Pandamangalam-Velur Road (SH 198) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4559 ) 5. Reconstruction of Boxculvert at km 16/2 of Komarapalayam - Pallipalayam - Jedarpalayam-Pandamangalam-Velur Road (SH 198) (01-CRIDP-19-20-S-0426) 6. Construction of Drain at km 12/0-12/750 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0440)
TRN : 744101 |  Namakkal - Tamil Nadu
Contract Value : 5.49 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of box culvert, widening of pipe culvert and construction of drain and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package50) the following works are involved in this package 1. widening from two lane to three lane and improvements of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road at km 18/7- 19/4. including reconstruction of box culvert in lieu of cutstone at km 19/4 and widening pipe culvert at km 18/8, 19/2(i), (ii) (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-s-0414) 2. widening from two lane to three lane and improvements of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road at km 19/4- 20/0. (sh 198). including upkeeping for a period of 60 months ( 01-cridp-19-20-s-0415 ) 3. widening from two lane to three lane and improvements of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road at km 20/0- 21/0 including widening of pipe culvert at km 20/2 (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-s-0412) 4. improvements to riding quality at km 14/8-16/4 and 16/8-18/0 of komarapalayam-pallipalayam-jedar palayam-pandamangalam-velur road (sh 198) including upkeeping for a period of 60 months (01-cridp-19-20-i-4559 ) 5. reconstruction of boxculvert at km 16/2 of komarapalayam - pallipalayam - jedarpalayam-pandamangalam-velur road (sh 198) (01-cridp-19-20-s-0426) 6. construction of drain at km 12/0-12/750 (l/s & r/s) of sankari- pallipalayam road (sh 79a) (01-cridp-19-20-s-0440)
744 Widening, Strengthening, Improvements and Improvements to Riding Quality to Government Roads including CC Pavements, Reconstruction of Box culvert and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C&M Sub Division (Package-43) The Following works are involved in this package 1. Improvements of Namakkal - Kananur road at km 6/0 - 7/0 (SH 161) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0424) 2. Improvements of Kolli Hills ghat road at km 17/0 - 19/0 including cc pavements and construction of parapet in km 16/0-19/0(MD 181) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1334) 3. Improvements to Riding Quality at km 2/0 - 3/0 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4584) 4. Construction of Retaining wall at km 2/2 of Km 9/6 of Namakkal-Thuraiyur road to Km 2/4 of Thoosur-Valayapatti road (via) Palapatti. (01-CRIDP-19-20-0-2685) 5. Reconstruction of Box culvert at km 2/2 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including construction of retaining wall. (01-CRIDP-19-20-O-2652) 6. Strengthening of Pottireddipatti to Kollimalai Bottom (via) Kajakombai elemendary school road at km 0/0 - 3/4 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2650) 7. Construction of Retaining wall at km 0/4-1/2 of Ramanatha puram pudur road. (01-CRIDP-19-20-O-2687) 8. Widening from Single lane to Intermediate lane and Improvements of Muthugapatti road at km 0/700 - 1/300, Improvements at km 0/0 - 0/700 including upkeeping for a period of 60 months. (01-CRIDP-19-20-0-2646) 9. Construction of Drain at km 2/8 - 5/450 of Periyakovilur - Vellarikadu road (via) Asakkadu. (01-CRIDP-19-20-P-3679)"
TRN : 718803 |  Salem - Tamil Nadu
Contract Value : 6.83 Crore | Agency Name : Highway Department
Tender award for widening, strengthening, improvements and improvements to riding quality to government roads including cc pavements, reconstruction of box culvert and construction of retaining wall and upkeeping for a period of 60 months in senthamangalam (h) c&m sub division (package-43) the following works are involved in this package 1. improvements of namakkal - kananur road at km 6/0 - 7/0 (sh 161) including upkeeping for a period of 60 months (01-cridp-19-20-s-0424) 2. improvements of kolli hills ghat road at km 17/0 - 19/0 including cc pavements and construction of parapet in km 16/0-19/0(md 181) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1334) 3. improvements to riding quality at km 2/0 - 3/0 of pudanchanthai - sendamangalam road to sengaligoun danur road. including upkeeping for a period of 60 months. (01-cridp-19-20-i-4584) 4. construction of retaining wall at km 2/2 of km 9/6 of namakkal-thuraiyur road to km 2/4 of thoosur-valayapatti road (via) palapatti. (01-cridp-19-20-0-2685) 5. reconstruction of box culvert at km 2/2 of pudanchanthai - sendamangalam road to sengaligoun danur road. including construction of retaining wall. (01-cridp-19-20-o-2652) 6. strengthening of pottireddipatti to kollimalai bottom (via) kajakombai elemendary school road at km 0/0 - 3/4 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2650) 7. construction of retaining wall at km 0/4-1/2 of ramanatha puram pudur road. (01-cridp-19-20-o-2687) 8. widening from single lane to intermediate lane and improvements of muthugapatti road at km 0/700 - 1/300, improvements at km 0/0 - 0/700 including upkeeping for a period of 60 months. (01-cridp-19-20-0-2646) 9. construction of drain at km 2/8 - 5/450 of periyakovilur - vellarikadu road (via) asakkadu. (01-cridp-19-20-p-3679)"
745 Widening and Improvements to Government Roads including Construction of CD works, Retaining wall and Providing RCC centre median and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-34) The Following works are involved in this package 1) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/0-2/4, including Construction of Retaining Wall at Km.2/2 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0366) 2) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/4-2/8, including Construction of Retaining Wall at Km.2/6 & 2/8, Widening of Pipe Culvert at Km.2/8 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0367) 3) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/8-3/2, including Construction of Retaining Wall and Widening of Slab culvert at Km.2/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0370) 4) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/2-3/8, including Widening of Slab culvert at Km.3/6 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0368) 5) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/8-4/2, including Construction of Retaining Wall Km.4/2, Reconstruction of Box culvert at Km.3/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0369)"
TRN : 720206 |  Salem - Tamil Nadu
Contract Value : 7.49 Crore | Agency Name : Highway Department
Tender award for widening and improvements to government roads including construction of cd works, retaining wall and providing rcc centre median and up keeping for a period of 60 months in mettur (h) c&m sub division (package-34) the following works are involved in this package 1) widening from three lane to four lane and improvements of thermal power plant road at km.2/0-2/4, including construction of retaining wall at km.2/2 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0366) 2) widening from three lane to four lane and improvements of thermal power plant road at km.2/4-2/8, including construction of retaining wall at km.2/6 & 2/8, widening of pipe culvert at km.2/8 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0367) 3) widening from three lane to four lane and improvements of thermal power plant road at km.2/8-3/2, including construction of retaining wall and widening of slab culvert at km.2/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0370) 4) widening from three lane to four lane and improvements of thermal power plant road at km.3/2-3/8, including widening of slab culvert at km.3/6 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0368) 5) widening from three lane to four lane and improvements of thermal power plant road at km.3/8-4/2, including construction of retaining wall km.4/2, reconstruction of box culvert at km.3/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0369)"
746 Widening, Improvements and Improvements to Riding Quality to Government Roads including Providing Bus Lay Bye, Construction and Reconstruction of Pipe culvert,Construction of Retaining wall and well Protective wall and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package48) The Following works are involved in this package 1.Widening from Two lane to Three lane and Improvements of Tiruchengode - Ariyanur Road at Km 9/0-10/6, including Reconstruction of Pipe culvert at Km 9/8 and providing bus lay bye at Km22/6 (2 Nos) (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0413 2.Widening from single lane to Intermediate lane and Improvements of Ramapuram Road at Km 0/0-3/0 including Construction of pipe culvert at Km 1/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2644 3.Widening from single lane to Intermediate lane and Improvements of Ramapuram Road at Km 3/0-4/700 including Construction of pipe culvert at Km 4/2, Providing bus lay bye at Km4/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2645 4.Construction of Retaining wall at Km0/8, 2/4 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2681 5.Construction of Retaining wall at Km2/6, 2/8 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2682 6.Construction of Retaining wall at Km2/10 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2683 7. Improvements to Riding Quality at km 5/4-6/2 of Tiruchengode - Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4555 8.Improvements to Riding Quality at km 12/0-13/0 of Konganapuram - Vaikuntham - Kalipatti Road (MD 843) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4564 9.Improvements to Riding Quality at Km 2/0-4/6 of Sakkaramplayam - Periyamanali - Elur Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4580 10.Improvements to Riding Quality at km 1/8-3/0 of Mavureddipatti - Kokkalai Road (Using Plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4581 11.Improvements to Riding Quality at km 3/0-4/8 of Mavureddipatti - Kokkalai Road (Using Plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4582 12.Construction well protecting wall at Km 5/8 of Pullagoundampatti - Serukalai Road 01-CRIDP-19-20-O-2663 13.Construction well protecting wall at Km 10/2 of Ramapuram Road 01-CRIDP-19-20-O-2661 14.Construction well protecting wall at Km 8/2 of Sengunthar kalaikalluri Vattur palayakariyampalayam Road 01-CRIDP-19-20-O-2662 15.Construction well protecting wall at Km 0/6 of Mavureddipatti-Kokkalai road 01-CRIDP-19-20-O-2666"
TRN : 718807 |  Salem - Tamil Nadu
Contract Value : 6.64 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including providing bus lay bye, construction and reconstruction of pipe culvert,construction of retaining wall and well protective wall and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package48) the following works are involved in this package 1.widening from two lane to three lane and improvements of tiruchengode - ariyanur road at km 9/0-10/6, including reconstruction of pipe culvert at km 9/8 and providing bus lay bye at km22/6 (2 nos) (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-s-0413 2.widening from single lane to intermediate lane and improvements of ramapuram road at km 0/0-3/0 including construction of pipe culvert at km 1/4 including upkeeping for a period of 60 months 01-cridp-19-20-o-2644 3.widening from single lane to intermediate lane and improvements of ramapuram road at km 3/0-4/700 including construction of pipe culvert at km 4/2, providing bus lay bye at km4/8 including upkeeping for a period of 60 months 01-cridp-19-20-o-2645 4.construction of retaining wall at km0/8, 2/4 of velagoundampatti - elur - puduchatram road 01-cridp-19-20-o-2681 5.construction of retaining wall at km2/6, 2/8 of velagoundampatti - elur - puduchatram road 01-cridp-19-20-o-2682 6.construction of retaining wall at km2/10 of velagoundampatti - elur - puduchatram road 01-cridp-19-20-o-2683 7. improvements to riding quality at km 5/4-6/2 of tiruchengode - ariyanur road (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-i-4555 8.improvements to riding quality at km 12/0-13/0 of konganapuram - vaikuntham - kalipatti road (md 843) including upkeeping for a period of 60 months 01-cridp-19-20-i-4564 9.improvements to riding quality at km 2/0-4/6 of sakkaramplayam - periyamanali - elur road including upkeeping for a period of 60 months 01-cridp-19-20-i-4580 10.improvements to riding quality at km 1/8-3/0 of mavureddipatti - kokkalai road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4581 11.improvements to riding quality at km 3/0-4/8 of mavureddipatti - kokkalai road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4582 12.construction well protecting wall at km 5/8 of pullagoundampatti - serukalai road 01-cridp-19-20-o-2663 13.construction well protecting wall at km 10/2 of ramapuram road 01-cridp-19-20-o-2661 14.construction well protecting wall at km 8/2 of sengunthar kalaikalluri vattur palayakariyampalayam road 01-cridp-19-20-o-2662 15.construction well protecting wall at km 0/6 of mavureddipatti-kokkalai road 01-cridp-19-20-o-2666"
747 PACKAGE–22, Widening, Improvements, Improvements to Riding Quality, Junction Improvements, Reconstruction of culvert, Construction of Retaining wall, including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur & Thiruvaiyaru (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2406-,Widening from Single lane to Intermediate lane and Improvements of Vallam - Kallaperambur road at km 0/0 - 2/0 including reconstruction of culvert at Km 0/4, 0/6, 0/10 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2407-, Widening from Single lane to Intermediate lane and Improvements of Vallam - Kallaperambur road at km 7/0 - 7/6 including reconstruction of culvert at Km 7/4 including upkeeping for a period of 60 months Road C,01-CRIDP-19-20-O-2430-, Widening from Single lane to Intermediate lane and Improvements of Left bank of Vennar -Palliagraharam- Kalancherri road at km 1/4 - 1/6 including Junction improvement at Km 1/6 and Construction of retaining wall at Km 1/6 including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-I-4371-, Improvements to Riding Quality at km 0/900 - 3/0 of Chellappanpettai road including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4374-Improvements to Riding Quality at km 2/0 - 4/0 of Panavelli - Umayavalarcot road including upkeeping for a period of 60 months Road F,01-CRIDP-19-20-I-4375-, Improvements to Riding Quality at km 0/0 - 2/0 of Panavelli - Umayavalarcot road including upkeeping for a period of 60 months Road G, 01-CRIDP-19-20-I-4380-, Improvements to Riding Quality at km 8/0 - 10/0 of Thirukkattupalli - Valappakudy - Thiruvaiyaru Municif Court Road including upkeeping for a period of 60 months Road H, 01-CRIDP-19-20-O-2443-Reconstruction of Pipe Culvert at km 6/4(i),(ii) of Road branching from K.M 3/10 of Vallam - Kallaperambur road to Singaperumalkulam Municipal limit. including upkeeping for a period of 60 months"
TRN : 676853 |  Trichy - Tamil Nadu
Contract Value : 4.90 Crore | Agency Name : Highway Department
Tender award for package–22, widening, improvements, improvements to riding quality, junction improvements, reconstruction of culvert, construction of retaining wall, including up keeping for a period of 60 months in govt. roads in respect of thanjavur & thiruvaiyaru (h), c&m subdivision. road a, 01-cridp-19-20-o-2406-,widening from single lane to intermediate lane and improvements of vallam - kallaperambur road at km 0/0 - 2/0 including reconstruction of culvert at km 0/4, 0/6, 0/10 including upkeeping for a period of 60 months road b, 01-cridp-19-20-o-2407-, widening from single lane to intermediate lane and improvements of vallam - kallaperambur road at km 7/0 - 7/6 including reconstruction of culvert at km 7/4 including upkeeping for a period of 60 months road c,01-cridp-19-20-o-2430-, widening from single lane to intermediate lane and improvements of left bank of vennar -palliagraharam- kalancherri road at km 1/4 - 1/6 including junction improvement at km 1/6 and construction of retaining wall at km 1/6 including upkeeping for a period of 60 months road d, 01-cridp-19-20-i-4371-, improvements to riding quality at km 0/900 - 3/0 of chellappanpettai road including upkeeping for a period of 60 months road e, 01-cridp-19-20-i-4374-improvements to riding quality at km 2/0 - 4/0 of panavelli - umayavalarcot road including upkeeping for a period of 60 months road f,01-cridp-19-20-i-4375-, improvements to riding quality at km 0/0 - 2/0 of panavelli - umayavalarcot road including upkeeping for a period of 60 months road g, 01-cridp-19-20-i-4380-, improvements to riding quality at km 8/0 - 10/0 of thirukkattupalli - valappakudy - thiruvaiyaru municif court road including upkeeping for a period of 60 months road h, 01-cridp-19-20-o-2443-reconstruction of pipe culvert at km 6/4(i),(ii) of road branching from k.m 3/10 of vallam - kallaperambur road to singaperumalkulam municipal limit. including upkeeping for a period of 60 months"
748 Widening, Improvements and Improvements to Riding Quality to Government Roads including Widening of RCC slab culvert, Reconstruction of Box Culvert, Providing Centre Median, Construction of Drain an Well Protective wall and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package47) The Following works are involved in this package 1.Widening from Two lane to Three lane and Improvements of Mallikarai - Rasipuram - Tiruchengode - Erode Road at Km 71/3-72/0 including Construction of Storm water drain at Km 71/3-71/8 (SH 79) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0411 2.Construction of storm water Drain at Km 75/5-76/2 of Mallikarai - Rasipuram - Tiruchengode - Erode Road including Providing footpath at Km 75/5-76/2 (Arthanarieswarar Temple Girivalapathai) (SH79) 01-CRIDP-19-20-S-0443 3.Widening from Intermediate lane to Two lane and Improvements of Vaiyappamalai-Velagoundampatti road at Km 12/0-14/4 including Widening of RCC slab culvert at Km 12/8 and Reconstruction of Box culvert at Km 14/2(MD 857) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1327 4.Improvements of Athumedu-Munjanur-Kallupalayam Road at Km 4/0-5/660 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2648 5.Construction of Retaining wall at Km 4/0-5/0 of Authumedu - Munjanur - Kallupalayam Road 01-CRIDP-19-20-O-2684 6.Improvements to Riding Quality at Km 15/0-16/6 of Tiruchengode-Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4556 7. Improvements to Riding Quality at Km 16/6-17/2 of Tiruchengode-Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4557 8.Improvements to Riding Quality at Km 5/300-7/4 of Mudalaipattipudur-Kalnaickkanur Road (MD 1176) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4567 9.Improvements to Riding Quality at Km 7/4 - 8/2 of Mudalaipattipudur - Kalnaickanur Road (MD 1176) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4569 10.Improvements to Riding Quality at Km 0/0-2/0 of Kailasampalayam-Kanakkampatti-Appiapattti Road (Using plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4579 11.Providing Center Median at Km75.600, 76.000 to 76.400of Malliakarai - Rasipuram -Tiruchengodu - Erode road (SH 79) 01-CRIDP-19-20-S-0435 12.Construction Well protecting wall at Km11/4 of Tiruchengode - Namakkal Road (SH 94) 01-CRIDP-19-20-S-0430 13.Construction Well protecting wall at Km 0/2 of Serukalai cross Road 01-CRIDP-19-20-O-2660 14.Construction Well protecting wall at Km 0/2 of Km 17/4 of Tiruchengode-Namakkal road to Mavureddipatti road 01-CRIDP-19-20-O-2664 15.Construction Well protecting wall at Km 1/10 of Lathuvadi Union Road 01-CRIDP-19-20-O-2665 16.Construction Well protecting wall at Km 2/4 of Unjanai-Pokkampalayam Road 01-CRIDP-19-20-O-2667"
TRN : 718808 |  Salem - Tamil Nadu
Contract Value : 6.70 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including widening of rcc slab culvert, reconstruction of box culvert, providing centre median, construction of drain an well protective wall and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package47) the following works are involved in this package 1.widening from two lane to three lane and improvements of mallikarai - rasipuram - tiruchengode - erode road at km 71/3-72/0 including construction of storm water drain at km 71/3-71/8 (sh 79) including upkeeping for a period of 60 months 01-cridp-19-20-s-0411 2.construction of storm water drain at km 75/5-76/2 of mallikarai - rasipuram - tiruchengode - erode road including providing footpath at km 75/5-76/2 (arthanarieswarar temple girivalapathai) (sh79) 01-cridp-19-20-s-0443 3.widening from intermediate lane to two lane and improvements of vaiyappamalai-velagoundampatti road at km 12/0-14/4 including widening of rcc slab culvert at km 12/8 and reconstruction of box culvert at km 14/2(md 857) including upkeeping for a period of 60 months 01-cridp-19-20-m-1327 4.improvements of athumedu-munjanur-kallupalayam road at km 4/0-5/660 including upkeeping for a period of 60 months 01-cridp-19-20-o-2648 5.construction of retaining wall at km 4/0-5/0 of authumedu - munjanur - kallupalayam road 01-cridp-19-20-o-2684 6.improvements to riding quality at km 15/0-16/6 of tiruchengode-ariyanur road (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-i-4556 7. improvements to riding quality at km 16/6-17/2 of tiruchengode-ariyanur road (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-i-4557 8.improvements to riding quality at km 5/300-7/4 of mudalaipattipudur-kalnaickkanur road (md 1176) including upkeeping for a period of 60 months 01-cridp-19-20-i-4567 9.improvements to riding quality at km 7/4 - 8/2 of mudalaipattipudur - kalnaickanur road (md 1176) including upkeeping for a period of 60 months 01-cridp-19-20-i-4569 10.improvements to riding quality at km 0/0-2/0 of kailasampalayam-kanakkampatti-appiapattti road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4579 11.providing center median at km75.600, 76.000 to 76.400of malliakarai - rasipuram -tiruchengodu - erode road (sh 79) 01-cridp-19-20-s-0435 12.construction well protecting wall at km11/4 of tiruchengode - namakkal road (sh 94) 01-cridp-19-20-s-0430 13.construction well protecting wall at km 0/2 of serukalai cross road 01-cridp-19-20-o-2660 14.construction well protecting wall at km 0/2 of km 17/4 of tiruchengode-namakkal road to mavureddipatti road 01-cridp-19-20-o-2664 15.construction well protecting wall at km 1/10 of lathuvadi union road 01-cridp-19-20-o-2665 16.construction well protecting wall at km 2/4 of unjanai-pokkampalayam road 01-cridp-19-20-o-2667"
749 Special Repairs to Government Roads in Rasipuram (H) C&M Sub Division (Package 89) The Following works are involved in this package 1) Special Repairs to Km 2/0-4/0 of Mangalapuram - Urambu - Udaiyarpalayam Road 2) Special Repairs to Km 3/6-6/510 of R.Pudupatty - Moolapallipatty - Mettala Road 3) Special Repairs to Km 4/2-5/6 of Km 4/2 of Mettala - Mullukuruchi Road to K.Kanavaipatty (via) P.Kanavaipatty Road 4) Special Repairs to Km 0/0-3/4 of Thammampatty Forest Road to Parappansolai Road 5) Special Repairs to Km 1/4-2/4 of Devasthanampudur - Oduvankuruchi Road"
750 Widening, Improvements and Improvements to Riding Quality to Government Roads including Curve widening, widening of slab culvert, construction of Drain and Retaining wall and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-46) The Following works are involved in this package 1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 0/0 - 1/0 including Widening Slab Culvert at Km 0/6 (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1326) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 9/2 - 11/6 including Widening the curve at 10/10, 11/2, Construction of Retaining wall (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1336) 3) Construction of Drain at km 0/2 of Alavaipatti road (01-CRIDP-19-20-O-2679) 4) Improvements of V C C road to Singalantha puram road (via) Patchal. at km 0/0 - 4/0 including Construction of Retaining Wall including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3672) 5) Improvements to Riding Quality at km 9/6 - 10/8 of Mettala-Mullukurichi-Periyakombai road (MD853) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4570)"

Get Highway Department Tender Alert...

441250

Advertisment
Advertisment