You have searched for highway-department in Awarded Tender Result. Click on any tender to view further details.

561 Strengthening and Improvements works including upkeeping in Chengalpattu (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at Km 37/520 - 38/350 of Chennai - Mamallapuram Road (via) Thiruporur (Rajiv Gandhi Salai) including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-3785) B) Strengthening of Vandalore - Mambakkam - Kelambakkam Road at Km 9/451 - 10/800 including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0094) C) Strengthening of Vandalore - Mambakkam - Kelambakkam Road at Km 10/800 - 12/140 including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0095) D) Strengthening of Vandalore - Mambakkam - Kelambakkam Road at Km 12/140 - 13/450 including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0080) E) Improvements to Riding Quality at Km 0/0 - 2/8 & 3/0 - 3/450 of Nellikuppam - Kattur Road (Using Plastic Waste) including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-3820)"
562 Widening, Strengthening, Improvements, Improvements of Riding quality, Minor Bridge & Culvert including upkeeping works for 60 Months in Villupuram (H) C&M Subdivision Jurisdiction (Package 23) A - Widening from Two lane to Three lane and Strengthening of Mundiyampakkam-Pondicherry road at km 0/100-1/0 including reconstruction of pipe culvert at km 0/6 (SH 203) including upkeeping for a period of 60 months B- Widening from Two lane to Three lane and Strengthening of Mundiyampakkam-Pondicherry road at km 2/0-3/0(SH-203) including upkeeping for a period of 60 months C-Reconstruction of minor bridge at km 2/4 of Sithathur-Thirukkai road in lieu of existing damaged brick arch minor bridge including upkeeping for a period of 60 months D-Improvements to riding Quality at km 4/0-7/4 of Ariyalur-Thirukkai-Panamalai road including upkeeping for a period of 60 months E-Improvements to riding Quality at km 1/6-3/4 of Vadakuchipalayam-Kappiyampuliyur road including upkeeping for a period of 60 months"
563 Strengthening, Improvements and Construction of Culvert and Drain works including upkeeping in Kanchipuram (H) C&M Sub Division Jurisdiction A) Strengthening of Kanchipuram - Surappan Road at Km.66/950-68/6 Including upkeeping for a period of 60 months (01 - CRIDP - 19 - 20 - S - 0099) B) Strengthenin of Kanchipuram - Surappan Road at Km.68/8-70/500 Including upkeeping for a period of 60 months (01 - CRIDP - 19 - 20 - S - 0100) C) Construction of Drain at Km 60/8 - 62/0 of Sadras - Chengalpattu - Kanchipuram - Arakkonam - Thiruthani Road (Strom Water Drain) (01 - CRIDP - 19 - 20 - S - 0111) D) Improvements to Riding Quality at Km 66/0-66/940 Sadras - Chengalpattu - Kanchipuram - Arakkonam - Thiruthani Road including upkeeping for a period of 60 months (01 - CRIDP - 19 - 20 - I - 3790) E)Strengthening of Muthiyalpettai Vaiyavur Road at Km 0/0-3/0 Including upkeeping for a period of 60 months (01 - CRIDP - 19 - 20-O- 1925) F)Reconstruction of Box Culvert at km 5/2 of Kancheepuram - Enathur Road to GWT Road (01 - CRIDP - 19 - 20 -O- 1932) .
564 Strengthening and Improvements works including upkeeping in Chengalpattu (H) C&M Sub Division Jurisdiction A) Strengthening of Chennai - Mamallapuram Road (via) Thiruporur (Rajiv Gandhi Salai) at Km 33/0 - 34/130 SH 49A including upkeeping for a period of 60 months (CRIDP-19-20-S-0079) B) Strengthening of Chennai - Mamallapuram Road (via) Thiruporur (Rajiv Gandhi Salai) at Km 34/130 - 35/260 including upkeeping for a period of 60 months (CRIDP-19-20-S-0081) C) Strengthening of Chennai - Mamallapuram Road (via) Thiruporur (Rajiv Gandhi Salai) at Km 35/260 - 36/390 including upkeeping for a period of 60 months (CRIDP-19-20-S-0082) D) Strengthening of Chennai - Mamallapuram Road (via) Thiruporur (Rajiv Gandhi Salai) at Km 36/390 - 37/520 including upkeeping for a period of 60 months (CRIDP-19-20-S-0096) E) Improvements to Riding Quality at Km 10/750 - 12/0 & 17/0 - 17/2 of Medavakkam - Mambakkam - Sembakkam Road including upkeeping for a period of 60 months (CRIDP-19-20-I-3791) "
565 Special repairs to Govt. Roads in respect of Avudaiyarkovil (H) C&M Sub division Road A, Special repairs to Kanur - Thiruppunavasal road to Sethurastha (Via) Arasankarai road at km 0/0 - 2/0 Road B, Special repairs to Kanur - Thiruppunavasal road at km 1/0 - 2/6 Road C, Special Repairs to Manamelkudi - Perumaruthur road at km 5/0 - 7/0
566 Special repairs to Govt. Roads in respect of Avudaiyarkovil (H) C&M Sub division Road A, Special repairs to Okkur - Theeyathur road at km 15/0 - 17/0 Road B, Special repairs to Aranthangi - Mimisal road to Okkur - Theeyathur road (via) Velvarai, Ponpethi, Veelankathur road at km 8/0 - 10/0 Road C, Special Repairs to Kanur - Thiruppunavasal road to Sethurastha (via) Patharakudi road at km 0/0 - 2/0.
567 Special repairs to Govt. Roads in respect of Aranthangi (H) C&M Sub division Road A, Special Repairs to Avanthankottai - Maramadakki Road km 2/0 - 4/0 Road B, Special Repairs to Avanthankottai - Maramadakki Road km 4/020 - 6/0 Road C, Special Repairs to Avanthankottai - Maramadakki Road km 6/020-8/4.
568 Special repairs to Govt. Roads in respect of Thiruthuraipoondi (H) C&M Sub division. Road A Special Repairs to Kalladikollai road at Km.0/0 - 2/0 Road B Special Repairs to Panaiyur village road at Km.0/0 - 2/6 Road C Special Repairs to Gopalasamudram- Voimedu Road KM 4/8 to Vadiyakadu Road Km.0/0-2/0 Road D Special Repairs to Vilakudi - Manali road Km.6/0 - 8/8 Road E Special Repairs to Nedumbalam - Maruthavanam road Km.4/6 - 5/6.
569 Providing Cantilever Gantry board, Over Head Gantry board and Metal Crash Barrier including road Furnitures in Govt. Roads in respect of Tiruvarur (H), C&M Division. Road-1, 01-CRIDP-19-20-S-0314, Providing Over head Gantry Board at km 7/6 and 15/4 of Tiruvarur - Mannargudi - Muthupet road (SH 202) Road-2, 01-CRIDP-19-20-S-0315, Providing over head Gantry Board at Km.34/8,39/2 and 51/8 of Mayiladuthurai - Thiruthuraipoondi Road (SH 23) Road-3, 01-CRIDP-19-20-S-0316, Providing over head Gantry Board at km 22/8 of Nagore - Vettar Road (SH 148) Road-4, 01-CRIDP-19-20-S-0317, Providing Over head Gantry Board at km 8/2 of Thiruvarur - Kudavasal - Kumbakonam road (SH 65) Road-5, 01-CRIDP-19-20-S-0319, Providing Metal crash barrier at km 9/10 of Tiruvarur - Mannargudi - Muthupet road (SH202) Road-6, 01-CRIDP-19-20-S-0320, Providing Metal crash barrier at km 48/8 of Mayiladuthurai - Thiruthuraipoondi Road (SH 23) Road-7, 01-CRIDP-19-20-S-0321, Providing Cantilever Gantry Board at Km.17/2, 40/10 of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road (SH 63) Road-8, 01-CRIDP-19-20-S-0322, Providing Cantilever Gantry Board at km.17/10,23/10 of Tiruvarur - Mannargudi - Muthupet road (SH 202) Road-9, 01-CRIDP-19-20-S-0323, Providing Cantilever Gantry Board at Km.27/10, 35/8 of Kumbakonam - Mannargudy - Adirampattinam road (SH 66) Road-10, 01-CRIDP-19-20-S-0324, Providing Cantilever Grantry Board at km 0/2 of Mannargudi - Sethubhavachattram road (SH 146) Road-11, 01-CRIDP-19-20-S-0325, Providing Metal crash barrier at Km.17/6,17/8,17/10,23/2 and 24/8 of Tiruvarur - Mannargudi - Muthupet road (SH 202) Road-12, 01-CRIDP-19-20-S-0326, Providing Cantilever Gantry Board at Km.39/6 of Nagoor- Nannilam - Nachiyarkoil Road (SH 67) Road-13, 01-CRIDP-19-20-S-0327, Providing Over head Gantry Board at Km.9/4,11/4 and 18/2 of Kumbakonam - Mannargudy - Adirampattinam road (SH 66) Road-14, 01-CRIDP-19-20-S-0328, Providing Cantilever Gantry Board at Km.32/2,32/4 of Nagoor- Nannilam - Nachiyarkoil Road (SH 67) Road-15, 01-CRIDP-19-20-S-0329, Providing Cantilever Gantry Board at Km.25/2,25/10 of Kumbakonam - Karaikal Road(SH 147) Road-16, 01-CRIDP-19-20-S-0330, Providing Metal crash barrier at km 30/2,30/4 of Nagoor- Nannilam - Nachiyarkoil Road (SH 67) Road-17, 01-CRIDP-19-20-S-0331, Providing Cantilever Gantry Board at Km.60/4 and 63/2 of Mayiladuthurai - Thiruthuraipoondi Road (SH23) Road-18, 01-CRIDP-19-20-S-0332, Providing Cantilever Gantry Board at Km. 51/2,52/8, 58/4 and 59/8 of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road (SH 63) Road-19, 01-CRIDP-19-20-S-0333, Providing Over head Gantry Board at Km.60/2 of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road (SH 63) Road-20, 01-CRIDP-19-20-S-0334, Providing Cantilever Gantry Board at Km.53/6 and 67/10 of Nagore - Nagapattinam - Ramanathapuram - Tuticorin Road (SH 200) Road-21, 01-CRIDP-19-20-M-1268, Providing Cantilever Gantry Board at km 7/8 (Left side & Right side)of Koothanallur - Adichapuram- Kandamangalam - Vedapuram - Kalappal- Thiruthuraipoondi road (MD839) Road-22, 01-CRIDP-19-20-M-1269, Providing Cantilever Gantry Board at Km.4/10 of Mannargudi Orathanadu Thiruvonam road (MD248).
TRN : 744740 |  Trichy - Tamil Nadu
Contract Value : 4.79 Crore | Agency Name : Highway Department
Tender award for providing cantilever gantry board, over head gantry board and metal crash barrier including road furnitures in govt. roads in respect of tiruvarur (h), c&m division. road-1, 01-cridp-19-20-s-0314, providing over head gantry board at km 7/6 and 15/4 of tiruvarur - mannargudi - muthupet road (sh 202) road-2, 01-cridp-19-20-s-0315, providing over head gantry board at km.34/8,39/2 and 51/8 of mayiladuthurai - thiruthuraipoondi road (sh 23) road-3, 01-cridp-19-20-s-0316, providing over head gantry board at km 22/8 of nagore - vettar road (sh 148) road-4, 01-cridp-19-20-s-0317, providing over head gantry board at km 8/2 of thiruvarur - kudavasal - kumbakonam road (sh 65) road-5, 01-cridp-19-20-s-0319, providing metal crash barrier at km 9/10 of tiruvarur - mannargudi - muthupet road (sh202) road-6, 01-cridp-19-20-s-0320, providing metal crash barrier at km 48/8 of mayiladuthurai - thiruthuraipoondi road (sh 23) road-7, 01-cridp-19-20-s-0321, providing cantilever gantry board at km.17/2, 40/10 of thanjavur - mannargudy - thiruthuraipoondi - vedaranyam - kodiyakkari road (sh 63) road-8, 01-cridp-19-20-s-0322, providing cantilever gantry board at km.17/10,23/10 of tiruvarur - mannargudi - muthupet road (sh 202) road-9, 01-cridp-19-20-s-0323, providing cantilever gantry board at km.27/10, 35/8 of kumbakonam - mannargudy - adirampattinam road (sh 66) road-10, 01-cridp-19-20-s-0324, providing cantilever grantry board at km 0/2 of mannargudi - sethubhavachattram road (sh 146) road-11, 01-cridp-19-20-s-0325, providing metal crash barrier at km.17/6,17/8,17/10,23/2 and 24/8 of tiruvarur - mannargudi - muthupet road (sh 202) road-12, 01-cridp-19-20-s-0326, providing cantilever gantry board at km.39/6 of nagoor- nannilam - nachiyarkoil road (sh 67) road-13, 01-cridp-19-20-s-0327, providing over head gantry board at km.9/4,11/4 and 18/2 of kumbakonam - mannargudy - adirampattinam road (sh 66) road-14, 01-cridp-19-20-s-0328, providing cantilever gantry board at km.32/2,32/4 of nagoor- nannilam - nachiyarkoil road (sh 67) road-15, 01-cridp-19-20-s-0329, providing cantilever gantry board at km.25/2,25/10 of kumbakonam - karaikal road(sh 147) road-16, 01-cridp-19-20-s-0330, providing metal crash barrier at km 30/2,30/4 of nagoor- nannilam - nachiyarkoil road (sh 67) road-17, 01-cridp-19-20-s-0331, providing cantilever gantry board at km.60/4 and 63/2 of mayiladuthurai - thiruthuraipoondi road (sh23) road-18, 01-cridp-19-20-s-0332, providing cantilever gantry board at km. 51/2,52/8, 58/4 and 59/8 of thanjavur - mannargudy - thiruthuraipoondi - vedaranyam - kodiyakkari road (sh 63) road-19, 01-cridp-19-20-s-0333, providing over head gantry board at km.60/2 of thanjavur - mannargudy - thiruthuraipoondi - vedaranyam - kodiyakkari road (sh 63) road-20, 01-cridp-19-20-s-0334, providing cantilever gantry board at km.53/6 and 67/10 of nagore - nagapattinam - ramanathapuram - tuticorin road (sh 200) road-21, 01-cridp-19-20-m-1268, providing cantilever gantry board at km 7/8 (left side & right side)of koothanallur - adichapuram- kandamangalam - vedapuram - kalappal- thiruthuraipoondi road (md839) road-22, 01-cridp-19-20-m-1269, providing cantilever gantry board at km.4/10 of mannargudi orathanadu thiruvonam road (md248).
570 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Box Culverts, Retaining Wall, and Providing Revetment, Well Protective Wall, Drain and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-21) The Following works are involved in this package 1.Improvements of Sankari - Mecheri road (via) Edappady at km 16/2 - 16/8 (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0374) 2.Improvements to Riding Quality at km 13/8 - 14/6 and 15/4 - 15/6 of Sankari - Mecheri road(via) Edappady (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I- 4520) 3.Construction of Drain at km 13/8 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0388) 4.Construction of Box culvert at km 17/10 of Magudanchavadi - Komarapalayam road (via)Edappady (SH 221) including Upkeeping for a period of 60 months(01-CRIDP-19-20-S- 0385) 5.Widening from Intermediate lane to Two lane and Improvements of Edappady - Nedungulam - Koneripatty-Anandampalayam road at km 8/4 - 9/8 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0360) 6.Improvements of Sankari - Mecheri road (via) Edappady at km 23/2 - 24/2 including widening of curve and providing well protective wall including Upkeeping for a period of 60 months(SH 220) (01-CRIDP-19-20-S- 0376) 7.Providing revetment at km 4/4 of Edappady - Nedungulam-Koneripatty-Anandampalayam road (for high embankment portion) (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0390) 8.Construction of Retaining wall at km 8/10,9/2,9/4,9/6 and 9/8 of Edappady -Nedungulam - Koneripatty-Anandampalayam road including Box culvert at Km 8/8,8/10 and 9/2 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0394) 9.Improvements to Riding Quality at km 32/2 - 33/0 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-I-4528) including Upkeeping for a period of 60 months 10.Construction of Drain at km 18/2 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0396) 11.Raising the dip at km 2/8 of Moolapathai - Irupali road (via) Chittur including Construction of Box culvert. including Upkeeping for a period of 60 months(01-CRIDP-19-20-O-2628) 12.Construction of Drain at km 0/6-1/2 of Koneripatti - Poolampatti Road (via) Thambagoundanoor Road Karattupudur Road (01-CRIDP-19-20-O-2638)
TRN : 671186 |  Salem - Tamil Nadu
Contract Value : 6.07 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction of drain, box culverts, retaining wall, and providing revetment, well protective wall, drain and up keeping for a period of 60 months in edappady (h) c&m sub division (package-21) the following works are involved in this package 1.improvements of sankari - mecheri road (via) edappady at km 16/2 - 16/8 (sh 220) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0374) 2.improvements to riding quality at km 13/8 - 14/6 and 15/4 - 15/6 of sankari - mecheri road(via) edappady (sh 220) including upkeeping for a period of 60 months (01-cridp-19-20-i- 4520) 3.construction of drain at km 13/8 of sankari - mecheri road (via) edappady (sh 220) (01-cridp-19-20-s- 0388) 4.construction of box culvert at km 17/10 of magudanchavadi - komarapalayam road (via)edappady (sh 221) including upkeeping for a period of 60 months(01-cridp-19-20-s- 0385) 5.widening from intermediate lane to two lane and improvements of edappady - nedungulam - koneripatty-anandampalayam road at km 8/4 - 9/8 (sh 220 b) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0360) 6.improvements of sankari - mecheri road (via) edappady at km 23/2 - 24/2 including widening of curve and providing well protective wall including upkeeping for a period of 60 months(sh 220) (01-cridp-19-20-s- 0376) 7.providing revetment at km 4/4 of edappady - nedungulam-koneripatty-anandampalayam road (for high embankment portion) (sh 220 b) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0390) 8.construction of retaining wall at km 8/10,9/2,9/4,9/6 and 9/8 of edappady -nedungulam - koneripatty-anandampalayam road including box culvert at km 8/8,8/10 and 9/2 (sh 220 b) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0394) 9.improvements to riding quality at km 32/2 - 33/0 of sankari - mecheri road (via) edappady (sh 220) (01-cridp-19-20-i-4528) including upkeeping for a period of 60 months 10.construction of drain at km 18/2 of sankari - mecheri road (via) edappady (sh 220) (01-cridp-19-20-s- 0396) 11.raising the dip at km 2/8 of moolapathai - irupali road (via) chittur including construction of box culvert. including upkeeping for a period of 60 months(01-cridp-19-20-o-2628) 12.construction of drain at km 0/6-1/2 of koneripatti - poolampatti road (via) thambagoundanoor road karattupudur road (01-cridp-19-20-o-2638)

Get Highway Department Tender Alert...

403002

Advertisment
Advertisment