Notice Inviting Tender (NIT) by the Central Government And Public Sector Of India for
Supply, Installation & Commissioning Of Od Type 100 Kva, 11/0.433 Kv, 3 Phase, 50 Hz Step Dow N Distribution Transformer, Copper Wound With First Filling Of Oil As Per Is:355 And Other Fittings And Accessories Like - Ht Bushing With Complete Metal Parts-03 Nos, Lt Bushing With Complete Metal Parts-04 Nos, Gasket-01 No. Si Lica Gel Breather With Charge-01 No.Etc Complete As Required As Per Is:1180 Part-I Of 2014 Or Latest The Transf Ormer Requirements Of The Latest Issues Of Is:1180 Part-I Of 2014 And Is:2026 And Other Is All As Per Latest Issu Es Make- Abb, M.E.I., Eastern Transformer, Areva, Airen Power, Melcon, Etc, Servokon, Servostar, Arihant Or Reputed Make. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation & Commissioning Of Od Type 100 Kva, 11/0.433 Kv, 3 Phase, 50 Hz Step Dow N Distribution Transformer, Copper Wound With First Filling Of Oil As Per Is:355 And Other Fittings And Accessories Like - Ht Bushing With Complete Metal Parts-03 Nos, Lt Bushing With Complete Metal Parts-04 Nos, Gasket-01 No. Si Lica Gel Breather With Charge-01 No.Etc Complete As Required As Per Is:1180 Part-I Of 2014 Or Latest The Transf Ormer Requirements Of The Latest Issues Of Is:1180 Part-I Of 2014 And Is:2026 And Other Is All As Per Latest Issu Es Make- Abb, M.E.I., Eastern Transformer, Areva, Airen Power, Melcon, Etc, Servokon, Servostar, Arihant Or Reputed Make. Warranty Period: 30 Months After The Date Of Delivery
in Sonpur - Bihar has been published.
The last date of this tender is 23/04/2024, work value is
0 (Refer Doc) INR,
EMD is 0 (Refer Doc) INR
and tender document fees is
0 (Refer Doc) INR
For more details call us on +91 92760 83333 for bidding support this tender, GeM, vendor registration (if any) and tender BOQ documents.