Notice Inviting Tender (NIT) by the State Government Of Kerala for Annual Overhauling, Repairs, Maintenance, Reconditioning And Supply Of Spares Circlip Connecting Rod Condactor 9 A Contactor 16 A 4 Pole Digitel Temperature Controller Dtc 0 - 400 C Innershell For Sx-850 Gland Washer Gudgon Pin Love Joy Coupling 075 Metallic Briaded Hose 1 *1.2 Metallic Briaded Hose 1/2*20 Metallic Briaded Hose 3/8*40 Nozzle 2.25 Gph, 45 Deg Plp, Monarch Nozzle 3 Gph, 45 Deg Ho, Monarch Nozzle 5.5 Gph, 45 Deg Ho, Monarch Nozzle 6.5 Gph, 45 Deg Ho, Monarch Nozzle 9.5 Gph, 60 Deg Ho, Monarch Non Return Valve9 Nrv 15 Nb Non Return Valve9 Nrv 20 Nb Oil Filter Simplex 1 Ltr, Assy 1/2 Bsp Oil Level Indicator For Water Pump O L R 0.8 To 1.25 A O L R 2.5 To 4 A Piston For Triplex Pump Plug & Socket For Burner Rod Pressure Gauge 0-10 Pressure Reducing Valve Pully For Water Pump Rtd Assembly, 5 Mt Long Pt-100 Resin Safety Valve - 11/2 Safety Valve - 1 Sequence Controller Ma 810 Sequence Controller Lmo24 Sight Glass Round 50 Mm Odx 5Th 50 Mm Thermic Fluid Timer Electronics On Delay Valve Seat Assembly Appendix-B Overhualing & Reconditioning Of Boilers 400000 Kcal/Hr Thermax Make Thermic Fluid Boiler At Appapura For Appom Preparation. A  Reconditioning Of Thermic Fluid Generator Tp-04 Including Cleaning Of Coil By Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly Like Diffuser Plate, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Coil With New Standard High Quality Gaskets And Packing. B  Cleaning The Diesel Tank, Fuel Line Filters, Strainers, Fuel Pump Valves And Providing Proper Packing To The Valve, Nrv, Strainers And Ensuring Trouble Free Operation. C Thermic Fluid System - Cleaning Of Thermic Fluid Pipeline Falnges And Cleaning And Re-Setting Of Slsv, Nrv, Valves, Etc. Repairing And Re-Conditioning Of Damaged Pipeline Parts And Fittings, Providing Proper Gland Packing For Valves With Fitting Arrangement Etc. And Ensuring Leak Proof Trouble Free Operation Of Thermic Fluid Heater. D  Repair And Reconditioning Of Control Panel Of Boiler Ensuring Perfect And Trouble Free Operation Of All Switch Gears, Control Gears And Parts Like Mcbs, Contactors, Switches, Olrs, Visual And Alarm Monitors, Sequence Controller, Temperature Controller, Photocell, Pressure Switch, Solenoid, Motors, Transformer, Interconnecting Cable Etc. And Keep The System Ready For Smooth Operation. E   Rectification Of Minor Fluid Leaks And Pipelines And Karas. F  Painting Of Boiler Such As Panel Board Etc. G Overhauling Of Thermic Fluid Pump. 850 Kg/Hr Thermax Make Steam Boiler Installed At Aravanapura For Aravana Preparation. A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 850 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. 500 Kg/Hr Thermax Make Steam Boiler Installed At Devaswom Mess For Food Preparation. A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 500 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. 300 Kg/Hr Thermax Make Steam Boiler Installed At Police Mess For Food Preparation. A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 300 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. 500 Kg/Hr Thermax Make Steam Boiler Installed At Police Mess For Food Preparation. A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 500 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. 300 Kg/Hr Thermax Make Steam Boiler Installed At Medicated Drinking Water Plant For Medicated Drinking Water Preparation. A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 300 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. 600 Kg/Hr Thermax Make Steam Boiler Installed At Annadanamandapam For Annadanam Preparation A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 600 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. 200 Kg/Hr Thermax Make Steam Boiler Installed At Medicated Drinking Water Plant For Medicated Drinking Water Preparation. A     Dismantling, Cleaning And Reconditioning Of Steam Boiler 200 Kg/Hr, Cleaning Of Coil Using Suitable Wire Brush And Wiping The Surface With Cotton Waste, Combustion Chamber, Checking Of Top And Bottom Refractory, Blower Assembly, Burner Assembly, Electrode Assembly, Nozzle, Photocell Mountings, Sight Glass Etc. And Reassembling The Unit With High Quality Packings. B     Cleaning The Water Line, Water Tank, Strainers, Valves, Optimizer, Economizer Tube, Chamber And Providing High Quality Gland Packings, Gaskets, Etc. C      Descaling Of Coil And Pipe Line Using 5% - 10% Descaling Chemicals Or Other Type Of Harmless Cleaning Media Of Duration Of 12 Hr And Ensuring The Boiler Water System Of Leak Proof Trouble Free And Smooth Operation During Festival Season. D     Overhauling And Reconditioning Of Feed Water Pump, Fuel Pump And Blower Assembly. E     Cleaning And Reconditioning Of Diesel Day Tank, Fuel And Interconnecting Pipe Line, Steam Lines, Steam Valves, Filters, Strainers, Nrv, Valves And Providing Proper Packing For Leak Proof And Trouble Free Operation, Steam Line, Steam Valve. F     Painting Of Boiler Such As Panel Board Etc. Appendix-C Replacing The Defective Steam And Condnsate Piping Inside The Aravana Preparation Plant, Devaswom Mess, Police Mess, Medicated Drinking Water Etc. Design, Supply, Fabrication And Erection Of Condensate Line And Drain Lines From To Various Cooking Vessels And Distribution Lines Made Of Ms C Class Pipes, 314 Ss Pipes And Steam Globe Valves Including Cutting And Welding Charges. Transportation Charges, Consumables, Necessary Flanges, Bends, Gaskets, Barrel Nipple, Nut And Bolt Etc. Steam Ball Valve, With Ss Ball & Stem, Forged Carbon Steel Body, Ptfe Seat, S/E 40 Nb Steam Ball Valve, With Ss Ball & Stem, Forged Carbon Steel Body, Ptfe Seat, S/E 25 Nb Steam Ball Valve, With Ss Ball & Stem, Forged Carbon Steel Body, Ptfe Seat, S/E 20 Nb 80 Nb Ms C Class Pipe 50 Nb Ms C Class Pipe 40 Nb Ms C Class Pipe 25 Nb Ms C Class Pipe 20 Nb Ms C Class Pipe 15 Nb Ms C Class Pipe Insulation Of Steam Pipelines Using Mineral Wool Covered With Chicken Mesh And Cladded With Aluminum Sheet Of Suitable Thickness For A Total Insulation Thickness Of 50 Mm Note: Measurements Of Above Shall Be Taken Over The Finished Surface Of Covering On All Fitting As Mentioned In 9 Of Is 74131981 And Billed Foraccordingly. Valves And Flanges Shall Be Charged Extra At 2 Times And 1.5 Times Running Meter Rate Respectively.Bend Shall Be Measured From Outer Radius And Will Be Changed Twice Of Running Meter Rate Of Pipe Size And Will Be Extra. For Boilers Installed At Sabarimala Devaswom M M Festivals In 1196Me in Pathaanamthitta - Kerala has been published.
The last date of this tender is 27/10/2020, work value is  0 (Refer Doc) INR, EMD is  49000 INR and tender document fees is  5000 INR
For more details call us on +91 92760 83333 for bidding support this tender, GeM, vendor registration (if any) and tender BOQ documents.

Tender Document

Related Information

Location

Pathaanamthitta - Kerala ( IN )

Ownership

State Government Of Kerala

Sector

Non Diversified

Important Dates

Published on

21 Oct, 2020

Submission Date

26 Oct, 2020

Opening Date

27 Oct, 2020

Key Values

Work Value

Refer Doc

EMD

49.0 Thousand

Document Fee

5.0 Thousand
Tender Document Liaison Service Connect with us