Notice Inviting Tender (NIT) by the State Government Of Tamil Nadu for Strengthening Of The Road From Kunnur Road To Nagalur Road Km 0/0 - 3/2 Clearing Scrub Jungle Including Cutting All Trees And Other Vegetation And Depositing Them Beyond The Road As Directed By The Departmental Officers Including All Labour Charges Etc., Complete. Km 0/0-1/200 Earth Work Excavation And Depositing On Bank Within Initial Lead Of 10M & Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Ss .20.A Picking 5 Cm To 10 Cm Old Metalled Surface And Sectioning - 1 Sqm . Km 0/0 - 3/2 Providing And Laying Gravel To 100Mm Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction . Km 0/0-3/20 Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadamwmm Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 150Mm Thick With Pavers In Subbase/Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete. Km 0/0-1/0 Km 1/0-2/0 Km 2/0-3/0 Km 3/0-3/2 Providing And Laying Prime Coat Over The Wmm Surface Using 7.00 Kg Of Bituminous Emulsion For 10 Sqm. Including Cost Of Bituminous Emulsion Which Will Be Supplied By The Department At Section Stores And Its Cost Will Be Recovered As Per Special Condition Appended Including Labour Charges For Preparing The Surface For Laying Tack Coat And For Applying Required Quantity Of Bituminous Emulsion By Mechanical Sprayer Including Hire And Fuel Charges For All Tools And Plants Employed Etc., Complete As Per Clause 503 Of Most Specification. Km 0/0-1/0 Km 1/0-2/0 Km 2/0-3/0 Km 3/0-3/2 Providing And Laying Tack Coat Over Theprime Wmm Surface Using 2.50 Kg Of Bituminous Emulsion For 10 Sqm. Including Cost Of Bituminous Emulsion Rs-1 Including Labour Charges For Preparing The Surface For Laying Tack Coat And For Applying Required Quantity Of Bituminous Emulsion By Mechanical Sprayer Including Hire And Fuel Charges For All Tools And Plants Employed Etc., Complete As Per Clause 503 Of Most Specification. Km 0/0-1/0 Km 1/0-2/0 Km 2/0-3/0 Km 3/0-3/2 Providing And Layiing Pre-Mix Carpet 20Mm Thickness Using 0.18Cum Of 13.2 Irc Machine Crushed Metal 0.09Cum Of 11.2Mm Irc Machine Crushed Metal With 14.60Kg Of Bitumen For Pre-Mixing 10 Sqm Of Pre-Mix Carpet And Laying Separately Seal Coat Type A Using .09 Cum Of 6.70Mm Irc Hbg Chips With 9.80 Kg Of Bitumen For 10Sqm Including Cost And Conveyance Of Materials To The Departmental Metric Gauge For Pre-Measurement Heating The Bitumen Boiler Heating The Aggregate And Mixing Them With Bitumen In Mini Hot Mix Plant For Pre-Mix Carpet And Rolling By 80-100 Kn Power Roller Including Labour Charges For Spreading Hire And Fuel Charges For Mini Hot Mix Plant, Bitumen Boiler, All Other Tools And Plants Employed Etc., Complete . Km 0/0- 1/0 Km 1/0-2/0 Km 2/0-3/0 Km 3/0-3/2 Kilometre Stone Hectametre Stone Sign Baord 1.A Constuction Of Protection Wall @ Km 0/0 - 1/0 Earth Work Excavation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting, Etc Complete Per Ss 20 B. Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Foundation Supplying And Erecting Centering Shuttering Including Necessary Supports For Plane Surface In Foundation And Basement And In All Floors For R C C Column Footing Column Plinth Beam, Beams, Roof Slabs, Staircase Steps, Bed Blocks, Critical Pier Etc . Cement Concrete 1 : 3 : 6 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Collection And Supply Of Gritty Gravel From Appd Quarry Including Cost And Conveyance Of All Materials To Site Including All Labour Charges For Filling Etc.Complete, 1.B Constuction Of Well Protection Wall @ Km 0/0 - 1/0 Earth Work Excavation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting, Etc Complete Per Ss 20 B. Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Foundation Supplying And Erecting Centering Shuttering Including Necessary Supports For Plane Surface In Foundation And Basement And In All Floors For R C C Column Footing Column Plinth Beam, Beams, Roof Slabs, Staircase Steps, Bed Blocks, Critical Pier Etc . Cement Concrete 1 : 3 : 6 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Collection And Supply Of Gritty Gravel From Appd Quarry Including Cost And Conveyance Of All Materials To Site Including All Labour Charges For Filling Etc.Complete, 1.C Constuction Of Protection Wall @ Km 1/0 - 2/0 Earth Work Excavation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting, Etc Complete Per Ss 20 B. Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Foundation Supplying And Erecting Centering Shuttering Including Necessary Supports For Plane Surface In Foundation And Basement And In All Floors For R C C Column Footing Column Plinth Beam, Beams, Roof Slabs, Staircase Steps, Bed Blocks, Critical Pier Etc . Cement Concrete 1 : 3 : 6 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Collection And Supply Of Gritty Gravel From Appd Quarry Including Cost And Conveyance Of All Materials To Site Including All Labour Charges For Filling Etc.Complete, 1.D Constuction Of Hard Bed @ 2100-2120M Construction Of Un-Reinforced, Dowel Jointed At Expansion And Construction Joint Only, Plain Cement Concrete Pavement, Thickness As Per Design Over A Prepared Sub Base, With 43 Grade Cement Or Any Other Type As Per Clause 1501.2.2. M30 Grade Coarse Including All Charges Etc., Complete Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package in Salem - Tamil Nadu has been published.
The last date of this tender is 01/03/2021, work value is  0 (Refer Doc) INR, EMD is  101000 INR and tender document fees is  0 (Refer Doc) INR
For more details call us on +91 92760 83333 for bidding support this tender, GeM, vendor registration (if any) and tender BOQ documents.

Tender Document

Related Information

Location

Salem - Tamil Nadu ( IN )

Ownership

State Government Of Tamil Nadu

Sector

Construction

Important Dates

Published on

25 Feb, 2021

Submission Date

01 Mar, 2021

Opening Date

01 Mar, 2021

Key Values

Work Value

Refer Doc

EMD

1.01 Lacs

Document Fee

Refer Doc
Tender Document Liaison Service Connect with us