You have searched for bellary in Projects. Click on any project to view further details.

1 Proposed Expansion Of Coal Tar Distillation And Addition Of Carbon Black Plant At Musinayakahalli, Taluk Sandur, District Ballari, Karnataka
2 Sri Subramanya Sponge Iron Is Planning To Set Up A Mini Integrated Steel Plant With A Capacity Of 1.32 Lakh Tpa At Haraginadoni Village In Ballari District Of Karnataka.
3 Ranjitpura Infrastructure To Planning To Set Up A Direct Reduced Iron Dri Manufacturing Unit At Ranjithpur In Ballari District Of Karnataka.
4 Jayasaketh Chemicals Plans To Set Up An Bulk Drugs Mfg Unit In Mundrigi Industrial Area, Ballari
Project No # 23541 |  Bellary - Karnataka
Project Cost :   NA
Posted Date :   10 Jul, 2018
jayasaketh chemicals plans to set up an bulk drugs mfg unit in mundrigi industrial area, ballari
5 Arcelormittal India Plans To Set Up An Iron And Steel In Bellary
Project No # 23388 |  Bellary - Karnataka
Project Cost :   NA
Posted Date :   01 Jun, 2018
arcelormittal india plans to set up an iron and steel in bellary
6 Avaada Non-Conventional Energy Plans To Set Up An Electric Power Using Solar Energy In Bellary
Project No # 22295 |  Bellary - Karnataka
Project Cost :   NA
Posted Date :   26 May, 2018
avaada non-conventional energy plans to set up an electric power using solar energy in bellary
7 Shri Lakshmi Metal Udyog Plans To Set Up Black & Pre-Galvanized Pipe And Hollow Sections In Bellary
Project No # 22272 |  Bellary - Karnataka
Project Cost :   NA
Posted Date :   26 May, 2018
shri lakshmi metal udyog plans to set up black & pre-galvanized pipe and hollow sections in bellary
8 The Sandur Manganese & Iron Ores Plans To Set Up An Integrated Iron And Steel Project In Karnataka.
Project No # 22172 |  Bellary - Karnataka
Project Cost :   NA
Posted Date :   25 May, 2018
the sandur manganese & iron ores plans to set up an integrated iron and steel project in karnataka.
9 Mastek Steels Has Put On Hold A Coal-Based Cpp Unit In Bellary, Karnataka
Project No # 22106 |  Bellary - Karnataka
Project Cost :   NA
Posted Date :   24 May, 2018
mastek steels has put on hold a coal-based cpp unit in bellary, karnataka
10 Laying And Jointing Of Pre-Stressed Concrete Cylinder Pccp Pipeline.
Project No # 21617 |  Bellary - Karnataka
Project Cost :   Rs. 523.09 Crores
Posted Date :   31 Jan, 2018
laying and jointing of pre-stressed concrete cylinder pccp pipeline.

Set Upcoming Bellary Project Alert...

323541

Advertisment