Notice Inviting Tender (NIT) by the Central Government And Public Sector Of India for
Review Of Designs, Drawings, Method Statements, Soil Investigation Reports, High Embankment Design Including Stability Of Slope And Ground Improvement If Required, Shop Drawings, As Built Drawings, Etc Submitted By The Epc Contractor Appointed For Execution Of New Mokama Bridge Across River Ganga And Its South End Approach
in Patna - Bihar has been published.
The last date of this tender is 02/04/2019, work value is
16400000 INR,
EMD is 0 (Refer Doc) INR
and tender document fees is
0 (Refer Doc) INR
For more details call us on +91 92760 83333 for bidding support this tender, GeM, vendor registration (if any) and tender BOQ documents.