Bidding Support

425064

Bidding Support

Warm Greetings from www.thetenders.com, the fastest growing tender information portal in India.

Technical And General Specification Of Outsourcing Work M Station, Jeel Ali Power Station Title: Dismantling, Servicing, Overhauling, Installation And Pressure Testing Of Lock 20 & 30 Dfo System Plate Type Heat Exchanger. No Of Phe: 04 Nos. Duration: 06-08 Daysf Or More Clarification You May Contact Arvind Prakash- +971553905432 A.#Scope Of Work: ·#Moilize Men/Equipment. ·#Sumit The Followi Ng Documents And Get Ptw Permit To Work And Lc Line Clearance Document From Dewa. O#Method Statement O#Risk Assessment Of The Wo Rk O#Tool Ox Talk Report. ·#Conduct Site Survey And Safety Inspection To Assess The Working Environment. ·#Ensure Area Is Correctly Secured And Safe To Work On In All Respects. ·#Ensure Positive Line Isolation And Proper Depressurizing Of The Lineefore Start Of W Ork. ·#If The Working Environment Safe, Then Proceed With The Following Steps. ·#Dismantle The Heat Exchanger Connections, Foundatio N Olts And Install Lind Flanges On Pipe Connections. ·#Remove The Heat Exchanger. Dewa Will Supply Crane ·#Transport The Phe From Dewa Jeel Ali, M Station To Contractor Workshop. ·#Dismantle The Heat Exchanger Using Special Tools. ·#Carryout Inspection On All Pl Ates 237 No#S. Dewa Representative Will Witness. ·#Generate Report On Existing Plate Conditions. ·#Carry Chemical And Hydro Jet Cleaning Of All Plates 237 No#S. ·#Conduct Crack Detection Of Individual Plates To Identify Leaks If Any Using Light Ray Test Meth Od. Excessive Corrosion May Have Caused Minute Pinholes Or Cracks That Are Notvisile To Naked Eye. ·#If Total Quantity Of Damaged P Lates Are Within 10% Of Installed Quantity Then It Has To E Removed / Replaced Dewa Will Advise After Inspection Dewa Will Supply The Plates If Required ·#If Total Quantity Of Damaged Plates Are More Than 10% Then It Has To E Replaced Dewa Will Supply The Pla Tes. ·#Replace The Gaskets Dewa Will Supply The Gaskets. ·#Carryout Service And Paint On End Frames And Accessories. ·#Carryout S Ervicing Of Nut & Olts And Tie Rods. ·#Assemle The Plates According To Plate Placement Pattern. ·#Prepare And Carry Out Hydro Pressu Re Test On Oth Sides Of The Unit Dewa Representative Will Witness. ·#Deliver The Phe To Dewa Jeel Ali, M Station ·#Assemle The Phe, All Accessories & Pipe Connections ·#Sumit Report On The Activities Carried Out With All Details & Photos. ·#Sumit The Report Of Performance Analysis. ·#Handover And Demoilize. ·#Efore Sumitting The Id, The Contractor Shall Visit The Site And E Fully Familiar W Ith The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc. .#Warranty ·#The Warranty Period For The Work Sha Ll E One Year From The Date Of Completion Of Work Certified Y Dewa. ·#In Case Of Any Damage/Defect Of The Work Carried Out Under Thi S Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair Work And Rectify The Defect W Ithin Short Period Without Affecting The Production Of Electricity And Water. C.#General Terms & Conditions ·#The Contractor Shallensure Housekeeping On A Daily Asis And The Contractor Shall E Responsile For All Waste Material Disposals To Designated Places. ·# All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Execution Of The Work. The Contr Actor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. ·#Scaffolding If Required Shall E Arra Nged Y Dewa. ·#Crane If Required Shall E Arranged Y Dewa. ·#All Rigging And Transporting Equipment Should E Arranged Y The Contracto R. These Equipment Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certificates Should E Produced On De Mand. Qualified Rigger, Mechanics Should E Provided. ·#The Work Shall E Executed Under Dewa Supervision And As Perquality/Schedule Requirement. ·#Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. ·#Entry Permits For The Staff/Workers Should E Applied With Passport Copies Having Valid Visa. Persons, Whose Names Are Not Availale In The List, Will Not E Allowed To E Nter The Powerhouse. ·#Entry Permits For The Vehicle Should E Applied With Copies Of Vehicle Registration. ·#Dewa Will Arrange Neces Sary Ptw / Lc / Hwp From Operation, Chemical La / Fire Department Clearances To Carry Out The Scope Of Work Under This Contract. ·#T He Contractor Upon Receiving The Work Permit Shall First Ensure A Safe Working Condition. ·#All The Persons Should Wear All The Requ Ired Ppe While At Work. ·#All Material And Tools Rought In Shall E Declared At Powerstation Security Gate And The List Of These Ite Ms Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engineer In-Charge On Daily Asis. This Doc Ument Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo. ·#Service Air, Electricity And Water F Or Work At Dewa Site. It Is The Responsiility Of The Contractor To Have His Own Arrangement In Extending The Electricity And Water Utility To His Places Of Work Including Lighting.

GTN :14107487
Dubai - Dubai

GLOBAL Hire Our Expertise :

  • Tender Bidding
  • Tender Consultancy
  • Tender Advisory
  • Identify Eligibility Criteria
  • Identify Penelty Clauses
  • Highlight Important Dates
  • Technical Bid Preparation
  • Offline Bid Preparation
  • Online Bid Preparation
  • Offline Bid Submission
  • Online Bid Submission
  • Track Corrigendum / Addendums
  • Attend Pre Bid Meetings
  • Consistent Liaison & Coordination
  • EMD Follow Ups

GLOBAL - bidding
image

We heartily welcome your move to excel your business to new heights.

Set Tender Alert

Activate daily alerts to know the tenders available of your work.

Get alerts

Bidding Support

Ask experts, how to fill bid forms, submit bids, participate in bids.

Get in touch

GeM Registration

Looking for GeM Registration? Get in touch with us and we will do the needful.

Registration

Digital Certificate

Get DSC for e-Tendering, e-Auction, e-bidding, Corporations / Associations / Others Tenders

Purchase now

Tender Awards

Want to know who's got the tender and are looking for subcontracting?

Connect now

Projects

Government and other private players, Real-time Updates of Project Information

Get info

International Tenders

We almost cover all the regions and countries across the world. Click to take your business to new heights.

Start now

Web Design

Get the Best Offers & Deals, expertise in developing static websites, dynamic websites and e-commerce.

Design now