Latest and live tenders published in qatar. Click on any tender to view further details.
contractor shall carryout engineering, procurement, installation /construction, inspection, testing, pre-commissioning and commissioning epic for implementation of the following shutdown sensitive instrument plant change requests in ngl-3 plant, mesaieed operations: conversion of ngl-3 & gsf esd trip switches to transmitters pcr 627 & 632 ngl-3 sour gas compressor trip logic modification pcr 600
scope of services pertains to providing non destructive testing ndt inspection survey vessel vessel to support its offshore inspection activities and the following tasks: a transport passengers and equipment from qp offshore supply base, halul harbour and other port, to and from various offshore locations. b accommodate passengers on a daily basis with full messing facilities. c manoeuvre close beside or moor to wellhead jackets and other offshore locations. d transfer scaffolding and any other equipment by crane from the vessel to worksites as directed. e provide evacuation fire fighting cover for personnel working at offshore locations.
supply of dry cell alkaline batteries for all qp locations on long term agreement basis, as and when required, for a period of five 5 years
1. scope of work of this contract is engineering, procurement, installation, testing and commissioning to upgrade five 5 nos. of gas chromatograph gc analysers at qp refinery which are loacted in different units with sampling system, oven, columns, valves, fittings, cables and analyser cabinets. 2.,, contractor shall be responsible for the design, manufacture / fabrication, assembly, transportation to qp refinery, installation, inspection, testing, commissioning and documentation of the complete analyser system with sampling system, oven, columns, valves, fittings, cables, analyser cabinet, operator interface computer, communication requirement between analysers, computer and distributed control system dcs and auxiliary equipment as given below in the detailed scope of work. 3.,, contractor shall be responsible for the removal of the existing analyser system in the analyser house. 4.,, contractor shall provide any other items not specifically detailed within this document, but required for the correct and satisfactory operation and maintenance of the whole analyser system. 5.,, it will be the responsibility of the contractor to make site visit during tendering / bidding stage to study and understand the existing analyser systems for the removal or retaining of part of existing components.
supplier to perform the supply of process instrumentation components and parts of various propreitary manufacturers for all qp locations on as and when required basis through long term agreement.
request for quatation 5 years contract for provision of skilled manpower to carry out garage activities, maintenance of heavy equipment and lubricantion services in qapco complex.
operational support manpower for pot lines in reduction for summer period 2019 to 2021.
supply of all-in-one digital recorder w software - fy18 req#c
construction of food store, showroom, office & accommodation 2000 sqm birket al awamer
repair and maintenance of damaged underground ehv power cables