contractor to review the current situation, assess the needs for the provision of primary care and occupational health services to all qp and asset operators staff and contractors working within mic specifically, and the provision of ambulance services in the qp industrial cities as a whole, and recommend the best model option from a medical, operational, legal and financial perspective.
the scope includes the provisions demolition and removal of the existing temporary cables and to perform any modifications/ upgrade on the existing facilities/ structures/ utilities and to carry out engineering, procurement, installation, testing, pre-commissioning and the commissioning for two 2 new busbar and bus ducts and its accessories to feed load from 11kv/433v transformers tbd-6 & 7 to 415v switchboard qd-18 at ngsl mesaieed.
the purpose of carrying out the ecological survey is to assess the current environmental conditions of sea water, sediment and biota in the vicinity of and around the al-rayyan field and halul island. results of the surveys conducted will help qp to establish the marine environmental conditions and provide inputs to the regulatory body, i.e. the ministry of municipality and environment mme. the results of the surveys will depict the impacts of the production activities on the surrounding environment. the analysis and reports of the survey will also serve as a new baseline against which future survey results could be compared to. when further field developments are undertaken, these results will be taken into account for environmental impact assessment studies.
stocking & supply of landscaping, irrigation materials and animal feeds for qatar energy on call-off basis for a period of five 5 years. the scope of supply requires the supplier to perform stocking and supply of landscaping, irrigation materials and animal feeds for various qatar energy locations on long term agreement as and when required basis.
the scope of work includes engineering, procurement, installation, testing, pre-commissioning and commissioning of the following in qp refinery, mesaieed: i,, upgrade of existing siren systems located in ccb and the two sirens located outside ccb and near unit 51old boiler area. ii,, new sirens in various areas i.e. near flare area, near ps-108 area and near ps-104 area at qp refinery and integrate with the upgraded siren systems in ccb.
qp refinery insurance assessor made risk observations / safety recommendations to qp with regard to containment of pool fires in susceptible fire zones & existing bund wall heights. hence, qp refinery initiated a study lc17106700 to review the kerbing / drainage requirements in fire susceptible zones and to recommend new kerbing / drainage system wherever required. also, existing bunds around tanks were identified which donot comply with refinery design criteria. this project is being carried out to implement the recommendations of study lc17106700. objective of this contract is to design, procure, install and construct new kerbing with associated drainage system at qp refinery in accordance with the scope of work, drawings and specifications. the main activities include but not limited to: new kerbing with drainage system, , design of new kerbing / grade slab / sump / manhole / drainage system., , underground scanning., , construction works., , hydrocarbon protection coating. increase of existing bund wall heights, , adequacy / storage capacity checks., , design of new bund / dyke walls, associated works to carryout the enhancement / modifications, etc., , construction works., , hydrocarbon protection coating.
modification of existing chemical store, associated building services and external works at dukhan.
contractor shall provide a tanker berthing assistance tug and supply all equipment, tools, tackle, personnel, services, supervision, consumable materials and each and every item of expense necessary for the provision of tanker berthing assistance tug at offshore locations. contract duration shall be one hundred twenty two 122 calendar months i.e. 10 years and 2 monthsfrom the effective date
epic for modification and improvement works to the existing occupied buildings at ngl complex, mesaieed. required as per the recommendations of mic qra 2015 and sq technical note on mitigation measures for ngl complex occupied buildings: which shall include: conversion of buildings nos. 7 & 9 into a new ngl laboratory. installation of toxic and flammable gas detectors at all occupied buildings. modification of the buldings hvac systems to close the fresh air intakes on detection of gas. upgrading the builidings to meet current building and safety codes and regulations and to meet safe haven standard. preparing the requirements for the demolition by other contractor at a later date of the buildings and portacabins that are to be abandoned.
supply, installation, implementation, training and maintenance and support of a commercial off-the-shelf fire station management fsm system.